HomeMy WebLinkAboutCO 09           CAG-20-126, CO #9-21 Approved by Cheryl Beyer via 7/14/2021 email Change Order No. 9 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 2 of 4 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Change to Contract Provisions: Add the following Special Provision: 8-02.3(13) Plant Establishment (******) This Section is supplemented with the following: All references to “first-year plant establishment” in this Section shall read “plant establishment.” The second paragraph of this Section is replaced with the following: The plant establishment period shall extend from notification of acceptance of initial planting through physical completion of the Project. Change to Contract Plans: As required by Field Work Directive No 15, the Contractor is directed to delete the irrigation system improvements on Logan Avenue, near the bridge. Plan Sheet I5.06 is deleted. The Contractor is directed to make the following substitutions of drought tolerant plantings and to furnish and install new plants, seeded lawn per WSDOT Standard Specification Section 8- 02.3(10) and add three slow release tree watering bags. Adjustments: BI45 PSIPE Compact Strawberry tree (5 gal.) -3EA BI46 PSIPE Nana (1 gal.) +74 EA BI47 PSIPE Mount Vernon’ (2 gal.) - 15 EA BI 48 PSIPE Pink knock Out Rose (2 gal.) -31EA BI 49 PSIPE Mellow yellow Spirea (5 gal) - 9 EA @ $39/EA BI51 PSIPE Angelina Stonecrop (1 gal.) - 30EA BI52 PSIPE Wall Germander (1 gal.) -4 EA BI53 Sod Installation -52 SY Seeded Lawn Installation 30 SY PSIPE Rosmarinus officinalis ‘Tuscan Blue' (1 GAL.) 17 EA PSIPE Arctostaphylos uva-ursi ‘Massachusetts’ (1 Gal.) 57 EA Slow Release Tree Watering Bag 3 EA Delete Irrigation System near Bridge 1 EA Reason for Change:        Change Order No. 9 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 3 of 4 Contract Provisions: The City’s Parks Department will take over the establishment of the plants within the right of way at physical completion. This change will allow the Contract to be closed out in a timely manner. Contract Plans: Field investigation of the existing irrigation system near the bridge confirmed that the existing system was not functioning and could not be connected to. There were no viable points of connection for the new irrigation system, therefor the City decided to switch the landscaping improvements to drought tolerant. Materials: Seeded Lawn per WSDOT Standard Specification Section 8-02.3(10) Slow Release Tree Watering Bags conforming to the requirements of note 8 on Plan Sheet L6.06 Revision 1. Plans: Sheet I5-06 Revision1, L6-06 Revision1 Estimated Change Order Cost: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2020 WSDOT/APWA Standard Specifications. The Work will be measured and paid under the respective unit prices. The attached Estimated Cost lists the unit bid items that are adjusted due to this change. The adjustments to the unit bid item quantities are estimates; the Contractor will be paid based on the actual quantities installed. See attached. Extension of Time: The Contractor agrees that the time for Completion is extended 0 Working Days for the additional work.        