HomeMy WebLinkAbout2021-07-27 Questions & AnswersMaplewood WTP Roof Replacement QUESTIONS AND ANSWERS 2021-07-27 Questions & Answers\ Page 1 of 2 July 27, 2021 MAPLEWOOD WATER TREATMENT PLANT ROOF REPLACEMENT July 27, 2021 Questions and Answers The following are responses to bidder inquiries and unless incorporated into a formal addendum to the contract, are not part of the contract and are provided for the bidders’ convenience only. The responses may be considered along with all other information furnished to prospective bidders for the purpose of bidding on the project. The use of information provided in these Questions and Answers is not to be construed in any way as a waiver of the provisions nor excuse the contractor from full compliance with the contract requirements. Bidders are cautioned that subsequent responses or contract addenda may affect or vary a response previously given and any such subsequent response or addenda should be taken into consideration when submitting a bid for the project. 1. Question: Do you have an anticipated construction start/end date for the project listed above? Answer: Construction is approximated to take place from August to October 2021. 2. Question: WAC 296-127-01372 classifies all labor on metal roofing or siding at sheet metal labor, which has a rate of $89.61 per hour. Is this correct or can they be classified as simple roofers at $57.30 per hour? Answer: This project includes the installation of new metal roofing, sheet metal flashing and trim, gutters and downspouts, metal decking, and metal ceiling. According to WAC 296-127-01372, Sheet metal workers. For the purpose of the Washington state public works law, chapter 39.12 RCW, sheet metal workers perform the following work: (1) The handling, conditioning, assembling, installing, servicing, repairing, altering and dismantling of the duct work for the heating, ventilation and air conditioning systems regardless of the materials used and the setting and the servicing of all equipment and all supports and reinforcements in connection therewith. Maplewood WTP Roof Replacement QUESTIONS AND ANSWERS 2021-07-27 Questions & Answers\ Page 2 of 2 July 27, 2021 (2) The installation of expansion and discharge valves, air filters, and water filters in heating, ventilation and air conditioning systems. (3) The testing and balancing of air-handling equipment and duct work. (4) The handling, conditioning, assembling, installing, repairing and dismantling (except when a building is demolished) of cornices, gutters and down spouts. (5) The installation of metal siding and metal roof decking, regardless of the fastening method, or what it is fastened to. (6) The installation of furnaces and any and all sheet metal work in connection with or incidental to commercial kitchen equipment or refrigerating plants. (7) The handling, moving, hoisting and storing of all sheet metal materials on the job site and all the cleanup required in connection with sheet metal work. Please verify with the Washington State Department of Labor & Industries to confirm the classification of workers on this public works project. End of Questions and Answers (7/27/2021)