Loading...
HomeMy WebLinkAboutMFP21004111.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21004111 IVR Number: 21004111 Permit Information Permit Name: Olympic Pipe Line Company Address/Location:08/17/2021Application Date:2146000010Parcel Number: 1010 THOMAS AVE SW Permit Type:09/22/2021Issue Date:Franchise Permit Work Class:09/22/2022Expiration Date:Major Utility Job Number: SW 10th 12 RS Casing MaintenanceFranchise Type:Natural Gas Description: Olympic Pipeline Company is required to install a vent and cathodic protection monitoring station at the pipeline crossing beneath SW 10th Avenue. Work includes excavating one area (8' W x 8' L x 8.5' D) to locate and inspect the north end of the casing. Once the casing is located on the north side of the curb along SW 10th Ave, the vent and test wires will be attached to the casing and brought to the ground surface about 16 feet to the north of the casing in a shallower, adjacent excavation (8' W x 8'L x 2' D) . The site will be restored to pre construction conditions and per City of Renton Trench Restoration and Street Overlay Requirements if the curb and roadway is impacted. Work will be completed in 2 to 3 days. Contacts Name Address PhoneTypeBilling CARLA WOODWORTH GEO ENGINEERS INC 8410 154th Ave NE REDMOND, WA 98052 B: (425) 861-6012Applicant Olympic Pipe Line Company 1006 CENTRAL Rd EVERSON, WA 98247 B: (425) 235-7736Applicant CARYL CHIAVERINI PERCHERON LLC B: (503) 539-0487Contact Brent Huwa Hanging H Companies LLC 4626 Weld County Road 65 Keenesburg, CO 80643 B: (360) 726-2334Contractor Business License Number: 50270Construction Contractor: HANGIHC830PC CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Dustin Lambert Olympic Pipeline - Billing 2319 Lind Ave SW Renton, WA 98057-3347 B: (425) 235-7711 C: (770) 317-5174 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date 8/11/2021 Olympic Pipe Line Company LLC SW 10th 12 RS Casing Maintenance Julie Yun Julie.Yun@bp.com 425.981.2501 SW 10th Street, South of Parcel No. 2146000020 SW 10th 12 RS Casing Maintenance Olympic is required to install a vent and cathodic protection monitoring station at the pipeline crossing beneath SW 10th Avenue. Work includes excavating one area (8' W x 8' L x 8.5' D) to locate and inspect the north end of the casing. Once the casing is located on the north side of the curb along SW 10th Ave, the vent and test wires will be attached to the casing and brought to the ground surface about 16 feet to the north of the casing in a shallower,adjacent excavation (8' W x 8'L x 2' D) . The site will be restored to pre-construction conditions and per City of Renton Trench Restoration and Street Overlay Requirements if the curb and roadway is impacted. Work will be completed in 2 to 3 days. X X X X David Walker, Hanging H Companies 360.661.3535 HangiHC830PC 50270 MFP21004111 Scott Warlick 9/22/2021 RESTORATION PER CITY OF RENTON STANDARDS This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 3/18/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 3/18/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2.The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: ▪Include map(s) showing the location of the project and work area. ▪Be legible lettering and clear, contrasting, symbols of viewing or printing. ▪Must indicate street