HomeMy WebLinkAboutCO 07CAG-20-126, CO #7-21
Approved by Cheryl Beyer via 7/14/2021 email
6/17/2021
Ref 1137.4
20111 208th AVE SE
RENTON, WA 98058
LIC. EC WESTCCS8928G
Quote prepared by,
Matt Lorenz (206) 718-1303
Bid Item Description QTY Unit Unit Price Amount
B.I. 70 Two Each 3" SCH 80 Signal Crossing Conduits-Wire Note #17 1 LS 2,325.00$ 2,325.00$
B.I. 70 One Each 3" SCH 80 Service Crossing Conduit Upgraded-Wire Note #2 1 LS 1,805.00$ 1,805.00$
B.I. 70 Credit for 2" SCH 80 Service Conduit Crossing-Wire Note #2 1 LS (2,244.00)$ (2,244.00)$
B.I. 70 Shattuck J-Box Upgrades (1 EA Type 2 and 1 Ea Type 8)1 LS 4,135.00$ 4,135.00$
B.I. 70 Shattuck Service Locking Type 2 J-Box 1 LS 1,275.00$ 1,275.00$
B.I. 70 Shattuck Service Cut-Over w/ PSE 1 LS 3,855.00$ 3,855.00$
B.I. 70 Concrete Adder-3000 to 4000P Mix 1 LS 652.00$ 652.00$
Sub-Total 11,803.00$
Total Amount 11,803.00$
ALL QUOTATIONS ARE SUBJECT TO CHANGE 30 DAYS FROM
QUOTE, IF NOT ACCEPTED.
Two Each 3" SCH 80 Conduit for Signal Crossing, One Each 3" SCH 80 Conduit for Service Crossing, Two Each Type 2 Locking Boxes,
One Each Type 8 Locking Box, Intercept/Cut-Over of Existing Service Conduit, and 4000P Concrete Upgrade.
Conditions:
General Contractor to Provide Lay Down Area for Materials and Equipment.
Notes:
Assume All Existing Conductors/Conduits In Working Order With No Obstructions-Proposal Excludes All Adjusts/Repair Of Existing Conductors/Conduits.
WE ARE A LICENSED AND BONDED ELECTRICAL CONTRACTOR.
Per C/O Directive #9:
Exclusions:
Traffic Control, Survey, Hard Surface Removals & Replacement, Select Backfill, CDF, Spoils Removal, Cold Mix, Landscape Restoration,
Foundation Removals, Tempoary Vehicle Detection, Night/Weekend Work, Street Use Permit, and Bond.
Project #REN2 Bid Date: 2/2/2021 @ 11:00 am PST
Lake Washington Loop Trail Project, City of Renton, WA
Addendums #1, #2 and #3 Acknowledged
C/O 9-Shatuck Traffic Signal/PSE Crossing Quote
InclusionsAdd 12% for sub-
contractor mark =
$652.00 x 1.12 =
$730.24
ACI Quote