Loading...
HomeMy WebLinkAboutMFP21002975.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21002975 IVR Number: 21002975 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:06/25/2021Application Date:1463400045Parcel Number: 13609 156TH AVE SE Permit Type:08/02/2021Issue Date:Franchise Permit Work Class:08/02/2022Expiration Date:Major Utility Job Number: 105088365Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO INSTALL SINGLE PHASE SECONDARY U/G LINE EXTENSION 6 S/F LOTS. REMOVE P01, P02, RELOCATE P03, INSTALL NEW P1A, P2A, P3A, DEADEND P04, UPGRADE P05, SET H1A AND H2A PEDESTALS, RUN SECONDARY FROM P1A/P2A TO LOTS 1 6. TRUCK TO BE SET AT ALL POLES, H1A AND H2A RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CEDAR RIDGE, LLC 24419 105TH PL SE KENT , WA 98030 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 105088365 13609 156th Ave SE Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 JESSICA CALLAHAN JESSICA.KIMBALL@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21002975 Scott Warlick CED MFP21002975 8/2/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG MFP21002975 15151010154TH AVE SE SHADOW PLACE SE1111 P06P05SE 2ND PLSTOPFLAGGER STOPFLAGGER STOPFLAGGER STOPFLAGGER W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com1 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658MFP21002975 151515 15SE 2ND PL1010154TH AVE SE SHADOW PLACE SE1111 P01P1AP05SE 2ND PLSTOP FLAGGER W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'STOPFLAGGER W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'STOPFLAGGER W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'TRUCK TO BE STAGED OFFSITE OR IN WORK ZONEPRIOR TO LINE DROPFLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com2 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002975 1515 12 1310111212 1212156TH AVE SESE 2ND PL101011154TH AVE SEP01 P021212SE 2ND PL156TH AVE SE SE 2ND PLSTOPFLAGGER W20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROADAHEAD100'100'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'STOPFLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'PLACE SIGNS ALONG WORK AREAFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com3 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002975 1515 12 1310111212 1212156TH AVE SESE 2ND PL11P2AP02P041212SE 2ND PL156TH AVE SE STOP FLAGGER STOP FLAGGER STOP FLAGGER W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'STOPFLAGGERTRUCK TO BE STAGED OFFSITE OR IN WORK ZONEPRIOR TO LINE DROPFLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.PLACE SIGNS ALONG WORK AREAFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK CENTER LANECLOSEDAHEADW9-3 W20-7A 100'100'100'ROADWORKAHEADW20-1 CENTER LANECLOSEDAHEADW9-3W20-7A100'100'100'ROADWORKAHEADW20-112 12Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com4 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002975 15151213101112 12 12 12 156TH AVE SESE 2ND PL 11 P03 P3A 1212 SE 2ND PL maintain (2) 11' lanesLEFTKEEPR4-8BCONETOPPERRIGHT LANECLOSEDAHEADW20-5RW1-4LROADWORKAHEADW20-1100'100'100'LEFT LANE CLOSED AHEAD W20-5LROAD WORK AHEAD W20-1100'100'ROADWORKAHEADW20-1ROADWORKAHEADW20-1 PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKRESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 06/18/2021 105088365 0 13609 156TH AVE SE, RENTON John Crofoot 425-424-6658 John.Crofoot@PSE.com 5 OF 5 Puget Sound Energy Traffic Control Supervisor: John Crofoot Card No. 012613 Card Exp. 10/31/24 John.Crofoot@pse.com (425)424-6658 MFP21002975 #2ACSRABC #2ACSR 13527 #2ACSR ABC336.4ACSR336.4TW#6CU #2ACSR 6304 TO BE RELOCATED TO BE RELOCATED C13615 13616 ST LT DEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM HANDHOLE TO STREET LIGHT METER LOCATION 60' "A""B"#4ACSRAABCSHADOW PL SE12°' 13°' 1" = 50' N Vicinity Map 47.480922, -122.133178 Owner / Developer Contact Info officeATTN: CEDAR RIDGE LLC 15445 53RD AVE S SUITE 120 TUKWILA, WA 98188 LOU LARSEN 206.431.7970 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 505745603 105088365 N/A 101139173 N/A 108109917 N/A 583066882 N/A 594143713 N/A 593235135 505745629 106338182 N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Relocation Removal OH XFMR's Modification OH Wire Distribution Service Stubs HP Svc/MSA 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4" BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE. ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY CABLES PER THE CIRCUIT ONE-LINE DIAGRAM. UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER PUGET SOUND ENERGY STANDARDS. AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE & CONDUIT TABLE. AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3) MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE. (EXCAVATION: 3' SQ.) AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE. AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT. AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE STREET LIGHT STANDARDS. ) INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES AND DATES. POWER GENERAL NOTES - PLAT PROJECTSITE SPECIFIC NOTES 105088365 106338182 SCHED.SQ. FT. MAX LRC = CIRCUIT FEET ADDED: 685' 27 4000 140 AMPS DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 5/5/21 J.SINGLETON 425-417-1149 12/3/18 J.SINGLETON 425-417-1149 12/3/18 E. PASAYE .4/19/18 REDT # ( RW-108935 )RENTON CEDAR RIDGE 1Ø SECONDARY U/G LINE EXTENSION - 6 S/F LOTS 13609 156TH AVE SE, RENTON, WA 98059 PUGET SOUND ENERGY N/A IP 088-60 106338182 105088365 1" = 50' 1 OF 2 KING 30 CIKNC QCSOKE 14SW-T23N-R05E 208.086 209.088 2305E055 2306E076 2305E055 MAP-13 COMCAST JAMES COHN 253-569-0636 CENTURYLINK KENNETH LUU 206.346.0144 RIGHT OF WAY CHAD WALIMAKI 425-462-3292 . . . 11. E-Mail: Cell Phone: Project Manager Contact Information: Manager:JESSICA CALLAHAN 206.503.1520 JESSICA.KIMBALL@PSE.COM SITE PLAN x xx x CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-13 6.6.18 162 165 204 0 5 0 162 170 204 RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID # HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 317824 167871 40'UNK 1970 CenturyLink/Comcast P02 317823 167888 40'UNK 1991 CenturyLink/Comcast P03 317806 167906 40'UNK 1959 CenturyLink/ Comcast/ Wave/ MCI Metro Access Trans. Serv. Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE ... ... ... LLARSEN@PACENG.COM POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P1A 317828-167868 45 3 2020 PSE Equip # P2A 317827-167888 45 3 2020 PSE Equip # P3A 317808-167907 45 1 2020 PSE Equip # Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P1A 317828-167868 50kVA 6211350 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 317824-167871 10kVA Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P2A 317827-167888 50kVA 6211350 Installed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER INSTALLATION Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: P3A 317808-167907 15kVA 6211200 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 317823-167888 37.5kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P03 317806-167906 15kVA CIRCUIT FEET REMOVED: 680' CROSSINGS CONDUIT TABLE GAS POWER Length X-ING Location Size Type Qty Location Size Type Qty NO. from to (in) sched each N-S-E-W (in) sched each (ft) X01 "A" LOT 1 3 SCH80 1 65 SECONDARY ONLY X02 "B" LOT 4 3 SCH80 1 65 SECONDARY ONLY 130 3" SCHEDULE 80 GREY PVC (ft) 4 = Total 3" PVC Plug Caps Remarks (type of crossing) (Primary, Feeder, Secondary, St. Light, Gas only, etc.,) NO GAS NO GAS WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFrom To P04 P02 #2ASCR 3Ø PRI/NTRL P02 P01 #2ASCR 3Ø PRI/NTRL P01 P05 #2ASCR 3Ø PRI/NTRL P05 P06 #2ASCR 3Ø PRI/NTRL Total Feet (Wire Size & Type) Removed WIRE STRINGING PRIMARY & SECONDARY Location Pri Sec Wire Size & Type Quantity Length (per conductor)TotalFrom To P04 P2A 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 185' 740' P2A P1A 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 200' 800' P1A P05 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 215' 860' CUSTOMER IS RESPONSIBLE FOR ANY TREE TRIMMING THAT WILL BE NEEDED TO INSTALL NEW PROPOSED OVERHEAD WIRE AND POLES. CUSTOMER NOTE P05 P06 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 85' 340' P01 -Existing Distribution Pole (317824-167871) Remove Pole and all PSE-Related Equipment Top Pole to Communications -Pole Stub to be Removed at a later date P03 -Existing Distribution Pole (317806-167906) To Be Relocated Approx. 