Loading...
HomeMy WebLinkAboutMFP21003254.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21003254 IVR Number: 21003254 Permit Information Permit Name: Century Link Permits Address/Location:06/15/2021Application Date:5126900211Parcel Number: 3300 MAPLE VALLEY HWY Permit Type:08/02/2021Issue Date:Franchise Permit Work Class:08/02/2022Expiration Date:Major Utility Job Number: N.859544Franchise Type:Telephone Description: Century Link/Lumen to access MH359, MH1146, dig 2 bore pits, and bore 300'. Pothole all existing utilities. Restoration per City of Renton standards. Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date QWEST corp d/b/a CenturyLink QC Austin Sweeney 253 766 7549 Austin.sweeney@centurylink.com Northsky Communications 425 615 7121 NORTHSC857Q4 BL.028638 N.859544 3300 Maple Valley Hwy CenturyLink/Lumen to access MH359, MH1146, dig 2 (4’x4’) bore pits, and bore approx. 300’. X X X X X 300 6/15/2021Austin Sweeney MFP21003254 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR 8/2/2021 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering N.859544 3000 Maple Valley Hwy Monday Friday 8:00am 3:00pm CenturyLink/Lumen to access MH359, MH1146, dig 2 (4’x4’) bore pits, and bore approx. 3 Northsky Communications LLC.426 615 7121 Austin Sweeney Austin.sweeney@centuryLink.com 23315 66th Ave S Kent 98032 MFP21003254 Scott Warlick CED Additional traffic control approval from WSDOT may be needed for work in their ROW 8/2/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Austin Sweeney Austin Sweeney 6/15/2021 N TRAFFIC CONTROL PLAN JOB # N. 859544. C. 45 PERMIT # MAPLE VALLEY HWY @ MAPLEWOOD PL SE ACCESS MH-359 & MH-1146 / BORE / RESTORE RIGHT-LANE CLOSURE SHEET 1 OF 1 Jeffrey Hubbard Designed For: LUMEN Project # N. 859544. C. 45 Jeffrey D. Hubbard Traffic Control Supervisor WA TCS # 011989 Draw Date: 6/9/2021 Phone 253-737-5198 jhubbard.tcp@gmail.com _______________________ Date:6/9/2021 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:N. 859544. C. 45CERT:WA TCS # 011989 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WA Comments: General Requirements 1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements. 2. Channelizing devices are 28" traffic cones with retro reflective material. 3. All signs are 36" x 36" B/O unless otherwise specified. 4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be determined by City of RENTON. Comments: ACCESS MH-359 & MH-1146, BORE, RESTORE. RIGHT-LANE CLOSURE NORTHWEST-BOUND MAPLE VALLEY HWY. ARROW BOARD USED. MAINTAIN 11' MINIMUM LANE WIDTHS. DRIVEWAYS REMAIN OPEN/ACCESSIBLE. SIDEWALKS REMAIN OPEN/ACCESSIBLE. SPOTTERS WILL ASSIST AT WORK AREA. SPEEDLIMIT 25 TRAFFIC FLOW 11 11 11 11 11ONLYONLYDRIVEWAY22 22 PLACE IN ADVANCE OF WORK ZONE350' +-350' +-ROADWORKAHEADW20-1RIGHT LANECLOSEDAHEADW20-5W4-2350' +-350' +-ROADWORKAHEADW20-1100' +-ROADWORKAHEADW20-1MAPLEWOODAVE SEMAPLE VALLEY HWY MAPLE VALLEY HWY SPEED LIMIT 40 SPEED LIMIT 40 BP BP WORK ZONE 11' X ~750' (TOTAL) MERGING TAPER ~295'ARROWBOARDMH-395 MH-1146 BORE ~300' TRAFFIC FLOW TRAFFIC FLOW TRAFFIC FLOW TRAFFIC FLOW TRAFFIC FLOW TRAFFIC FLOW TRAFFIC FLOW SPOTTERS SPOTTERSMHMH 11' MIN 11' MIN Comments: CHANNELIZATION SPACING MPH TAPER TANGENT25 / 30 20' 40'35 / 45 30' 60' ONE-LANE TWO-WAY TAPER 50' TO 100' NOT TO SCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTHL MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 165 1/2 L 30 150 165 180 35 205 225 245SHOULDER 40 270 295 320TAPER 45 450 495 5401/3 L 50 500 550 600 UNLAWFUL FOR ANYONE (OTHER THAN CITY OF RENTON) TO ALTERTHIS CERTIFIED PLAN WITHOUT EXPRESS WRITTEN CONSENT FROM:JEFFREY D. HUBBARD, TCS# 011989, JHUBBARD.TCP@GMAIL.COM Comments: SIGN SPACINGMPH "X"20-25 100'30 200'35-40 350'45+ 500' SIDEWALK SIDEWALK SIDEWALK SIDEWALK LEGENDARROW BOARD BP BORE PIT CONES MH MANHOLE S SPOTTER WORK AREA WORK TRUCK www.invarion.com MFP21003254Additional traffic control approval from WSDOT may be needed for work in their ROW JOB: BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:”TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.4003000001600%7561/'40#/'#..