names, and north arrow and scale. ▪Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. -Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering X X Olympic Pipeline SW 10th 12RS Casing Maintenance David Walker, Hanging H Companies Edward Smith, Olympic Pipe Line Co. LLC 600 SW 39th St. Suite 275 10/4/21 Renton/WA 98057 SW 10th Street, South of Parcel No. 2146000020 10/6/21 700 am 1600 pm Olympic is required to install a vent and cathodic protection monitoring station at the pipeline crossing beneath SW 10th Avenue. Work includes excavating one area (8' W x 8' L x 8.5' D) to locate and inspect the north end of the casing. The work will require closing the northern, west bound traffic lane on SW 10th Avenue. 425.981.2520 MFP21004111 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 9/22/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 3/18/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: •Must have approved Traffic Control Plan (TCP) prior to commencing the work. •Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •All permit conditions shall be met. NOTES: •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. •In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. Notes: 1.The locations of all features shown are approximate. 2.This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Olympic SW 10th Casing Maintenance Project Vicinity Map Renton, Washington Figure 1 Olympic SW 10th Casing Maintenance SiteThomas Ave SWPowell Ave SWSW 7th Street Lind Avenue SWSP: 0089412648\Working\SW10thAveCasingMaintenance.pptx CRW: 08/10/2021MFP21004111 Notes: 1.The locations of all features shown are approximate. 2.This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 3.An Olympic representative will accompany pedestrians around work area, if needed. 4.Refer to Table XI-1, above, for Sign Spacing Distance. 5.Speed limit in area is 30 mph. 6. Business and local access will be maintained. 7. Open traffic lane must be at least 9 feet wide. 8. Traffic control detour signs will be taken down at end of work shift. 9. Work area will be covered such that pedestrians can walk through work area during Off-Work Hours. 10. Traffic Control Plan prepared in general accordance toWSDOT Temporary Lane Closure Standard TC3 (Figure 3). Olympic SW 10th Casing Maintenance Project Traffic Control Plan Renton,Washington Figure 2 Olympic SW 10th Casing Maintenance Site NTS X TCP Contacts: Julie Yun Olympic/BP USPL 832-798-5897; JULIE.YUN@bp.com David Walker Hanging H Co. 360-661-3535; davwalker@hanginghco.com Thomas Ave SWCones or Barrels Work Zone Excavation dimensions: approx. 8’ (w) x 8’ (l) x 8.5’ (d) down to pipeline and 8’ (w) x 8’ (l) x 2’ (d) for test station and wiring SP: 0089412648\Working\SW10thAveCasingMaintenance.pptx CRW: 08/10/2021Staging Area in SW 10th Street MFP21004111 Notes: 1.The locations of all features shown are approximate. 