6' West Out Of Proposed Curb Line Transfer all Overhead Wires To P3A -Pole Stub to be Removed at a later date Transfer OH Tpx. Secondary to P3A P3A - Proposed Distribution Pole (317808-167907) Install New Class 1 - 45' Pole (PD451) 6010.1000 Frame For 3Ø Single Wingarm (TAsw313) 6033.4012 P02 -Existing Distribution Pole (317823-167888) Remove Pole and all PSE-Related Equipment Top Pole to Communications -Pole Stub to be Removed at a later date Transfer 3-Ph. 336.4ACSR Pri. & Neut. Conductors from P03 Transfer 15kVA OH Transformer from P03 Remove OH 15kVA Xfmr - Tap BØ Transfer St.Light and SL Tag (SLAF7519) from P03 Transfer OH Tpx. Secondary From P03 P1A - Proposed Distribution Pole (317828-167868) Install 45ft. CL-3 Pole w/Grounds as staked (PD453) - 6010.1000 Install 3-Ph. Double Pin #2ACSR (ANG312) - 6033.1020 -Common Neutral Install 10" Single-Helix Anchor, L=10ft. North (ANDH1) - 6012.1000 Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100 Install 3" Secondary Riser (RIS3CSS) - 6042.1000 -Plumb to Handhole at H1A (see Sec. Cable & Conduit Table) Install 50kVA XFMR (TRFRXF) - 6025.1000 - TAP BØ P2A Proposed Distribution Pole (317827-167888) Install 45ft. CL-3 Pole w/Grounds as staked (PD453) - 6010.1000 Install 3-Ph. Tangent Pole Top Pin #2ACSR (TAN312) - 6033.1010 -Common Neutral Install 2 - 3" Secondary Riser (RIS3CSS) - 6042.1000 -Plumb to Handhole at H2A (see Sec. Cable & Conduit Table) Install 50kVA XFMR (TRFRXF) - 6025.1000 - TAP BØ P04 -Existing Distribution Pole (317828-167907) Existing Arm To Remain Replace Existing wire as Noted on Tables Below P06 -Existing Distribution Pole (317825-167845) P05 -Existing Distribution Pole (317824-167847) Upgrade Existing 3-Ph. Single Wingarm to an 3-Ph Double wingarm (TADW312) 6033.4020 Existing 3 Ph Deadend #2 ACSR To Remain Replace Existing wire as Noted on Tables Below 185' 180' 230' 85' 4 4 4 4 Cutouts & Fuses to Remain Install New Switch #X81566 -Intercept Existing 350 DB Secondary Cable @ IP1 with ±40' 350 Secondary Cable Install 3 Ph Deadend #2 ACSR (West) Remove 10kVA 120/240V OH TRF& Return to PSE Yard Remove 37.5kVA 120/240V OH TRF& Return to PSE Yard Install 15kVA OH XFMR (TRFLXF) 6025.1000 - TAP BØ Top Pole to Communications CITY OF RENTON SCHEDULE 80 PVC REQUIRED IN ALL DRIVABLE SURFACES AND RISERS 6.15.21 425-429-4104 6/12/21 MFP21002975 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR RESTORATION PER CITY OF RENTON STANDARDS SHADOW PL SESHADOW PL SEST LTDEVELOPER RESPONSIBLE FOR CONDUIT/WIRE FROM HANHOLE TO STREET LIGHT METER LOCATION "A" "B" DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CALLAHAN 206.503.1520 5/5/21 J.SINGLETON 425-417-1149 12/3/18 J.SINGLETON 425-417-1149 12/3/18 E. PASAYE .4/19/18 REDT # ( RW-108935 )RENTON CEDAR RIDGE 1Ø SECONDARY U/G LINE EXTENSION - 6 S/F LOTS 13609 156TH AVE SE, RENTON, WA 98059 PUGET SOUND ENERGY N/A IP 088-60 106338182 105088365 AS SHOWN 2 OF 2 KING 30 CIKNC QCSOKE 14SW-T23N-R05E 208.086 209.088 2305E055 2306E076 2305E055 MAP-13 COMCAST JAMES COHN 253-569-0636 CENTURYLINK KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . ... ... ... EX OVERHEAD CIRCUIT MAP 2306E076 SCALE: 6" = 1 MILE EX UNDERGROUND CIRCUIT MAP 2305E055 SCALE: 1" = 100' SITE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE NOT TO SCALE NEW CONDUIT DIAGRAM SECONDARY 2" SECONDARY 3" PRIMARY 2" CONDUIT LEGEND CUST. WIRE SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed CONDUIT VOLTAGE VOLTAGE ASBUILT INFORMATION SIZE LENGTH Lot Corner SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O, 350) Design (ft)to Meter (ft)(in) Design (ft)90° 45° 22° 11°(Percent) (Percent) Actual Amount Installed (Conduit & Cable) P1A H1A 4/O x 2 290 3 110 2 1.4 2.3 SEE V-DROPS **V01 = P1A** H1A LOT 1 1/O 45 2 1.8 3.3 SEE V-DROPS H1A LOT 2 1/O 45 2 1.8 3.3 SEE V-DROPS H1A LOT 3 4/O 75 45 2 75 2 2.0 3.7 SEE V-DROPS P2A H2A 310 3 120 2 1.7 2.4 SEE V-DROPS **V02 = P2A** H2A LOT 4 4/O 75 45 2 2 2.2 3.8 SEE V-DROPS H2A LOT 5 1/O 45 2 2.0 3.3 SEE V-DROPS H2A LOT 6 4/O 80 45 3 80 2 2.2 3.8 SEE V-DROPS 2" PVC & Bends = 75 4 0.24/O UG Triplex (ft) = 830 3" PVC & Bends = 310 6 1.1 Total Qts of Glue =1.4 SECONDARY HH/PEDESTAL TABLE Site Pedestal Number of Remarks or Positions (Include phasing information) Handhole Required H1A Pedestal 5 SEPL6 6050.1000 (BØ) H2A Pedestal 6 SEPL6 6050.1000 (BØ) 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 3'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 3' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE @ H1A, H2A SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18"16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE TYPICAL NOTCH-OUT FOR TRANSFORMER, NOT TO SCALE & SECONDARY PEDESTAL/HANDHOLE BACK OF EASEMENT STANDARD EASEMENT LINE ROW 10' PL 1' 4' - 5' Min. 1' 7'7' TRANSFORMER (WHEN PRESENT) JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 4/O x 2 6.15.21 425-429-4104 6/12/21 MFP21002975