HomeMy WebLinkAboutMFP21002992.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP21002992
IVR Number: 21002992
Permit Information
Permit Name: Puget Sound Energy Gas Permits
Address/Location:06/28/2021Application Date:1463400045Parcel Number: 13609 156TH AVE SE
Permit Type:08/02/2021Issue Date:Franchise
Permit Work Class:08/02/2022Expiration Date:Major Utility
Job Number: 106338182Franchise Type:Natural Gas
Description: PSE Gas CREW TO INSTALL 6 S/F PLAT STUBS. RESTORATION PER CITY OF RENTON STANDARDS
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Stuart Bennett
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
106338182
13609 156TH AVE SE
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
JESSICA KIMBALL JESSICA.KIMBALL@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21002992
Scott Warlick CED 8/2/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
1515
12 1310111212 1212156TH AVE SESE 2ND PL101011154TH AVE SE
15151212SE 2ND PL156TH AVE SE SE 2ND PLSTOP
FLAGGER
STOP
FLAGGER
W20-7AROAD
WORKAHEAD W20-1W20-4ONE LANEROADAHEAD100'100'100'CENTER LANECLOSEDAHEADW9-3
W20-7A 100'100'100'ROADWORKAHEADW20-1 CENTER LANECLOSEDAHEADW9-3W20-7A100'100'100'ROADWORKAHEADW20-1STOPFLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'PLACE SIGNS ALONG WORK AREAFROM TO
TOW AWAY AREA
PHONE 888-9999INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK TEMPORARY TRAFFIC CONTROL PLANWORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be along SE 2nd PL betweenToledo Ave SE and 156th Ave SE.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV06/18/2021 107055872013609 156TH AVE SE, RENTONJohn Crofoot425-424-6658John.Crofoot@PSE.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:John CrofootCard No. 012613Card Exp. 10/31/24John.Crofoot@pse.com(425)424-6658MFP21002992
86'E192'E303'W
19'W 31'N,16'W37'E,31'N
28'E
5/8" PE19905/8" PE19895/8" PE1989
2" PE IP 14'S8922432" STW IP 18'W
5641-1963 63042" STW IP 16'W
5641-1963
4" MPEI
28'E2" PE IP 14'S89224360'FLOWFLOW
Owner / Developer Contact InfoofficeATTN:CEDAR RIDGE LLC15445 53RD AVE S SUITE 120TUKWILA, WA 98188LOU LARSEN206.431.7970THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)GENERAL NOTES - GAS (JOINT TRENCH):1" = 50'105088365 106338182Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to twoworking days prior to construction. 1-800-424-5555Notify appropriate permitting agency prior to job start (see permit requirements).Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosionand Sediment Control and any additional local jurisdiction requirements.Any change in route, pipe size/type, tie-in method or additional main footage must be approved by theappropriate Engineer/Project Manager.Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities.Check box on report for wire box (Test Lead) installation.Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas OperatingStandard 2525.2500.To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown onthis design, unless approved by the appropriate Engineer/Project Manager.System MAOP denoted by System MAOP = 60 PSIGInstall Main Valves out of traffic where possible.Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed.Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE GasOperating Standards 2525.1200 and 2525.2300.If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ .Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE GasField Procedures Manual 0812 and 0813.Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400.Unless otherwise noted: All pipes installed in plat to be 2" MPE-7. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings.Customer to dig and backfill on private property or easement only. Trenches must conform to PSE GasOperating Standards 2525.1500, 2525.1600 and 2525.1700.Note all recordable footages, locations and material changes on the as-built in red.Upon completion of the project send the print copy, along with the completed work order, listing crew & actualmaterials used to the appropriate design group.On site pre-con required before start of job.At symbol:install natural gas main piping and fixtures. Size as indicated on tables andwork sketch (gas main is to parallel power system unless otherwise shown on work sketch).Inclement weather conditions may cause delays in construction times and dates.19.20.18.16.17.15.14.13.6.9.11.12.10.8.7.3.5.4.2.1.DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEELEC Order NumberSAP Sup Order NbrPC APPROVALJ. CALLAHAN206.503.1520 5/5/21J.SINGLETON425-417-1149 12/3/18E. PASAYE.4/19/18REDT # ( RW-108935 )RENTONCEDAR RIDGESCAT STUBS - EX. 2" PE MAIN - 6 S/F LOTS13609 156TH AVE SE, RENTON, WA 98059PUGET SOUND ENERGY1063381821050883651" = 50' 1 OF 1KING30CIKNC14SW-T23N-R05E208.086209.088COMCASTJAMES COHN253-569-0636CENTURYLINKKENNETH LUU206.346.0144RIGHT OF WAYAMBER YANG425.456.2774 ...N/AN/A N/A...21.Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: __________________Date ______________(CHECK BOX TO CONFIRM COMPLETION)505745629106338182N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AGASPROJECT PHASE Notification #Order #RetirementRelocateSAP SuperiorService StubsService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/Meter4680 06/11GAS MAIN INSTALLATION/RETIREMENTType/WorkManufacturerPipe SizeType Est Length Act LgthINSTALL 2" MPE-70 FTJOINT 2" MPE-70 FT.. .... .... .... ..Cell Phone:Project Manager Contact Information:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:JESSICA CALLAHAN206.503.1520JESSICA.KIMBALL@PSE.COMN/AN/ASITE PLANxx......... JOINT TRENCH DETAILNOTES:1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *2. Rocks greater than 10 inches diameter are not permitted in the final backfill.3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from theside of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.4. Utilities shall not be stacked over the gas line in the trench.5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.* Alternatives to full-width trench shading require PSE approval.Primary & Secondary-Mainline Gas & Communications (NTS)PrimaryDirt PileFinal Grade24" Min36"Min CoverOver Power48"MaxDepthFinal BackfillGas4" Sand BeddingProperty Lineintercept (depth varies).SidewalkCurbLocation of roof drain48" TypicalWidth may vary perNumber of Utilitiesand Conduits6" or 12" Min Sand ShadingOver Gas after Compaction12" MinR/W orExcavated12" TypicalPowerSecondaryPowerTV & TEL12" Min12" MinSeparation4,51,21366" or 12" Min Sand Shading Over Power after Compaction1LLARSEN@PACENG.COMNVicinity Map47.480922, -122.133178STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /GASSED UP PIPELINEPIPESEGMENTFOREMAN'SDATENAME60IP 088-60GEX 2" PE IP - 14' S C/L892243NOT TO SCALECROSS SECTION - S.E. 2nd PLACELOOKING WESTPIPE TABLE - SERVICESDescription of LocationPipesDesignAs-BuiltActivitiesfromto Size Type Length Location Length EFV Series LocationSS SINGLE2" MAIN1 1/8 MPE-7 40 ( ')WCL2,600SS SINGLE2" MAINLOT 31 1/8 MPE-7 402,600SS SINGLE2" MAINLOT 41 1/8 MPE-7 402,600SS SINGLE2" MAINLOT 51 1/8 MPE-7 402,600SS SINGLE2" MAIN1 1/8 MPE-7 402,600Total SS Single 66 Total 2,600 SeriesTotal 1-1/8" Pipe = 240Remarks( ')WCL( ')WCL( ')WCL( ')WCLINSTALL SS SINGLE SCAT STUB14'S C/L & 183'W C/L OF 156th AVE SE_____'S C/L & _____'W C/L OF 156th AVE SEINSTALL SS SINGLE SCAT STUB14'S C/L & 112'W C/L OF 156th AVE SE_____'S C/L & _____'W C/L OF 156th AVE SEINSTALL SS SINGLE SCAT STUB14'S C/L & 263'E C/L OF 154th AVE SE_____'S C/L & _____'E C/L OF 154th AVE SEINSTALL SS SINGLE SCAT STUB14'S C/L & 323'W C/L OF 156th AVE SE_____'S C/L & _____'W C/L OF 156th AVE SEINSTALL SS SINGLE SCAT STUB14'S C/L & 253'W C/L OF 156th AVE SE_____'S C/L & _____'W C/L OF 156th AVE SESS SINGLE2" MAINLOT 61 1/8 MPE-7 402,600( ')WCLLOT 2LOT 1CROSSINGS CONDUIT TABLEGAS POWERLengthX-INGLocationSize Type Qty Location Size Type QtyNO. from to (in) sched each N-S-E-W (in) sched each (ft)X01"A" LOT 13 SCH80 1 65SECONDARY ONLYX02"B" LOT 43 SCH80 1 65SECONDARY ONLY130 3" SCHEDULE 80 GREY PVC (ft) 4 = Total 3" PVC Plug CapsRemarks (type of crossing)(Primary, Feeder, Secondary, St. Light, Gas only, etc.,)NO GASNO GASINSTALL SS SINGLE SCAT STUB14'S C/L & 256'E C/L OF 154th AVE SE_____'S C/L & _____'E C/L OF 154th AVE SE6.15.21425-429-4104 6/15/21This permit is for Major construction work in the ROW and will be billed at an additional$60/HR for inspections. After hours and weekend work will be billed at $125/HRRESTORATION PER CITY OF RENTON STANDARDSMFP21002992storm drainage structure placed at curbline on west side of lot 3. locate gasservice to the east side of the lot tomaintain a minimum of separation betweenstorm structure and gas service.