HomeMy WebLinkAbout0895.06 SWFR 333.pdf CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 1 of 3 333
Time On Site Time Off Site Date Day of Week
10:35 10:55 8/26/21 Thursday
NPDES Permit No. Reviewed
WAR-307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence G N - Chain link fence installed along site perimeter
2. Establish Construction Access
• Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
F N - Quarry spall construction entrance
- Light track out observed, continue to sweep offsite
roads during trucking operations
3. Control Flow Rates
• Stormwater Vault or Facility
• Straw Wattles
• Check Dams
G N - Onsite stormwater vault plugged
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers
• Vegetation
• Straw
• Sediment Ponds, Traps & Filters
• Treatment
• Sediment Pond (Temp. or Perm.)
• Water Truck
G N
- Silt fence installed around majority of site perimeter
- Stormwater sump SE of construction entrance
- Subsurface drain installed under construction
entrance to divert water to sump
- Straw wattles N of entrance to divert water to sump
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock
• Hydroseeding; Grass
• Plastic Sheeting
• Straw Stockpiles
• Stockpiles
• PAM
F N - Exposed soils in active use throughout site
6. Protect Slopes
• Benching; Track-Walking
• Pipe Slope Drains
• Plastic Sheeting; Anchors
G N - Straw wattles in place to divert water away from
slopes along western perimeter
- Slopes covered in straw
7. Protect Drain Inlets
• Catch Basin Inserts
• Gutter; Road
G N - CB inserts installed in offsite catch basins
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection
• Nets and Blankets
- - N/A
9. Control Pollutants
• Chemical Storage Area Covered
• Concrete Handling
G N - Stormwater treated with dry ice to lower pH to
suitable levels
- Chemical/material storage onsite
10. Control Dewatering G N - Via KC Sewer Discharge Permit as needed
11. Maintain BMPs F N - Continue sweeping offsite roads
12. Maintain SWPPP & Site Logbook G N - Available upon request
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities
• Permeable Pavement
- - N/A
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 2 of 3 333
Time On Site Time Off Site Date Day of Week
10:35 10:55 8/26/21 Thursday
NPDES Permit No. Reviewed
WAR-307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
Current Weather: __62°F, Overcast_ _
Precipitation since last inspection (approximate): 0.01 inches
Precipitation in the last 24 hours (approximate): 0.01 inches
Type of Visit: Weekly Monthly Post–Storm Event
Phase of Active Construction (check all that apply):
Pre-Construction Clearing/Demo/Grading Infrastructure/Roads Concrete pours Vertical Construction
Utilities Offsite improvements Site temporarily stabilized Final Stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter # _________
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of Discharge Notes
- - - - - -
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Maggie Perme CESCL Number: ECO-3-4042106 Inspection Date: 8/26/21
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 3 of 3 333
Time On Site Time Off Site Date Day of Week
10:35 10:55 8/26/21 Thursday
NPDES Permit No. Reviewed
WAR-307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
BMP LEGEND
JOB SHACK
WHEEL WASH
STORMWATER VAULT
TEMPORARY SEDIMENT POND/TRAP
WATTLE
SILT FENCE
CONSTRUCTION ENTRANCE
SUBSURFACE DRAIN
CHEMICAL/MATERIAL STORAGE
CATCH BASIN INSERT