+#0%'$7+.&+0)5'48+%'5..%.%10$100+''5-'.5102*10'ÄÄEMAIL bonnie"CNNKCPEGDWKNFKPIUGTXKEGUPGV241,'%6+&™™5#4/1414&54&545%12'1(914-21("/#0*1.'$14' 2.#%'0'9%1706(+$'49+6*.4'Ä61/#0*1.'.'#8'(+$'4.112+0/#0*1.'Ä"/#0*1.'2.#%'0'9%1706(+$'4+0':+56+0)%10&7+661%7561/'4ž5$7+.&+0)/212"%7561/'4ž5/2122.#%'0'9'37+2/'06+0%7561/'4/2126'4/+0#6'.4'Ä+0(&241& 2411(4'37+4'&(14$16*70&'4)4170&2#6*5$'(14'9'&'%+&'+(#$14'+50''&'&#5NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTNVICINITY MAPSH OF /6.6&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 04/21/2123N5E16N.859544W26226RNTNWA013300 MAPLE VALLEY HIGHWAYRENTON, WA 9805813FIBER ENGINEER: TONNA BARUSOPHONE NO: (253) 372-5360EMAIL: tonna.baruso@NWOGP.comMFP21003254This permit is for Major construction work in the ROW and will be billed at an additional$60/HR for inspections. After hours and weekend work will be billed at $125/HRAdditional traffic control approval fromWSDOT may be needed for work in their ROW TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONHT-CL-YRPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSJOB:RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTSH OF /6.6&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 04/21/2123N5E16N.859544W26226RNTNWA013300 MAPLE VALLEY HIGHWAYRENTON, WA 9805823FIBER ENGINEER: TONNA BARUSOPHONE NO: (253) 372-5360EMAIL: tonna.baruso@NWOGP.comMFP21003254 JOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSGEO CODE:WC CLLI:RNGE:SECT:NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTTOWN:016'(1470&'4)4170&#%6+8+6;6'56#0&8'06+.#6'/#0*1.'76+.+6;8#7.624+1461'064;2.#%'9#40+0)&'8+%'5#0&914-#4'#2416'%6+10#54'37+4'&#0&75'';'#0&*'#&5#('6;2416'%6+102'4('&'4#.56#6'#0&.1%#.4')7.#6+105/6.6&'0)+0''44+%-('4&+0#0&12*10'01  Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 04/21/2123N5E16N.859544W26226RNTNWA013300 MAPLE VALLEY HIGHWAYRENTON, WA 9805833 EOP EOP EO P EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W C/L C/L R/W R/W R/W R/W R/ W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP EOP EOP EOP EOP T016'"%7561/'4ž5/2122.#%'0'9'37+2/'06+0%7561/'4/2126'4/+0#6'.4'Ä+0(&2016'"/#0*1.'2.#%'ž1(0'9%1706(+$'4+0':+56+0)%10&7+661%7561/'4ž5$7+.&+0)/2124'/18' 4'5614'#52*#.66114+)+0#.%10&+6+10016'21("/#0*1.'$14' 2.#%'ž1(0'9%1706(+$'49+6*.4'Ä+00'9%10&7+661/#0*1.'.'#8'(+$'4.112+0/#0*1.'Ä41& 2411(4'37+4'&(14$16*70&'4)4170&2#6*5$'(14'9'&'%+&'+(#$14'+50''&'&#52.#06'4)4#&'51(6#52*#.6 %10%4'6'574(#%'36"MIN$14'&'6#+.ž#ž$14'2.#%'/'061(%10&7+6Ä/+00656"MIN.%10&7+6 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W /#2.'8#..';*9;ž5+&'9#.- . / 0  / *      ž: ž  $ 1 4 '  2 + 6  SPEEDLIMITT   ž :  ž  $ 1 4 '  2 + 6   21 (  . / 0  / *     /212ž5+&'9#.-/#2 . ' 9 1 1 &  2 .  5 ' 5+&' 9 # . -5'VJ564''65+&'9#.-SPEEDLIMIT9'/#2.'8#..';*9;2#4%'./#2.'8#..';*9;2#4%'./#2.'8#..';*9;2#4%'.70'12'5'37'10'11'11'11'11'21'30'37'20'20'FIBER ENGINEER: TONNA BARUSOPHONE NO: (253) 372-5360EMAIL: tonna.baruso@NWOGP.comMFP21003254POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDSAdditional traffic control approval fromWSDOT may be needed for work in their ROW