Loading...
HomeMy WebLinkAboutMFP21002814.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21002814 IVR Number: 21002814 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:06/17/2021Application Date:3342100165Parcel Number: 713 N 33RD ST Permit Type:07/29/2021Issue Date:Franchise Permit Work Class:07/29/2022Expiration Date:Minor Utility Job Number: 101139044Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REMOVE 2 EXISTING OH SERVICES AT P01 (319315 1660661). REPLACE BO POLE AT P01 AND INSTALL NEW OH TRANSFORMER ON NEW POLE. INSTALL NEW HANDHOLE AT HH1 AND INSTALL OH UG SEC WIRE FROM P01 TO HH1. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL PARAS MALIK 26220 116TH AVENUE SOUTHEAST UNIT 201 KENT , WA 98030 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101139044 713 N 33RD ST Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 JESSE.DOUCET@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21002814 Scott Warlick CED 7/29/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG P01N 33RD STW A S H I N G T O N B L V D N11111111 12 12 W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AW20-4ONE LANEROADAHEAD100'100'ROADWORKAHEADW20- 1 ROADWORKAHEADW20-1ROADWORKAHEADW20-1 STOP FLAGGER PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURETEMPORARY TRAFFIC CONTROL PLANTRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/02/2021 1011390440713 33rd St N, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP21002814 N 33RD STW A S H I N G T O N B L V D N11111111 12 12 W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AW20-4ONE LANEROADAHEAD100'100'ROADWORKAHEADW20- 1 ROADWORKAHEADW20-1ROADWORKAHEADW20-1PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKHH01 STOPFLAGGERSTOPFLAGGER RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURENotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/02/2021 1011390440713 33rd St N, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANTRENCH28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002814 32163300805803740806807LAKE WASHINGTON BLVD N LAKE WASHINGTON BLVD NN 33RD ST7133212SITE PLANNVicinity Map47.520294, -122.208507Owner / Developer Contact InfoofficeATTN:PARAS MALIK713 N 33RD STRENTON, WA 98057PARAS MALIK206 271 9999SuperiorORDER#NOTIF#PWRPROJECT PHASEFOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.E-Mail:Cell Phone:Project Manager Contact Information:Manager:JESSE DOUCET206 573 3576JESSE.DOUCET@PSE.COMSCALE: 1" = 50'N/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)N/AUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJESSE DOUCET206 573 35764/28/2021Z. VAN SANTFORD206 512 94084/28/2021N/AN/AN/AZ. VAN SANTFORD206 512 94084/28/2021RW-xxxxxxRENTONPARAS MALIKREPL B/O POLE, NEW HH, 3 PERM SVC'S713 N 33RD ST, RENTON, WA 98057N/AN/AN/AN/AAS NOTED1 OF 2KING COUNTYN/AN/ACSPSKEPMSE 31-24N-05EN/AN/AA2405E124D2405E124R2405E124HAZ-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/APerm. ServiceRemoved at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary Voltage P01 POLE RETIREMENT TABLE TEMP TRANSFERSST. LIGHT TRANSFERSSITE#POLE DATAPOLETELTVFIBERTRANRMVDID NUMBERGRID #HEIGHTCLASSYEARTOPPEDRMVDP01XXXX-XXXXXXXXXXXSCALE: 6" = 1 MILEOVERHEAD CIRCUIT MAP POWER GENERAL NOTES - RESIDENTIAL PROJECT1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviationfrom this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foreman'sCopy.2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance. CUSTOMER NOTESCustomer is responsible for all trenching, select backfill, compaction & restoration per Puget Sound EnergyStandards & Local Municipality (See PSE Electric Service Handbook for more details).1.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior tocommencing work to get the underground facilities located.2.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole,sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by theProject Manager.3.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils orconstruction materials which would restrict construction and/or equipment access, before work can begin.4.Roads shall be paved or have a compacted , crushed rock base in place.5.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (orguard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet awayfrom water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot whencrossing them.6. All work is to be done in accordance with local municipal and county permit requirements as applicable.7.Inclement weather conditions may cause delays in construction times and dates.8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. Thecustomer will provide any and all shoring or they will side slope the trench to 1:1.9.EROSION & SEDIMENT CONTROL: Erosion & sediment control shall be per PSE standard practice0150.3200 techniques for temporary erosion & sediment control & any additional local jurisdictionrequirements. (Local jurisdiction may have additional requirements including notes detailing whereerosion or sediment control structures are to be installed, cross section details of the typical erosionstructures, & special requirements for work in sensitive areas.)10.Customer is required to have meter inspected and approved by L&I/City prior to construction.Pole RemovalMisc. OHInstalled at site:Grid Number:kVA Rating:TRANSFORMER INSTALLATION (OH)Company ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:Foreman to redline the following information N/AN/AN/AN/AN/APSE Locates Req'dDeveloper Locates Req'dYesNoFlagging Req'dOutages Req'dCIRCUIT FEET ADDED: 0'SCALE: NTSUNDERGROUND CIRCUIT MAPSCALE: NTSPARTIAL PLANARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEENU-1606/2020260.00246.00264.001.300.000.00261.30246.00264.00CUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:VAULTS & WORK PITS.