HomeMy WebLinkAboutMFP21003734.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21003734 IVR Number: 21003734 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/04/2021Application Date:3342100176Parcel Number: 3216 LAKE WASHINGTON BLVD N Permit Type:08/12/2021Issue Date:Franchise Permit Work Class:08/12/2022Expiration Date:Minor Utility Job Number: 101134839Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO CHANGE OUT EXISTING GANG OP SWITCH WITH NEW RECLOSER. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL 3216 LAKE WASHINGTON LLC 3016 67TH AVE SE MERCER ISLAND , WA 98040 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101134839 3216 LAKE WASHINGTON BLVD Monday friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 MOHAMMAD MAHMOOD MOHAMMAD.MAHMOOD@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21003734 Scott Warlick CED 8/12/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG P01 10 10 1010 1313NE 32ND STLAKE WASHINGTONBLVD NW20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROAD AHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100' STOP FLAGGER STOP FLAGGER STOP FLAGGER PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999 INFRASOURCE LLC 0 00 0000000NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKRESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 07/20/2021 101134839 0 3501 Lake Washington Blvd N, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21003734 X0828 N Vicinity Map 101134839ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SCALE: 6" = 1 Mile OVERHEAD CIRCUIT MAP - Before No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" HAZ-15/HIG-17 repl NO w/recl Owner / Developer Contact Info officeATTN: N/A N/A N/A BILL FOSTER 425.456.2750PHONE CABLE TV 11657334 101134839 . PROJECT PHASE PWR NOTIF#ORDER# Superior OH Expense E-Mail: Cell Phone: Project Manager Contact Information: Manager:Joshua Fider 425.396.3772 joshua.fider@pse.com UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. FIDER 425.396.3772 6/17/21 M. MAHMOOD 253.259.1894 6/17/21 N/A N/A N/A S.FORNELIUS 253.395.6828 5/7/2021 N/A RENTON HAZ-15/HIG-17 repl NO w/recl REPLACE SWITCH with NEW RECLOSER 3501 Lake Washington Blvd N Renton 98056 DESIGNED BY PSE N/A N/A N/A 101134839 AS NOTED 1/2 KING N/A N/A QCSOKE SE 31-24-05,SW 32-24-05 N/A N/A 2405E124, E127 2405E124, E136 N/A HAZ-15, HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) LEGEND CONDUIT RISER OVERHEAD TRANSFORMER JUNCTION VAULT/JUNCTION BOX NEW CONDUCTOR AND OR TRENCH LINE DISCONNECT - FUSED PULL VAULT OR SPLICE VAULT EXISTING POLE DOWN GUY DISCONNECT - UNFUSED NEW POLE PADMOUNT TRANSFORMER SECONDARY HANDHOLE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED STREET LIGHT TOTAL UNDERGROUND TRANSFORMER ENERGY CUSTOMER DEMAND POINT OR OR OR OVERHEAD JUMPER CONNECTION JOB SITE OVERHEAD CONSTRUCTION Poles & Structures -Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements are from the face of the pole. -All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than specified. -Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification 6014.1000 at new gang operated switch locations. -Install grid numbers on all new and existing poles as shown on sketch. -Straighten existing poles as indicated or as necessary. -Treat all field-drilled poles with copper napthenate wood preservative. -Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill and crown pole holes and restore area similar to adjacent landscaping. Conductors & Equipment - Transfer all overhead and underground primary, secondary and service conductors and guys to new poles set, unless otherwise indicated on this sketch. - Transfer existing transformers to new poles unless otherwise indicated on this sketch. - Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites being worked within the scope of the project where they are currently missing. - Use 397 AAC and Ampact connectors for all bare conductor feeder jumpers and 600 amp switch jumpers. Install tree wire conductor for jumpers on all poles that are double deadended with tree wire. - Apply grit inhibitor on all Ampact, stirrup, and dead-end connections. - Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing. - All neutral connections to be made with solid compression connectors. Connect all pole grounds to common neutral. - Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused protection above 40T. - Install Wildlife Protectors on all transformers. PROPOSED FUSESAVER * SCALE: N.T.S OVERHEAD CIRCUIT MAP - After RECLOSER GENERAL SPECIFICATIONS Electric Project Scope Document Project Information: Project Name: 2405E124 HAZ-15/HIG-17 repl n.o. w/recl Reclosers Notification Number: 11657334 System Planner: Bill Foster (425) 456-2750 Required In-Service Date: 12/31/2021 Project Summary: At normal open SW# X0828, Grid # 319289-166030, Lake Wa Blvd N and N 32n St. Replace switch with new recloser/control/communication, normal open. Include power supply unit if secondary voltage not readily available. "Ensure all new installed reclosers, within this scope, are SCADA-enabled to provide System Operators visibility and remote control." Non-storm customer minute