Change Order No. 9 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 4 of 4 Sections 1-04.4 and 1-04.5 of the 2020 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order ܈ Plans ܈Field Directive ܈Change Order Quotation ܈Estimated Change Order Cost ܆Project Labor List ܆Force Account Equipment Rate Request (DOT Form 422-010 EF) ܆Equitable Adjustment Determination        Bid Item No.Description Quantity Change Unit Unit Price Estimated Cost 45 PSIPE Arbutus unedo 'Compacta'/Compact Strawberry tree (5 gal.) -3 EA $38.00 -$114.00 46 PSIPE Berberis buxifolia ‘nana’ (1 gal.) 74 EA $16.00 $1,184.00 47 PSIPE Prunus laurocerasus ‘Mount Vernon’ (2 gal.) -15 EA $25.00 -$375.00 48 PSIPE Rosa x 'Radcon' / Pink knock Out Rose (2 gal.)-31 EA $27.00 -$837.00 49 PSIPE Spiraea thunbergii 'Ogon' / Mellow yellow Spirea (5 gal)-9 EA $39.00 -$351.00 51 PSIPE Sedum rupestre 'Angelina' / Angelina Stonecrop (1 gal.)-30 EA $16.00 -$480.00 52 PSIPE Teucrium chamaedrys / Wall Germander (1 gal.)-4 EA $15.00 -$60.00 53 Sod Installation -52 SY $16.00 -$832.00 CO9-1 Seeded Lawn Installation 30 SY $20.91 $627.30 CO9-2 PSIPE Rosmarinus officinalis ‘Tuscan Blue' (1 GAL.)17 EA $33.93 $576.81 CO9-3 PSIPE Arctostaphylos uva-ursi ‘Massachusetts’ (1 Gal.)57 EA $21.91 $1,248.87 CO9-4 Slow Release Tree Watering Bag 3 EA $119.48 $358.44 CO9-5 Delete Irrigation System near Bridge 1 LS -$2,273.00 -$2,273.00 -$1,326.58 -$1,326.58 By: Date: 7/2/2021 Estimated Change Order No 9 Cost Project Name: Lake Washington Loop Trail Contractor: Active Construction Inc. Federal Aid No: TAP-1070(008) Contract No: CAG 20-126 Construction Manager: Tani Stafford, PE Estimated Force Account Cost Total Estimated Change Order Cost Bid Item Change Estimated Bid Item Cost        $&7,9( &216758&7,21 ,1& $&, 352-(&7 $&,3+$6( &2'( -2% '$7(:25.3(5)250(' &2 +2856 #5$7( 727$/  #    (48,312 (48,30(17'(6&5,37,21 +2856 #5$7( 727$/  21+:<)/$7%('75.&9<  #    81,7 #5$7( 727$/ 81,7 #5$7( 727$/ 81,7 #5$7( 727$/  6<#               *5$1'727$/ 6<&267 6< 0$5.832168%&2175$&725&267! 9DULHV 68%727$/68%&2175$&725&267 0$5.8321(48,30(17 68%727$/(48,30(17 68%&2175$&72568%727$/ 0$5.8321/$%25 68%727$//$%25 68%&2175$&725 *UHHQ&LW\ 6(59,&(&2676 '(6&5,37,21 68%727$/(48,30(17 0$7(5,$/&2676 '(6&5,37,21 68%727$//$%25 (48,30(17'(6&5,37,215$7(6 /$%25&/$665$7(6 0$132:(5 :25.,1*)25(0$1 $&,$'',7,21$/:25.6800$5< /DNH:DVKLQJWRQ/RRS7UDLO '(6&5,37,212):25. &RVWHVWLPDWHWRSHUIRUPWKH6HHGHG/DZQ,QVWDOODWLRQSHU&2        $&7,9( &216758&7,21 ,1& $&, 352-(&7 $&,3+$6( &2'( -2% '$7(:25.3(5)250(' &2 +2856 #5$7( 727$/  #    (48,312 (48,30(17'(6&5,37,21 +2856 #5$7( 727$/  21+:<)/$7%('75.