HomeMy WebLinkAboutMFP21002975.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP21002975
IVR Number: 21002975
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:06/25/2021Application Date:1463400045Parcel Number: 13609 156TH AVE SE
Permit Type:08/02/2021Issue Date:Franchise
Permit Work Class:08/02/2022Expiration Date:Major Utility
Job Number: 105088365Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO INSTALL SINGLE PHASE SECONDARY U/G LINE EXTENSION 6 S/F
LOTS. REMOVE P01, P02, RELOCATE P03, INSTALL NEW P1A, P2A, P3A, DEADEND P04, UPGRADE P05, SET H1A
AND H2A PEDESTALS, RUN SECONDARY FROM P1A/P2A TO LOTS 1 6. TRUCK TO BE SET AT ALL POLES, H1A
AND H2A
RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CEDAR RIDGE, LLC 24419 105TH PL SE
KENT , WA 98030
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
105088365
13609 156th Ave SE
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
JESSICA CALLAHAN JESSICA.KIMBALL@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21002975
Scott Warlick CED
MFP21002975
8/2/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
MFP21002975
15151010154TH AVE SE
SHADOW PLACE SE1111
P06P05SE 2ND PLSTOPFLAGGER
STOPFLAGGER
STOPFLAGGER
STOPFLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com1 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658MFP21002975
151515 15SE 2ND PL1010154TH AVE SE
SHADOW PLACE SE1111
P01P1AP05SE 2ND PLSTOP
FLAGGER
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'STOPFLAGGER
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'STOPFLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'TRUCK TO BE STAGED OFFSITE OR IN WORK ZONEPRIOR TO LINE DROPFLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com2 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002975
1515
12 1310111212 1212156TH AVE SESE 2ND PL101011154TH AVE SEP01
P021212SE 2ND PL156TH AVE SE SE 2ND PLSTOPFLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANE
ROADAHEAD100'100'ROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'STOPFLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'PLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com3 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002975
1515
12 1310111212 1212156TH AVE SESE 2ND PL11P2AP02P041212SE 2ND PL156TH AVE SE
STOP
FLAGGER STOP
FLAGGER
STOP
FLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'STOPFLAGGERTRUCK TO BE STAGED OFFSITE OR IN WORK ZONEPRIOR TO LINE DROPFLAGGERS SHALL STOP TRAFFICIN ALL DIRECTIONS (SHORT DURATION:APPROX 10 MINUTES) FOR LINE DROP.PLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK
CENTER LANECLOSEDAHEADW9-3
W20-7A 100'100'100'ROADWORKAHEADW20-1 CENTER LANECLOSEDAHEADW9-3W20-7A100'100'100'ROADWORKAHEADW20-112 12Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 105088365013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com4 OF 5Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21002975
15151213101112 12
12 12 156TH AVE SESE 2ND PL
11
P03
P3A
1212
SE 2ND PL
maintain (2) 11' lanesLEFTKEEPR4-8BCONETOPPERRIGHT LANECLOSEDAHEADW20-5RW1-4LROADWORKAHEADW20-1100'100'100'LEFT LANE
CLOSED
AHEAD W20-5LROAD
WORK
AHEAD W20-1100'100'ROADWORKAHEADW20-1ROADWORKAHEADW20-1
PLACE SIGNS ALONG
WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKRESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSURE
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
06/18/2021
105088365
0
13609 156TH AVE SE, RENTON
John Crofoot
425-424-6658
John.Crofoot@PSE.com
5 OF 5
Puget Sound Energy
Traffic Control Supervisor:
John Crofoot
Card No. 012613
Card Exp. 10/31/24
John.Crofoot@pse.com
(425)424-6658
MFP21002975
#2ACSRABC #2ACSR
13527
#2ACSR
ABC336.4ACSR336.4TW#6CU
#2ACSR
6304
TO BE RELOCATED TO BE RELOCATED
C13615
13616
ST LT
DEVELOPER RESPONSIBLE FOR
CONDUIT/WIRE FROM HANDHOLE TO
STREET LIGHT METER LOCATION
60'
"A""B"#4ACSRAABCSHADOW PL SE12°'
13°'
1" = 50'
N
Vicinity Map
47.480922, -122.133178
Owner / Developer Contact Info
officeATTN:
CEDAR RIDGE LLC
15445 53RD AVE S SUITE 120
TUKWILA, WA 98188
LOU LARSEN 206.431.7970
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
505745603 105088365
N/A 101139173
N/A 108109917
N/A 583066882
N/A 594143713
N/A 593235135
505745629 106338182
N/A N/A
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Relocation
Removal
OH XFMR's
Modification
OH Wire
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1. THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECTSITE SPECIFIC NOTES
105088365 106338182
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 685'
27 4000
140 AMPS
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 5/5/21
J.SINGLETON 425-417-1149 12/3/18
J.SINGLETON 425-417-1149 12/3/18
E. PASAYE .4/19/18
REDT # ( RW-108935 )RENTON
CEDAR RIDGE
1Ø SECONDARY U/G LINE EXTENSION - 6 S/F LOTS
13609 156TH AVE SE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
106338182 105088365
1" = 50' 1 OF 2
KING 30 CIKNC QCSOKE
14SW-T23N-R05E 208.086 209.088
2305E055 2306E076 2305E055 MAP-13
COMCAST
JAMES COHN
253-569-0636
CENTURYLINK
KENNETH LUU
206.346.0144
RIGHT OF WAY
CHAD WALIMAKI
425-462-3292
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JESSICA CALLAHAN
206.503.1520
JESSICA.KIMBALL@PSE.COM
SITE PLAN
x
xx
x
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-13
6.6.18
162 165 204
0 5 0
162 170 204
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID # HEIGHT CLASS YEAR
XFMR CO.
ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P01 317824
167871 40'UNK 1970 CenturyLink/Comcast
P02 317823
167888 40'UNK 1991 CenturyLink/Comcast
P03 317806
167906 40'UNK 1959 CenturyLink/ Comcast/ Wave/ MCI Metro Access Trans. Serv.
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
...
...
...
LLARSEN@PACENG.COM
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P1A 317828-167868 45 3 2020 PSE Equip #
P2A 317827-167888 45 3 2020 PSE Equip #
P3A 317808-167907 45 1 2020 PSE Equip #
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P1A
317828-167868
50kVA
6211350
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317824-167871
10kVA
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P2A
317827-167888
50kVA
6211350
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P3A
317808-167907
15kVA
6211200
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P02
317823-167888
37.5kVA
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P03
317806-167906
15kVA
CIRCUIT FEET REMOVED: 680'
CROSSINGS CONDUIT TABLE
GAS POWER Length
X-ING Location Size Type Qty Location Size Type Qty
NO. from to (in) sched each N-S-E-W (in) sched each (ft)
X01 "A" LOT 1 3 SCH80 1 65 SECONDARY ONLY
X02 "B" LOT 4 3 SCH80 1 65 SECONDARY ONLY
130 3" SCHEDULE 80 GREY PVC (ft)
4 = Total 3" PVC Plug Caps
Remarks (type of crossing)
(Primary, Feeder, Secondary,
St. Light, Gas only, etc.,)
NO GAS
NO GAS
WIRE REMOVAL TABLE
Location
Wire Size & Type Quantity
Length
(per
conductor)RemarksFrom To
P04 P02
#2ASCR
3Ø PRI/NTRL
P02 P01
#2ASCR
3Ø PRI/NTRL
P01 P05
#2ASCR
3Ø PRI/NTRL
P05 P06
#2ASCR
3Ø PRI/NTRL
Total Feet (Wire Size & Type) Removed
WIRE STRINGING PRIMARY & SECONDARY
Location
Pri Sec Wire Size & Type Quantity
Length
(per
conductor)TotalFrom To
P04 P2A 3Ø
#2 ACSR (PRIMARY/NEUTRAL)4 185' 740'
P2A P1A 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 200' 800'
P1A P05 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 215' 860'
CUSTOMER IS RESPONSIBLE FOR ANY TREE
TRIMMING THAT WILL BE NEEDED TO INSTALL
NEW PROPOSED OVERHEAD WIRE AND POLES.
CUSTOMER NOTE
P05 P06 3Ø #2 ACSR (PRIMARY/NEUTRAL)4 85' 340'
P01 -Existing Distribution Pole (317824-167871)
Remove Pole and all PSE-Related Equipment
Top Pole to Communications
-Pole Stub to be Removed at a later date
P03 -Existing Distribution Pole (317806-167906)
To Be Relocated Approx. 6' West Out Of Proposed Curb Line
Transfer all Overhead Wires To P3A
-Pole Stub to be Removed at a later date
Transfer OH Tpx. Secondary to P3A
P3A
-
Proposed Distribution Pole (317808-167907)
Install New Class 1 - 45' Pole (PD451) 6010.1000
Frame For 3Ø Single Wingarm (TAsw313) 6033.4012
P02 -Existing Distribution Pole (317823-167888)
Remove Pole and all PSE-Related Equipment
Top Pole to Communications
-Pole Stub to be Removed at a later date
Transfer 3-Ph. 336.4ACSR Pri. & Neut. Conductors from P03
Transfer 15kVA OH Transformer from P03
Remove OH 15kVA Xfmr - Tap BØ
Transfer St.Light and SL Tag (SLAF7519) from P03
Transfer OH Tpx. Secondary From P03
P1A
-
Proposed Distribution Pole (317828-167868)
Install 45ft. CL-3 Pole w/Grounds as staked (PD453) - 6010.1000
Install 3-Ph. Double Pin #2ACSR (ANG312) - 6033.1020
-Common Neutral
Install 10" Single-Helix Anchor, L=10ft. North (ANDH1) - 6012.1000
Install 3/8" Primary & Neutral Down-Guys (GYD3SA / GYD3SAN) - 6013.0100
Install 3" Secondary Riser (RIS3CSS) - 6042.1000
-Plumb to Handhole at H1A (see Sec. Cable & Conduit Table)
Install 50kVA XFMR (TRFRXF) - 6025.1000 - TAP BØ
P2A Proposed Distribution Pole (317827-167888)
Install 45ft. CL-3 Pole w/Grounds as staked (PD453) - 6010.1000
