Loading...
HomeMy WebLinkAboutEX01C e d ar Riv er Left Bank Floodwall (Accessible from E Perimeter Road) Left Bank Floodwall (Requires access from airport gate) South Boeing Bridge DO NOT CROSSRainier Ave NLogan Ave NW Perimeter RdN 6th StE Perimeter RdWilliams Ave NAirport Way Burnett Ave NNishiwaki LnTaylor Ave NWHardie Ave NWN 4th St N 1 st S t NW 5th St Burnett Aly NWilliams Aly NN 8th St NW 4th Pl NW 4th St Nelson Pl NWN 5th StTaylor Ave NWBurnett Aly N±400 0 400200 Feet Cedar River Vegetation Maintenance Schedule B - Inspection Path Clearing Figure L-13 Work Description: Brush a 4-ft inspection path behind the floodwalls on the riverside. Remove shrubs and vegetation directly in the 4-ft path. Either hand pull stem and roots, or cut and remove stems and apply glyphosate or other approved herbicide to cut stems. Also cut any branches that may hang over the 4-ft path from the river bank. EXHIBIT 1 RECEIVED 07/01/2021 BGillia PLANNING DIVISION DocuSign Envelope ID: ED725D39-8815-4729-A220-67AE692E3D2F