2.This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Olympic SW 10th Casing Maintenance Project WSDOT TC3 Traffic Control Plan Renton, Washington Figure 3 SP: 0089412648\Working\SW10thAveCasingMaintenance.pptx CRW: 08/10/2021Thomas Ave SWPowell Ave SWSW 7th Street Lind Avenue SWMFP21004111 THOMAS AVENUE SWSW 10TH S T R E E T SW GRADY W A Y SW 12TH S T R E E TPOWELL AVENUE SWRAYMOND AVENUE SWI-405SW 13TH S T R E E T 3340404705 2146000050 21460000102146100033214610001221461000103340404470 2146000030 2146000040 1923059061 1923059030 1923059062 1923059078 1923059084 19230590872423049025 2423049099 2423049113 3340404730 3340404265 3340406625 3340407100 21460000202146000060OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_1-7.dwg TAB:S01 Date Exported: 08/16/21 - 11:04 by syiVICINITY MAP W E N S PARCEL MAP 0 SCALE IN FEET 1,000 2,000 0 SCALE IN FEET 300 600 APPLICANT / PROJECT DEVELOPER: OLYMPIC PIPE LINE COMPANY LLC 600 SW 39TH ST, SUITE 275 RENTON, WA 98057 REFERENCE DOCUMENTS: DATA SOURCE: MAPBOX OPEN STREET MAP, 2016. PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT. DWG TITLEDWG# SHEET INDEX: VICINITY MAP AND PROJECT INFORMATION12RS Casing Maintenance Site-A_1-7 SITE PLAN, ACCESS AND TESC/SPCC NOTES 12RS Casing Maintenance Site-A_3-7 12RS Casing Maintenance Site-A_2-7 TESC, GRADING PLAN AND TESC DETAILS W E N S PROJECT SITE 12RS CASING MAINTENANCE SITE SITE OWNER:LOCATION: CITY OF RENTON SW 10TH STREET ROW SOUTH OF 525 SW 7TH STREET RENTON, WA 98057 PARCEL NUMBER: SOUTH OF PARCEL NO. 2146000020 OLYMPIC PIPE LINE COMPANY LLC JULIE YUN 600 SW 39TH ST, SUITE 275 RENTON, WA 98057 OFFICE PHONE: (425) 981-2501 CELL PHONE: (832) 798-5897 EMAIL: JULIE.YUN@BP.COM SECTION - TOWNSHIP - RANGE: NW19 - T23N - R05E - WM LEGAL DESCRIPTION: LEGAL FOR PARCEL NO. 2146000020: EARLINGTON INDUSTRIAL PARK # 1 SPUR TRACK CROSS SECTIONS A-A', B-B' AND C-C' 12RS Casing Maintenance Site-A_5-7 12RS Casing Maintenance Site-A_4-7 SITE RESTORATION PLAN OLYMPIC PROJECT DEVELOPER CONTACT: CITY OF RENTON AND KING COUNTY, 2020, GIS DATA SHAPEFILES PARCEL BOUNDARIES, UNDERGROUND UTILITIES AND TOPO CONTOURS. GEOENGINEERS, INC. 2021, EXCAVATIONS AND FENCES CREATED FROM SKETCH ON AERIAL FROM BING AERIAL AND FROM SITE VISIT ON JULY 28, 2021. PROJECT MANAGER AND CESCL CONTACT INFORMATION: CONTRACTOR CONTACT INFORMATION: HANGING H COMPANIES SUPERINTENDENT DAVID WALKER 1912 S. BURLINGTON BLVD., SUITE 100 BURLINGTON, WA 98233 CELL PHONE: (360) 661-3535 GEOENGINEERS, INC. CARLA WOODWORTH 17425 NE UNION HILL ROAD, SUITE 250 REDMOND, WA 98052 OFFICE PHONE: (425) 861-6012 CELL PHONE: (425) 466-6772 12RS Casing Maintenance Site-A_6-7 TRENCH RESTORATION AND STREET OVERLAY REQUIREMENTS 12RS Casing Maintenance Site-A_7-7 TRENCH RESTORATION AND STREET OVERLAY REQUIREMENTS BNSF RAILROAD 525 SW 7TH STREET RENTON, WA 98057 NO. 2146000020 MFP21004111 This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR OPL12OPL12OPL12OPL12OPL12OPL12OPL12OPL12 OPL12OPL12OPL12OPL12OPL12OPL12OPL12OPL12 20 2020202 0 202020202525 252525 25 20202020 20202020 2020 25 252025 2520 25 20 20 25 25 2 0 202020THOMAS AVENUE SWSW 10TH S T R E E T SW GRADY W A Y SW 12TH S T R E E TPOWELL AVENUE SWRAYMOND AVENUE SWI-405 SW 13TH S T R E E T PARCEL #3340404705 PARCEL #2146000050 PARCEL #2146000010 PARCEL #2146100033 PARCEL #2146100012 PARCEL #2146100010 PARCEL #3340404470 PARCEL #2146000030 PARCEL #2146000040 PARCEL #1923059061 PARCEL #1923059030 PARCEL #1923059062 PARCEL #1923059078 PARCEL #1923059084 PARCEL #1923059087 PARCEL #2423049025 PARCEL #2423049099 PARCEL #2423049113 PARCEL #3340404730 PARCEL #3340404265 PARCEL #3340406625 PARCEL #3340407100 PARCEL #2146000020 (IM)8' (W) x 8' (L) x 8.5' (D) EXCAVATION 8' (W) x 8' (L) x 2' (D) EXCAVATION 12RS CASING