Install 3-Ph. Tangent Pole Top Pin #2ACSR (TAN312) - 6033.1010
-Common Neutral
Install 2 - 3" Secondary Riser (RIS3CSS) - 6042.1000
-Plumb to Handhole at H2A (see Sec. Cable & Conduit Table)
Install 50kVA XFMR (TRFRXF) - 6025.1000 - TAP BØ
P04 -Existing Distribution Pole (317828-167907)
Existing Arm To Remain
Replace Existing wire as Noted on Tables Below
P06 -Existing Distribution Pole (317825-167845)
P05 -Existing Distribution Pole (317824-167847)
Upgrade Existing 3-Ph. Single Wingarm to an 3-Ph Double wingarm
(TADW312) 6033.4020
Existing 3 Ph Deadend #2 ACSR To Remain
Replace Existing wire as Noted on Tables Below
185'
180'
230'
85'
4
4
4
4
Cutouts & Fuses to Remain
Install New Switch #X81566
-Intercept Existing 350 DB Secondary Cable @ IP1 with ±40'
350 Secondary Cable
Install 3 Ph Deadend #2 ACSR (West)
Remove 10kVA 120/240V OH TRF& Return to PSE Yard
Remove 37.5kVA 120/240V OH TRF& Return to PSE Yard
Install 15kVA OH XFMR (TRFLXF) 6025.1000 - TAP BØ
Top Pole to Communications
CITY OF RENTON
SCHEDULE 80 PVC REQUIRED IN ALL DRIVABLE
SURFACES AND RISERS
6.15.21
425-429-4104 6/12/21
MFP21002975
This permit is for Major construction work in the ROW and will be billed at an additional
$60/HR for inspections. After hours and weekend work will be billed at $125/HR
RESTORATION PER CITY OF RENTON STANDARDS
SHADOW PL SESHADOW PL SEST LTDEVELOPER RESPONSIBLE FOR
CONDUIT/WIRE FROM HANHOLE TO
STREET LIGHT METER LOCATION
"A"
"B"
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CALLAHAN 206.503.1520 5/5/21
J.SINGLETON 425-417-1149 12/3/18
J.SINGLETON 425-417-1149 12/3/18
E. PASAYE .4/19/18
REDT # ( RW-108935 )RENTON
CEDAR RIDGE
1Ø SECONDARY U/G LINE EXTENSION - 6 S/F LOTS
13609 156TH AVE SE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
106338182 105088365
AS SHOWN 2 OF 2
KING 30 CIKNC QCSOKE
14SW-T23N-R05E 208.086 209.088
2305E055 2306E076 2305E055 MAP-13
COMCAST
JAMES COHN
253-569-0636
CENTURYLINK
KENNETH LUU
206.346.0144
RIGHT OF WAY
AMBER YANG
425.456.2774
.
.
.
...
...
...
EX OVERHEAD CIRCUIT MAP 2306E076
SCALE: 6" = 1 MILE
EX UNDERGROUND CIRCUIT MAP 2305E055
SCALE: 1" = 100'
SITE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE
NOT TO SCALE
NEW CONDUIT DIAGRAM
SECONDARY 2"
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND
CUST. WIRE
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed CONDUIT VOLTAGE VOLTAGE ASBUILT INFORMATION
SIZE LENGTH Lot Corner SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO
(1/O,4/O,
350)
Design
(ft)to Meter (ft)(in)
Design
(ft)90° 45° 22° 11°(Percent) (Percent)
Actual Amount Installed (Conduit &
Cable)
P1A H1A 4/O x 2 290 3 110 2 1.4 2.3 SEE V-DROPS **V01 = P1A**
H1A LOT 1 1/O 45 2 1.8 3.3 SEE V-DROPS
H1A LOT 2 1/O 45 2 1.8 3.3 SEE V-DROPS
H1A LOT 3 4/O 75 45 2 75 2 2.0 3.7 SEE V-DROPS
P2A H2A 310 3 120 2 1.7 2.4 SEE V-DROPS **V02 = P2A**
H2A LOT 4 4/O 75 45 2 2 2.2 3.8 SEE V-DROPS
H2A LOT 5 1/O 45 2 2.0 3.3 SEE V-DROPS
H2A LOT 6 4/O 80 45 3 80 2 2.2 3.8 SEE V-DROPS
2" PVC & Bends = 75 4 0.24/O UG Triplex (ft) = 830
3" PVC & Bends = 310 6 1.1
Total Qts of Glue =1.4
SECONDARY
HH/PEDESTAL TABLE
Site Pedestal Number of Remarks
or Positions (Include phasing information)
Handhole Required
H1A Pedestal 5 SEPL6 6050.1000 (BØ)
H2A Pedestal 6 SEPL6 6050.1000 (BØ)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
3'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
3'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
@ H1A, H2A
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
4/O x 2
6.15.21
425-429-4104 6/12/21
MFP21002975