Loading...
HomeMy WebLinkAboutMFP21002324.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21002324 IVR Number: 21002324 Permit Information Permit Name: Century Link Permits Address/Location:05/18/2021Application Date:7227900075Parcel Number: 2900 NE 10TH ST Permit Type:07/20/2021Issue Date:Franchise Permit Work Class:07/20/2022Expiration Date:Minor Utility Job Number: N.593002Franchise Type:Telephone Description: Century Link/Lumen to access MH424, unk HH, PED, CBO HH, and overlash on 3 poles. Contacts Name Address PhoneTypeBilling Austin Sweeney Century Link Applicant Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date QWEST corp d/b/a CenturyLink QC Austin Sweeney 253 766 7549 Austin.sweeney@centurylink.com Northsky Communications 425 615 7121 NORTHSC857Q4 BL.028638 N.593002 2900 NE 10th St Revised to: CenturyLink/Lumen to access MH424, Unk HH, Ped, CBO HH, and overlash on 3 poles. X X X X X 5/18/2021Austin Sweeney MFP21002324 Scott Warlick RESTORATION PER CITY OF RENTON STANDARDS 7/20/2021 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering N.593002 2900 NE 10th St Monday Friday 8:00am 3:00pm Revised to: CenturyLink/ Lumen to access MH424, Unk HH, ped, CBO HH, and overlash on 3 poles. Northsky Communications LLC.425 615 7121 Austin Sweeney Austin.sweeney@centuryLink.com 23315 66th Ave S Kent 98032 MFP21002324 Scott Warlick CED 7/20/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Austin Sweeney Austin Sweeney 5/18/2021 NTRAFFIC CONTROL PLAN JOB # N. 593002. C. 45 PERMIT # HARRINGTON AVE NE @ GLENWOOD AVE NE HH ACCESS SHOULDER WORK LEGEND CONES S SPOTTER WORK AREA WORK TRUCK SHEET 1 OF 1 Jeffrey Hubbard Comments: SIGN SPACING MPH "X" 20-25 100'30 200'35-45 350'50+ 500' Comments: CHANNELIZATION SPACING MPH TAPER TANGENT25 / 30 20' 40'35 / 45 30' 60'ONE-LANE TWO-WAY TAPER 50' TO 100' NOT TO SCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12' SHIFTING 20 70 75 80 TAPER 25 105 115 1651/2 L 30 150 165 18035 205 225 245SHOULDER 40 270 295 320 TAPER 45 450 495 540 1/3 L 50 500 550 600 Designed For: LUMEN Project # N. 593002. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Draw Date: 5/11/2021 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ Date:5/11/2021 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 593002. C. 45 CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 36" x 36" B/O unless otherwise specified.4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width. 6. Work hours will be determined by City of RENTON. UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTER THIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM Comments: ACCESS HH LOCATED OFF ROADWAY. THIS WILL BE SHOULDER WORK. TRAFFIC FLOW IS NOT IMPACTED. MAINTAIN 22' MINIMUM ROAD WIDTH. RESTRICTED PARKING IN WORK ZONE. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALKS REMAIN OPEN/ACCESSIBLE. SPOTTER WILL ASSIST AT WORK AREA. SPEEDLIMIT 25 PARKING AREA PARKING AREA SIDEWALK SIDEWALK 100' +-ROADWORKAHEADW20-1SHOULDERWORKW21-5100' +- 100' +-ROADWORKAHEADW20-1100' +-ROADWORKAHEADW20-1291911SPOTTERSNOFROMTOTOW AWAY AREAPHONE 684-5444YOUR COMPANY NAME 555-5555PARKINGR7-T39NOFROMTOTOW AWAY AREAPHONE 684-5444YOUR COMPANY NAME 555-5555PARKINGR7-T3922' MIN HH ACCESS WORK ZONE 7' X ~60' 29 25 HARRINGTON AVE NE HARRINGTON AVE NE GLENWOOD AVE NEGLENWOODAVE NE100' +-ROADWORKAHEAD W20-1 www.invarion.comMFP21002324 NE 12TH STNE 12TH STHARRINGTON AVE NE HARRINGTON AVE NE GLENWOOD AVE NEGLENWOOD AVE NE NE 10TH STNE 12TH STTRAFFIC CONTROL PLAN JOB # N.593002.C.45 PERMIT # Legend WORK AREA WORK TRUCK CONES SPOTTER PEDESTAL ONE LANE TWO WAY TAPER 50' MIN/100' MAX Date:4/1/2021 Author:Darlene Durr, Traffic Control Supervisor Project:N.593002.C.45 CERT:TCS # 011915 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be DETERMINED BY CITY. UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: DARLENE DURR, TCS #011915, darlene.durr@hotmail.com CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Approved 4/1/2021Darlene Durr TCS # 011915 Phone 253-737-5198darlene.durr@hotmail.com _______________________Darlene Durr NOT TO SCALE NCTL PED NO PARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 WORK AREA 8' X 60' SHOULDERWORK ROADWORKAHEADROADWORKAHEADROADWORKAHEADROADWORKAHEAD SPEEDLIMIT25SPEEDLIMIT25SPEEDLIMIT25SPEEDLIMIT 25 Comments: THIS IS TO ACCESS CTL PEDESTAL.THIS IS SHOULDER WORK. SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA. PARKING RESTRICTED AT WORK AREA. GLENWOOD AVE NE @ HARRINGTON AVE NE CTL PEDESTAL ACCESS SHOULDER WORK www.invarion.com MFP21002324 NE 12TH STNE 12TH STHARRINGTON AVE NE HARRINGTON AVE NE GLENWOOD AVE NEGLENWOOD AVE NE NE 10TH STNE 12TH STR O A DWORKAHE A D BE PR E PAR E D T O S T O P TRAFFIC CONTROL PLAN JOB # N.593002.C.45 PERMIT # Legend WORK TRUCK X POLE FLAGGER AERIAL WORK AREA ONE LANE TWO WAY TAPER 50' MIN/100' MAX Date:4/1/2021 Author:Darlene Durr, Traffic Control Supervisor Project:N.593002.C.45 CERT:TCS # 011915 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be DETERMINED BY CITY. UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: DARLENE DURR, TCS #011915, darlene.durr@hotmail.com CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Approved 4/1/2021Darlene Durr TCS # 011915 Phone 253-737-5198darlene.durr@hotmail.com _______________________Darlene Durr NOT TO SCALE NSPEEDLIMIT 25 X XX ROADWORKAHEAD BE PREPAREDTO STOP SPE E D L IM I T 2 5 AERIAL +/-390' P4 P3 P2 Comments: THIS IS AERIAL FROM POLE 4 TO POLE 2. THIS IS A ONE LANE TWO WAY MOVING OPERATION WITH FLAGGERS. FLAGGERS WILL MOVE WITH WORK CREW. FLAGGERS WILL HOLD TRAFFIC AT ROADWAY CROSSINGS. FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA. GLENWOOD AVE NE @ NE 10TH ST AERIAL WORK POLE 4 TO POLE 2 ONE LANE TWO WAY MOVING OPERATION WITH FLAGGERS www.invarion.com MFP21002324 NE 12TH STNE 12TH STHARRINGTON AVE NE HARRINGTON AVE NE GLENWOOD AVE NEGLENWOOD AVE NE NE 10TH STNE 12TH STEXISTING CONSTRUCTION EXISTING CONSTRUCTION EXISTING CONSTRUCTION EXISTING CONSTRUCTION TRAFFIC CONTROL PLAN JOB # N.593002.C.45 PERMIT # Legend WORK TRUCK EXISTING CONSTRUCTION HANDHOLE CONES SPOTTER WORK AREA ONE LANE TWO WAY TAPER 50' MIN/100' MAX Date:4/1/2021 Author:Darlene Durr, Traffic Control Supervisor Project:N.593002.C.45 CERT:TCS # 011915 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be DETERMINED BY CITY. UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: DARLENE DURR, TCS #011915, darlene.durr@hotmail.com CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Approved 4/1/2021Darlene Durr TCS # 011915 Phone 253-737-5198darlene.durr@hotmail.com _______________________Darlene Durr NOT TO SCALE NCBO HH GLENWOOD AVE NE @ NE 10TH ST CBO HH ACCESS SHOULDER WORK NO PARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NOPARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 ROADWORKAHEADROADWORKAHEAD S H O U LD E R W O R K ROADWORKAHEADSPEEDLIMIT25S P E E D LI M I T 2 5 SPEEDLIMIT 25 SPEEDLIMIT25Comments: THIS IS TO ACCESS CBO HH.THIS IS SHOULDER WORK. SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA. COORDINATE WITH EXISTING CONSTRUCTION CREW FOR ACCESS TO HH. WORK AREA 8' X 60' www.invarion.com MFP21002324 NE 12TH STNE 12TH ST HARRINGTON AVE NEHARRINGTON AVE NEGLENWOOD AVE NE TRAFFIC CONTROL PLAN JOB # N.593002.C.45 PERMIT # Legend MANHOLE WORK TRUCK CONES WORK AREA SPOTTER ONE LANE TWO WAY TAPER 50' MIN/100' MAX Date:4/1/2021 Author:Darlene Durr, Traffic Control Supervisor Project:N.593002.C.45 CERT:TCS # 011915 LUMEN:Certified Traffic Control Plan (DO NOT ALTER) Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and CITY OF RENTON requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified. 4. Alert affected local residents and businesses. 