&9<  #    81,7 #5$7( 727$/ 81,7 #5$7( 727$/ 81,7 #5$7( 727$/  ($#               $&,$'',7,21$/:25.6800$5< /DNH:DVKLQJWRQ/RRS7UDLO '(6&5,37,212):25. /$%25&/$665$7(6 0$132:(5 :25.,1*)25(0$1 &RVW(VWLPDWHWRIXUQLVKDQGLQVWDOOWKHQRQ36,3(LWHP&2UHIHUHQFHGLQ&2IRUWKHQRQLUUJDWHGDUHD 68%727$//$%25 (48,30(17'(6&5,37,215$7(6 68%727$/(48,30(17 0$7(5,$/&2676 '(6&5,37,21 6(59,&(&2676 '(6&5,37,21 68%&2175$&725 *UHHQ&LW\ 68%&2175$&72568%727$/ 0$5.8321/$%25 68%727$//$%25 0$5.8321(48,30(17 68%727$/(48,30(17 *5$1'727$/ &2673(5($ ($  0$5.832168%&2175$&725&267! 9DULHV 68%727$/68%&2175$&725&267        $&7,9( &216758&7,21 ,1& $&, 352-(&7 $&,3+$6( &2'( -2% '$7(:25.3(5)250(' &2 +2856 #5$7( 727$/  #    (48,312 (48,30(17'(6&5,37,21 +2856 #5$7( 727$/  21+:<)/$7%('75.&9<  #    81,7 #5$7( 727$/ 81,7 #5$7( 727$/ 81,7 #5$7( 727$/  ($#               $&,$'',7,21$/:25.6800$5< /DNH:DVKLQJWRQ/RRS7UDLO '(6&5,37,212):25. /$%25&/$665$7(6 0$132:(5 :25.,1*)25(0$1 68%727$//$%25 (48,30(17'(6&5,37,215$7(6 68%727$/(48,30(17 0$7(5,$/&2676 '(6&5,37,21 6(59,&(&2676 '(6&5,37,21 68%&2175$&725 *UHHQ&LW\ 68%&2175$&72568%727$/ 0$5.8321/$%25 68%727$//$%25 *5$1'727$/ 3(5($&+&267  &RVW(VWLPDWHWRIXUQLVKDQGLQVWDOOWKHQRQ36,3(LWHP&2UHIHUHQFHGLQ&2IRUWKHQRQLUUJDWHGDUHD 0$5.832168%&2175$&725&267! 9DULHV 68%727$/68%&2175$&725&267 0$5.8321(48,30(17 68%727$/(48,30(17        $&7,9( &216758&7,21 ,1& $&, 352-(&7 $&,3+$6( &2'( -2% '$7(:25.3(5)250(' &2 +2856 #5$7( 727$/  #    (48,312 (48,30(17'(6&5,37,21 +2856 #5$7( 727$/  21+:<)/$7%('75.&9<  #    81,7 #5$7( 727$/ 81,7 #5$7( 727$/ 81,7 #5$7( 727$/  ($#               *5$1'727$/ 3(5($&+&RVW ($ 0$5.832168%&2175$&725&267! 9DULHV 68%727$/68%&2175$&725&267 0$5.8321(48,30(17 68%727$/(48,30(17 68%&2175$&72568%727$/ 0$5.8321/$%25 68%727$//$%25 68%&2175$&725 *UHHQ&LW\ 6(59,&(&2676 '(6&5,37,21 68%727$/(48,30(17 0$7(5,$/&2676 '(6&5,37,21 68%727$//$%25 (48,30(17'(6&5,37,215$7(6 /$%25&/$665$7(6 0$132:(5 :25.,1*)25(0$1 $&,$'',7,21$/:25.6800$5< /DNH:DVKLQJWRQ/RRS7UDLO '(6&5,37,212):25. &RVWHVWLPDWHWRIXUQLVKDQGLQVWDOOVORZUHOHDVHWUHHZDWHULQJEDJV\VWHPVSHU&2LWHP ($        $&7,9( &216758&7,21 ,1& $&, 352-(&7 $&,3+$6( &2'( -2% '$7(:25.3(5)250(' &2 +2856 #5$7( 727$/ (48,312 (48,30(17'(6&5,37,21 +2856 #5$7( 727$/ 81,7 #5$7( 727$/ 81,7 #5$7( 727$/ 81,7 #5$7( 727$/  /6#     *5$1'727$/ 68%727$/68%&2175$&725&267 68%&2175$&72568%727$/ 68%&2175$&725 *UHHQ&LW\ 6(59,&(&2676 '(6&5,37,21 0$7(5,$/&2676 '(6&5,37,21 (48,30(17'(6&5,37,215$7(6 /$%25&/$665$7(6 0$132:(5 $&,$'',7,21$/:25.6800$5< /DNH:DVKLQJWRQ/RRS7UDLO '(6&5,37,212):25. &UHGLWWRGHOHWHWKHLUULJDWLRQV\VWHPSHU&2&UHGLWEDVHGRQWRWDODUHDV         CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTIONOF11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.com        CITY OF RENTONBY:DATE:APPROVED FOR CONSTRUCTIONOF11241 Willows Road NE, Suite 200Redmond, WA 98052425.822.4446www.otak.com