interruptions saved: Non-storm customer interruptions saved: Non-storm outages saved: Project Justification: In PSE's service territory, it is projected that 60% of the outages on overhead systems are temporary in nature, such as a limb falls through the primary line making contact along the way. Reclosers are devices that will provide an instantaneous operation and then after a period of time reclose. If the fault is temporary then downstream customers will see the brief drop and pick, but if permanent, the recloser will lock open and the customers upstream will be saved an outage. Construction Criteria: Install grid number boards on PSE poles where they're missing. Install new OH switch number boards if not present. Provide Planner with preliminary and final work sketches and notify Planner when the project is scheduled, then complete. Keep Planner notified of correspondence with ROW. Safety -Refer to PSE standards 6275.3000 and 6275.6000 for system ground requirements. -Refer to PSE standards 6275.9050 for personal protective grounding requirements. -Refer to PSE standards 6275.9150 for vehicle grounding and barricading requirements. -Proper line clearances shall be taken at the beginning, and released at the end, of each work day, or as otherwise instructed by the System Operator. -Provide signs, barricades, and traffic control in conformance with permit regulations. -Utilize flagging and other vehicle traffic control as necessary and in conformance with local traffic regulations. -Maintain traffic flow as required by permitting agency. Erosion & Sediment Control -Refer to PSE standards 0150.3200 for minimum requirements. -Comply with all requirements of permitting agency. -Installed erosion & sediment devices shall be maintained until vegetation has been re-established or disturbed soil has been otherwise permanently stabilized. Joint Facilities -Coordinate with Communication Companies for transfers. General -All work is to be completed per PSE Standards & Practices. Copies of all PSE Standards are available upon request. -Work sites shall be kept clear of debris and all construction materials; equipment and packing shall be removed daily. -Return all unused and removed poles, transformers and hardware to PSE, storeroom. All copper shall be coiled and returned the day it is removed from the poles. Remove all unused pins and insulators. -Return all streetlights, area lights and floodlights to Sumner yard. Preconstruction - Notify appropriate city, County or DOT authorities 48 to 72 hours, or as required by permitting agency, in advance of starting work in Right-of-way involving a Permit. - All system switching shall be approved by System Operations (425-882-4652) a minimum of 48 hours in advance. - Notify customers of all outages 48 hours in advance. Work Drawings & Documents - Field design changes shall be approved by PSE Project Manager or Engineer. - Mark all field changes, equipment ID numbers and Underground cable information in red on Foreman's copy of worksketch. - Return one Foreman's copy of worksketch to Project Manager at completion of job. - When permits are required, a copy shall be available on work site at all times. JOB SITE 425-457-9536 06/22/21 MFP21003734 HAZ15P01 R/WR/WEOPEOPBIKE LANEBIKE LANEHIG17GASGASGASGASR/WR/WEOPBIKE LANEBIKE LANESOFT EARTHASPHALTASPHALTSOFT EARTH60' 319289-166030 P01 14'6' 10'8'12'EOP℄10' 9' 20.5' 19'LAKE WASHINGTON BLVD. N.℄E.O.P.10' PSE POLE P01 R/WCL 9' SOFT EARTH ASPHALT 8' BIKE LANE 3' SOFT EARTHE.O.P.10'R/W14' SOFT EARTH ASPHALT 6' BIKE LANE 30'30' GAS WATER 19' LAKE WASHINGTON BLVD. N. 20.5' 60' ROW 101134839UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. FIDER 425.396.3772 6/17/21 6/17/21 253.259.1894 N/A N/A N/A S.FORNELIUS 253.395.6828 5/7/2021 N/A RENTON HAZ-15/HIG-17 repl NO w/recl REPLACE SWITCH with NEW RECLOSER 3501 Lake Washington Blvd N Renton 98056 DESIGNED BY PSE N/A N/A N/A 101134839 AS NOTED 2/2 KING N/A N/A QCSOKE SE 31-24-05,SW 32-24-05 N/A N/A 2405E124, E127 2405E124, E136 N/A HAZ-15, HIG-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Installed at site: Grid Number: Recloser Company ID#: Controller Company ID#: Recloser Material ID#: Controller Material ID#: Foreman to redline the following information RECLOSER CONTROLLER INSTALLATION P01 319289-166030 9946807 9999667 SITE SPECIFIC NOTES P01: 319289-166030 EXIST.1965 75' CL-1, POLE TO REMAIN REPLACE EXISTING D.E. INSTALL (6) NEW 12KV ARM-MOUNTED D.E. (DED001A) 6016.1000 LOWER NEUT. RIGID CLEVIS TO 10'7" FROM PRI ARM 2-22 REMOVE EXISTING GANG OPERATED SWITCH, SW#X828 2-24R x 2 INST. DBL BUCK ARM FOR SOURCE/LOAD DISC. (ARDS209) 6011.1010 INST. BYPASS SWITCHES ON EXISTING LINE ARMS INST. N.O. 12KV 600A RECLOSER W/ CPT (REC15VGWT) 6023.1021 2-24N x 2 INST. G&W VACCUM RECLOSER (MID 9946807) INST. SEL-651RA CONTROLLER (MID 9999667) INST. CONTROL CABLES (MID 9996186) INST. VOLTAGE SENSING CABLE (MID 9999670) TAP RECLOSER XFMR ON NORTH SIDE OF D.E. INST. RECLOSER ON SOUTH FACE OF POLE X X SCALE: 1"=50' PLAN VIEW SCALE: 1"=20' PARTIAL PLAN DETAIL SCALE: N.T.S. LAKE WASHINGTON BLVD. N. - CROSS SECTION (LOOKING SOUTH) 425-457-9536 06/22/21 MFP21003734