5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be DETERMINED BY CITY. UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM: DARLENE DURR, TCS #011915, darlene.durr@hotmail.com CHANNELIZING DEVICE SPACING (FEET) MPH TAPER TANGENT 50/70 35/45 25/30 40 40 30 20 80 60 Approved 4/1/2021Darlene Durr TCS # 011915 Phone 253-737-5198darlene.durr@hotmail.com _______________________Darlene Durr NOT TO SCALE WORK AREA 8' X 100'ROADWORKAHEADROADWORKAHEAD SPEEDLIMIT25SPEEDLIMIT25SPEEDLIMIT 25SPEEDLIMIT25MH 424 Comments: THIS IS TO ACCESS MH 424 THIS IS A LANE SHIFT.MAINTAIN 11' LANES AT WORK AREA FOR TRAFFIC FLOW. SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA. PARKING RESTRICTED AT WORK AREA. N 11'ROADWORKAHEADLANESHIFTAHEADROADWORKAHEADLANESHIFTAHEAD11' NO PARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NOPARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NOPARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NOPARKING7 AM -6 PMFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 NE 12TH ST @ HARRINGTON AVE NE MH 424 ACCESS LANE SHIFT www.invarion.com MFP21002324 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.665004000000”NVICINITY MAPDRAFTED BY: MOUNTAIN LTD/DL - 03/24/2123N5E17N.593002W26226RNTNWA012900 NE 10TH STRENTON, WA 9805613(+$'4'0)+0''4.;00'$#;.'552*10'01  Ä(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQO5%12'1(914-0'9(+$'4(41//#0*1.'75+0)':+56+0)7)61*#0&*1.'!6*'0(''&612'&#62'&2.#%'75+0)7)6121.'4+5'47210':+56+0)%10&7+66*'018'4.#5*10':+56+0)%122'46121.'#621.'2.#%'0'9#66#%*/'065722146"ž6*'04+5'4&19061':+56+0)7)61%$1*#0&*1.'"0'6*56MFP21002324 TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/DL - 03/24/2123N5E17N.593002W26226RNTNWA012900 NE 10TH STRENTON, WA 9805623(+$'4'0)+0''4.;00'$#;.'552*10'01  ÄMFP21002324 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/DL - 03/24/2123N5E17N.593002W26226RNTNWA012900 NE 10TH STRENTON, WA 9805633(+$'4'0)+0''4.;00'$#;.'552*10'01  Ä EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP R/W R/W EOP EOP R/W R/W EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP R/W R/W R/W R/W R/W TT1177#72278013551165#72278013601159#72278013651155#72278013701147#72278013751156#72278012651146#72278013301159#81434500001162#72278016701170#72278016751140#72278013251130#722780132030'26'6'10'24'24'24'6' S/W21'30'25'33'6' S/W31'28'25'016'ž1(0'9(+0':7)016'ž1(0'9(+0':7)016'ž1(0'9(+0':7)22'31'26'016'ž1(0'9(+0':7)123016'ž1(0'9(18'4.#5*016'ž1(0'9(18'4.#5*ITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER1318617-16666120'-03"A0610783NEUTRAL 30'-01"STREETLIGHT = 25'-09"004 = 22'-02"005 = 20'-03"EXISTING ATTACHMENTSITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER2318600-16665818'A0610784NEUTRAL = 29'-03"STREETLIGHT = 24'-05"004 = 20'005 = 18'EXISTING ATTACHMENTSITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER3318583-16665417'NO "A" TAGNEUTRAL = 40'004 = 20'-04"005 = 17'ADD ATTACHMENT SUPPORT TO POLE FOR EXCOPPER AND NEW FIBER, THEN RISER DOWN TO EX 4" UG TO NEW HH @ 2900 NE 10TH ST.EXISTING ATTACHMENTST7'MFP21002324 City of Renton Dept. of Community & Economic Development Phone: 425-430-7266 / franchise@rentonwa.gov This letter is requesting an Aerial Variance with regard to a Lumen permit request to place fiber on job N.593002. This job will provide fiber service to a new residential development located at 1073 Harrington Ave NE. The easiest and most cost effective way to feed this site would be to go from the ped on the north side of Glenwood Ave NE and then follow the existing copper path along the pole line to the site. This would cost us about $22k for the placing and splicing. If we were to change the design to an underground trench or bore, this would cost us at least $82k. Furthermore, the development is coming up on occupancy in August. If this is acceptable to the City of Renton we will proceed as planned, otherwise we will not be able to provide this service to the development as requested. Thank You, Adam Thatcher Lumen Engineering – OSP Facility Engineer I 253-740-5533 adam.thatcher@lumen.com July 20, 2021 Adam Thatcher Qwest Corp d/b/a CenturyLink 23315 66th Ave S Kent, WA 98032 Via Email: Adam.thatcher@lumen.com SUBJECT: Request for Undergrounding Exemption (N.593002, MFP21002324, 2900 NE 10th St) Dear Mr. Thatcher: The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. CenturyLink proposes to have North Sky Communications overlash approximately 400 lineal feet of new 24-count aerial fiber to existing Puget Sound Energy (PSE) power poles beginning at the pole on the southwest corner of property 1130 Glenwood Avenue NE, continuing north approximately 400 feet along the east side of Glennwood Ave NE before ending at the pole to the west of property 1156 Glennwood Ave NE. See the enclosed Site Plan showing the proposed overlashing limits. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. City of Renton Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate telecommunications facilities in, under, over or across any public way of the City, and to also provide telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use of such public ways from the City pursuant to Section 5-19-3 of this Chapter.” CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a blanket grant of authority, dating back to territorial times, and therefore has unique status as compared to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink, RCW Section 35.99.030 states that a city or town may not require a “master permit” from service providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per the RCW and Washington State Constitution, cable service is not a right granted without a franchise. Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not the provision of future cable. In addition, staff considered RMC 4-6-090.D. which allows for exemptions due to technological difficulties; when costs outweigh the general welfare consideration implicit in underground installation; or, if the growth pattern of the area has not been sufficiently established to determine the ultimate service routes. Century Link Job N.593002 Page 2 of 2 July 20, 2021 In this instance, the portion of the route proposed for aerial installation is in an area where cost to underground one utility service will be cost prohibitive. DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C) as requested by the applicant for the Project Reach is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i)(ii). Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, August 3, 2021. Due to the ongoing state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working remotely. For that reason, appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or Wednesdays. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Vanessa Dolbee, Planning Director Justin Johnson, Assistant Development Engineering Manager Scott Warlick, Engineering Specialist III Holly Powers, Permit Technician Austin Sweeney, CenturyLink Austin.Sweeney@centurylink.com Franchise Permits NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS(+'.&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/DL - 03/24/2123N5E17N.593002W26226RNTNWA012900 NE 10TH STRENTON, WA 9805633(+$'4'0)+0''4.;00'$#;.'552*10'01  Ä EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP R/W R/W EOP EOP R/W R/W EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP R/W R/W R/W R/W R/W TT1177#72278013551165#72278013601159#72278013651155#72278013701147#72278013751156#72278012651146#72278013301159#81434500001162#72278016701170#72278016751140#72278013251130#722780132030'26'6'10'24'24'24'6' S/W21'30'25'33'6' S/W31'28'25'016'ž1(0'9(+0':7)016'ž1(0'9(+0':7)016'ž1(0'9(+0':7)22'31'26'016'ž1(0'9(+0':7)123016'ž1(0'9(18'4.#5*016'ž1(0'9(18'4.#5*ITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER1318617-16666120'-03"A0610783NEUTRAL 30'-01"STREETLIGHT = 25'-09"004 = 22'-02"005 = 20'-03"EXISTING ATTACHMENTSITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER2318600-16665818'A0610784NEUTRAL = 29'-03"STREETLIGHT = 24'-05"004 = 20'005 = 18'EXISTING ATTACHMENTSITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHER3318583-16665417'NO "A" TAGNEUTRAL = 40'004 = 20'-04"005 = 17'ADD ATTACHMENT SUPPORT TO POLE FOR EXCOPPER AND NEW FIBER, THEN RISER DOWN TO EX 4" UG TO NEW HH @ 2900 NE 10TH ST.EXISTING ATTACHMENTST7'MFP21002324 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP21002324 Engineering 1 A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 2 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15'-6". 4 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and Economic Development Administrator or designee, from the first event triggering the requirement to underground the aerial lines. Page 1 of 1