-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT P01-REQUIRED TO PROVIDE 4’ X 4’ WORK PIT & 3/4 CUBIC YARD OF SAND AT M01, M02, & M03TRENCHING & CONDUIT.-INSTALL ± 120' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM P01 TO HH1.-INSTALL ± 20' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM HH1 TO M01.-INSTALL ± 20' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM HH1 TO M02.-INSTALL ± 20' OF 1-3" SCH'L 40 GREY PVC CONDUIT FROM HH1 TO M03.-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .POLE TABLE (NEW)Site#Pole DataGrid #HeightClassYearRemarks / Location Ref.P01XXXXX-XXXXX5012015PSE Equip #LRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:713 (M01)4500200AGAS140ALRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:B1 12,000 SQ FT81,493600AELEC38KW651.8 @ V010.3 @ V01LRC:% V. Drop:% Flicker:Sq. Footage:Panel Size:Heat Type:Est. Demand:C 53,000 SQ FT487941,600AELEC143KW652.5 @ V022.4 @ V02SITE SPECIFIC NOTESAT P01: 567800-163379-EXISTING 1972 40' UNK CL POLE TO REMAIN-INSTALL (1) STIRRUP, BOLTED & HOT CLAMP #4-4/0 & TAP AØ (MID: 2254000 & 2153100)-INSTALL (1) 25kVA OH TRF 120/240v W/ LB C/O (FUSE @ 10T) PER STD 6025.1000 (TRFNXF)-INSTALL (1) 3" SEC RISER ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS)± 30' ___' ACTUALAT HH1:-EXISTING 1972 40' UNK CL POLE TO REMAIN-EXISTING 15KVA 120/240V TRF TO REMAINAT M01: NEW METER BASE-INSTALL 200A METERAT M02: NEW METER BASE-INSTALL 200A METERAT M03: NEW METER BASE-INSTALL 200A METERSPAN SPECIFIC NOTESP01 TO HH1:-INSTALL 1-RUN 350MCM UG TPX ± 150' ___' ACTUALHH1 TO M01:-INSTALL 1-RUN 4/0 UG TPX, ± 30' ___' ACTUALHH1 TO M02:-INSTALL 1-RUN 4/0 UG TPX, ± 30' ___' ACTUALHH1 TO M03:-INSTALL 1-RUN 4/0 UG TPX, ± 30' ___' ACTUALPROJECT SCOPEREPLACE B/O POLE, INSTALL NEW HH, 3 PERM UG SVC'SNEW CABLE & CONDUIT DIAGRAMNOT TO SCALEYesYesPRELIMINARYONLYNO T FO RCONSTRUCTIONCUSTOMER APPROVALI approve the location of the trench, including road crossings,and all electrical equipment as shown on print.________________________Customer's Signature________________________Print Name/DateMFP21002814RESTORATION PER CITY OF RENTON STANDARDS N/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPJESSE DOUCET206 573 35764/28/2021Z. VAN SANTFORD206 512 94084/28/2021N/AN/AN/AZ. VAN SANTFORD206 512 94084/28/2021RW-xxxxxxRENTONPARAS MALIKREPL B/O POLE, NEW HH, 3 PERM SVC'S713 N 33RD ST, RENTON, WA 98057N/AN/AN/AN/AAS NOTED2 OF 2KING COUNTYN/AN/ACSPSKEPMSE 31-24N-05EN/AN/AA2405E124D2405E124R2405E124HAZ-15N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ATV & TELElectric Service Cable in Conduit3" Schedule 40 Grey PVCExcavated Dirt PileFinal Grade24" Min24" Minto36" MaxCoverSeparation12" Min20" Min JOINT TRENCH DETAILElectric Service Cable in Conduit (NTS)To Excavated Dirt Pile36" MINIMUM COVERIN RIGHT OF WAYBackfill for ConduitFree of rockslarger than 8"in diameter)Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.UTILITY POLE EROSION CONTROL DETAILTOP VIEWFLOWING DITCH or BODY OD WATERSLOPESecure bottom of fencewith gravel bagsPlace straw mulchon disturbed areaExcavated orAugered HolePoleSLOPENot to scaleAdjacent to flowing ditches or bodies of waterInstall silt fence aroundpole excavationFLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS (MID 9995692).6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200Field FaceQuadrantRoad FaceQuadrantClimbingSpace5" MinCLDirection of Vehicular TrafficCL TOP VIEWCONDUIT RISER PLACEMENT DETAIL (P??)SCALE: NONE4' x 4' Work Pit(Pole Butt Must Be Exposed)CUSTOMER-SUPPLIED SERVICE TRENCHMETER DETAIL @ M01, M02, M03SCALE: NONE32"Typical24"Min24"-36"4'Top ViewElectric & Joint UtilityWork Pit Dimensions36"MinDrainage Pipe12" Minimum Clearancefrom Gas Service LinesConduit Depth24" to 36" MaxRegulatorGas MeterAssembly48"4'8"Service (Permanent Detail:)Not to ScaleConduitEndsClosed4'8"24" Min36" Typical3'To TrenchProperty LineConduit StakesCustomer Provided3" Schedule 40 Grey PVCPower Cable ConduitCustomer ProvidedGas Service Line Conduit3" Conduit Service RiserCustomer ProvidedElec. Mtr BaseElec Mtrutility providedGas MeterRelief VentBuilding WallElec. Mtr VentUtility ProvidedSeal24"-36"@ H1A, H1B & H1CSHALL BE STAGGEREDCONNECTOR BARSIN THE FRONTNEUTRALS SHALL BE18"16"13"12"10"2"10"Pedestal will accept up to six 3" conduitsSEALED WITH FOAMCONDUIT SHALL BE120 PVC CONDUIT ELBOWSTYPICAL 24" RADIUS DBSIDE VIEW WITH CONDUIT10"18"16"13"10"2"36"FRONT VIEW WITH CONDUITSECONDARY PEDESTAL DETAIL NOT TO SCALEPRELIMINARYONLYNO T FO RCONSTRUCTION MFP21002814