Loading...
HomeMy WebLinkAboutMFP21003969.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21003969 IVR Number: 21003969 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/17/2021Application Date:9202500160Parcel Number: 2813 NE 23RD PL Permit Type:09/13/2021Issue Date:Franchise Permit Work Class:09/13/2022Expiration Date:Minor Utility Job Number: 109138052Franchise Type:Natural Gas Description: Puget Sound Energy Electric CREW TO CUT AND CAP EXISTING GAS SERVICE AT MAIN. REPLACE GAS SERVICE AT MAIN. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 MURRAY MITCHELL D 2813 NE 23RD PL RENTON , WA 98056 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 109138052 2813 NE 23RD PL Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 Sara Hyacinthe Sara.Hyacinthe@pse.com 6905 S. 228TH ST KENT, WA 98032 MFP21003969 Scott Warlick CED 9/13/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 281316 16 16161616NE 23RD PLHARRINGTON PL NE RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREFROMTOTOW AWAY AREAPHONE 888 -9999 INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR KSHOULDERWORKW21-5ROADWORKAHEADW20-1100'100'ROADWORKAHEADW20-1 100'TEMPORARY TRAFFIC CONTROL PLANWORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 248' ECL of Harrington PL NE &42' SE Radius of NE 23rd PL.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV08/06/2021 1091380520 2813 NE 23RD PL, RENTON, WA, 98056.Jason Bisenius425-424-7316jason.bisenius@pse.com1 OF 4Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP21003969 Est. Start Date: & & & & MDPE - 2" IPS - (DIA) 1"CTS 9999549 Job #:109138052 Date:6/28/21 Address:2813 NE 23RD PL Puget Sound Energy Gas Pre-Inspect Form RUSH PM / Inspector:Sara Hyacinthe 206-637-3169 Est. Duration:1 Day (8 Hours) Jurisdiction:RENTON City / Zip:RENTON, 98056 ROW Permit:Yes Customer:MARK MITCHELL 425-235-6372 Work Location Size of Cut Surface Type Job Description / ROW Scope of Work New Construction: No Construction Method Scat ROW / Plat Property PLAT Map:204.084 N Project Scope: ENCROACHING IN 2817, RELOCATE 1-1/8" PE SVC TO 2813: C/C EXIST 1-1/8" PE SVC AT MN; AT APPROX 2' E OF C/C LOCATION, INST COMPLT 1-1/8" PE SVC (APPROX 2' SCAT STUB, 2600 EFV / APPROX 30' PLAT EXT, FIRST 1/3-1/2 OF RUN IN LOT) ~NOTE: LEAVE AS IS EXIST A630 MTR AND EXIST PORTION OF EXT THAT IS NOT ENCROACHING IN LOT 2817, REPLACE ONLY PE SVC FROM MN TO WHERE EXIST EXT CAN BE CAUGHT WITHIN LOT 2813, LEAVING EXISTING MTR AND THAT SIDE OF SVC AS IS Service Information Street Information Job Type Altered Residential Svc EFV:1-1/8" - 2600 - 9999144 Police #:TCP:Yes Diameter:1-1/8" PE Flaggers #:Arterial:No Tie-In Fitting Trolley Lines:No Mtr Hoods #: Meter:A630 Speed Limit: Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:6" W.C.Traffic Signal:No Bus Stop:No 20 No Parks #: Meter Loc:03 - OL of CL of CL East of CL HARRINGTON PL NE 42'SE RAD NE 23RD PL 4X6 KNT FLT - Kent of CL of CL CONCRETE of CL RAD 248' CL 2" MPE IP 43'R109090559-201685FT DIAMETER 1ST PART OF THE SVC TO 2813 IS ENCROACHING IN 2817'S LOT SO RELOCATE REQUESTED BY 2817 2813 WILL PROVIDE OPEN TRENCH BECAUSE LOT OF HIS OWN FACILITIES UNDERGROUND IN SVC PATHWAY WATER & SEWER OUTSIDE OF SVC PATH -SEE CITY OF RENTON MAP MFP21003969 RESTORATION PER CITY OF RENTON STANDARDS 320732253213253020232029261624282422244627092705261126152701271627102704262026142648272527162633210926082618261526142621262626202632263826022600260526022608260326072622262520112017202020182012202328072825282628202817281328142809280828052802272823032722271327162746241231223219320132313402252925412535251925132507252725053212250625142522252125153402608270026162624270827242732274027392733272927252717270927012645261326212629263726162625270127092633270127092617261727172801220926102200270227172216609203227022167210321102130290029082912290427142708203027152024212521362905203727202033212420222813281925232300262726332434244024502638263226282609NE 24TH ST2ND STRRINGTON PL NENE 21ST STNE 23RD PLHARRINGTON PL NENE 23RD STFERNDALE PL NE OOD AVE NE NE 24TH CTNE 25TM O N R O E JEFFERSON AVE NE 31'S165'N30'E162'N140'N,30'E14'N2" MPE IP 22'N 109090559-20162" MPE IP 22'W 109090559-20162" MPE IP 22'N 109090559-20162" MPE IP 43'R 109090559-20162" MPE IP 22'N 109090559-20161 1/4" MP E IP 27'W 950460 3 JT 2" STW IP 10'W 67E0902" MPE IP 25'S 107005614-1999 JT2" MPEI 51'2" MPE IP 24'E 107005614-1999 JT2" STW IP 10'S 67E0801 1/4" MPE IP 8'N 96060401 1/4" MPE IP 6'W 96060401 1/4" MPE IP 26'N 107005 614-1999 JT 2" MPE IP 165'N 107005614-1999 JTDEACT 2" PE-A 22'S 802-167DEACT 2" PE-A 22'S 802-1672" PE 17'W2" PE IP 17'W 94089502" MPE IP 12'N 107024999-2006 JT2" PE IP 10'S 9028522" MPE IP 14'W 107018265-20042" MPE IP NR 107008920-2001 JT2" MPE IP 17'W 107033796-20082" STW IP 6'N/SPL 5493-19632" STW IP 18'W 5493-19632" MPE IP 31'N 9504603 JT2" MPEI 35'W2" MPE IP 55'R 9504603 JT2" MPE IP 35'W 9504603 JT1 1/4" MPE IP 194'-20 186535125-20052" MPE IP 55'R 9504603 JT2" P 1 1/8" MPE2012-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2014-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2013-E3/4" STW-U19631 1/8" MPE2016-E5/8"916'E5/8"165'W1 1/8" MPE2016-E5/8" MPEI2007-E5/8"652'E1 1/8" MPE2016-E1 1/8" MPE2017-E1 1/8" MPE2018-E1 1/8" MPE2019-E1 1/8" MPE2018-E5/8" MP19955/8" MPEI19965/8" MPE19975/8" MPE19965/8" MPEI19965/8" MPE19965/8" MPEI19955/8" MPE19975/8" MPE19955/8" MPE19965/8" MPE19975/8" MPEI19961 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2016-E1 1/8" MPE2017-E5/8" MPEI19965/8" MPE20021/2" STW-U19681/2"5/8" MPE2007-E5/8" MPEI2007-E5/8" MPEI2007-E5/8" PE19825/8" MPEI2007-E5/8"374'E5/8"444'E5/8"376'E5/8" MPE20015/8" MPE2001-E5/8"5/8" MPE20011 1/8" MPE2017-E1 1/8" MPE2016-E5/8"180'E5/8" MPE2011-E5/8"142'E5/8"18 0'E5/8"164'E5/8"164'E 5/8"164'E5/8" MPEI2010-E1 1/8" MPEI2011-E5/8" MPEI2010-E5/8" MPEI2009-E5/8" MPE20031/2" STW-U19691/2" STW-U19691/2"1/2" STW-U19675/8"104'E5/8"38'E5/8"88'E5/8"964'E5/8"20'W5/8"972'E5/8" PE19945/8" PE19941 1/8" MPEI2009-E1 1/8" MPEI2010-E5/8" PE19855/8" PE19855/8" PE19945/8" MPEI19955/8" MPEI19965/8" MPE19965/8" MPE19955/8" MPEI20055/8" MPE19955/8" MPEI19975/8" MPEI19965/8" MPEI19955/8" MPEI20005/8" MPEI20015/8" MPEI20015/8" MPEI20005/8" MPEI20005/8"598'E1/2" STW-U19661/2" STW-U19671/2" STW-U19685/8"596'E5/8" MPE19961/2" STW-U19671/2" STW-U19671/2" STW-U19675/8" MPEI20045/8" PE19905/8"688'E5/8"736'E5/8"756'E5/8"816'E1/2" STW-U19731/2" STW-U19681/2" STW-U19675/8" MPE1998-E5/8"881'E3/4" STW-U19633/4" STW-U19635/8" MPE20005/8" MPEI20005/8" MPEI20005/8" MPEI20005/8" MPEI20015/8" MPEI20005/8" MPEI20003/4" STW-U19653/4" STW-U19653/4" STW-U19663/4" STW-U19665/8"504'E5/8"444'E1/2" STW-U19741/2" STW-U19725/8" MPEI2007-E5/8" MPEI2007-E5/8" MPEI2007-E5/8" MPE20005/8" MPE20005/8"446'E1/2" STW-U19695/8"528'E1/2" STW-U19665/8" PE1991-E1/2" STW-U19675/8" MPEI20005/8" MPE20005/8" MPEI20003/4" STW-U19655/8" MPEI20005/8" MPEI20001/2" STW-U19695/8" PE19905/8" PE19925/8" MPEI20045/8" MPEI20045/8" PE19795/8" MPEI2007-E5/8" MPEI2007-E3/4"0130'NTFTFTF8'STF612'ETF30'N57'S129'E 35'W91'R206'E13'E46'S50'W1123'E157'E24'S47'S154'W191'W753'E343'W605'E471'E35'E111'E246'E170'E74'E380'E53'S139'E121'S67'W716'E528'E197'W127'S948'S378'S349'S324'S267'S300'S254'N309'N568'S624'S635'S86'W868'S888'S862'E1008'E1007'E1051'E1080'E1079'E1120'E1153'E1154'E1183'E1187'E1204'Eunset50'W23'E75'E50'W268'N42'E343'E472'E15'W84'E79'E313'S147'S930'E929'E863'E781'E686'E595'E601'E752'E188'E182'E202'N145'N200'N25'W292'N346'N190'N288'E286'E177'W234'E 134'W634'E457'E384'E386'E530'E50'S136'E165'S22'S348'E12'W565'E16'W242'E153'N558'E682'E159'E45E93'E30'W503'E430'E214'EOF PAVAT EDGEMAIN ROPESJT BEGINSNRA157'E,14'S106327947A1-20 lbs106360611214'E,6'N-SPL106329576A1123'E,10'SAA A ATL157'ETLTLTL329'ETLTL130'NTL18'ETLTLTLTTTTT90E34'N11'S1'N22'NH92'E32'N31'NHH22'WH34'W329'E249'E1208'E336N 270'S312'N 200'N290'E153'N686'E180'W173'E182'ENR19'W,328'S20'W481'E15'WT93'ET151'NSP129'NS607'EBS610'E D2305E040, R2305E014, A2305E014S204080, Q204084The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“08-05-2021Scale 1:2278Lat\Long=47.5124, -122.1801MFP21003969