MAINTENANCE SITE OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_2-7.dwg TAB:S02 Date Exported: 08/16/21 - 11:09 by syiDATA SOURCE: DATA FROM CITY OF RENTON GIS DATA AND AERIAL PHOTO FROM BING AERIAL. PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT. W E N S LEGEND SEWER LINE WATER LINE STORM DRAIN LINE SITE ACCESS PARCEL BOUNDARY OLYMPIC PIPELINE (12") 10-FOOT CONTOUR 50-FOOT CONTOUR OPL12 SCALE: SITE PLAN AND ACCESS 1" = 100'0 SCALE IN FEET 100 200 TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) NOTES 1.THESE TEMPORARY EROSION AND SEDIMENT CONTROL NOTES ARE FROM THE 2016 KING COUNTY SURFACE WATER DESIGN MANUAL, APPENDIX D (2016). 2.APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (TESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.). 3.THE IMPLEMENTATION OF THESE TESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/TESC SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 4.THE TESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. 5.THE TESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE TESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G. ADDITIONAL COVER MEASURES, ADDITIONAL SUMP PUMPS, AND SILT FENCES, PERIMETER PROTECTION ETC.) AS DIRECTED BY OLYMPIC/BP USPL. 6.THE CONTRACTOR SHALL MAINTAIN ALL PUBLIC ROADWAYS WITH STREET SWEEPING AS NECESSARY TO REMOVE SEDIMENT. 7.THE TESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/TESC SUPERVISOR AND MAINTAINED TO ENSURE CONTINUED PROPER FUNCTIONING. 8.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO CONSECUTIVE DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED TESC METHODS (E.G. SEEDING, MULCHING, PLASTIC COVERING, ETC.). 9.MATERIAL THAT MAY BE TEMPORARILY STORED FOR USE IN PROJECT ACTIVITIES SHALL BE COVERED WITH PLASTIC OR OTHER IMPERVIOUS MATERIAL AND PROTECTED BY APPROPRIATE BMPS TO PREVENT SEDIMENTS FROM BEING WASHED FROM THE STORAGE AREA TO SURFACE WATERS. (BA-6, BA-27). 10.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT-LADEN WATER INTO THE DOWNSTREAM SYSTEM. SPILL PREVENTION, COUNTERMEASURES AND CONTROL (SPCC) NOTES 1.THE CONTRACTOR SHALL PREPARE A SPCC PLAN PRIOR TO BEGINNING CONSTRUCTION. THE SPCC PLAN SHALL IDENTIFY THE APPROPRIATE SPILL CONTAINMENT MATERIALS, WHICH WILL BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES, DETAIL THE PROCEDURES THAT WILL BE FOLLOWED IN THE EVENT OF A SPILL TO PREVENT OR MINIMIZE EFFECTS, AND WILL SPECIFICALLY ADDRESS POTENTIAL FUEL SPILLS FROM VEHICLES AND POTENTIAL SPILLS OF CHEMICALS THAT ARE COMMONLY USED DURING CONSTRUCTION. 2.THE CONTRACTOR SHALL ENSURE THAT FUEL AND CHEMICAL STORAGE IS STORED WITHIN SECONDARY CONTAINMENT AREAS. THE SECONDARY CONTAINMENT SHALL BE SURFACED WITH AN IMPERMEABLE MATERIAL AND SIZED TO CONTAIN THE VOLUME OF STORED FUEL AND/OR CHEMICALS. TO PROTECT FROM RAIN AND SNOW, IT IS RECOMMENDED THAT CONTAINERS AND THE SECONDARY CONTAINMENT BE INSIDE A BUILDING OR UNDER SOME TYPE OF PROTECTIVE COVERING. THE COVER MUST ALLOW FOR ADEQUATE INSPECTION. COVERED SECONDARY CONTAINMENT MUST BE LARGE ENOUGH TO CONTAIN TEN PERCENT OF THE FREE LIQUID IN ALL CONTAINERS OR 100 PERCENT OF THE FREE LIQUID IN THE LARGEST CONTAINER. UNCOVERED SECONDARY CONTAINMENT MUST HAVE CAPACITY TO HOLD THE ADDITIONAL PRECIPITATION RESULTING FROM A MAXIMUM 25-YEAR STORM LASTING 24 HOURS. THAT IS, THE CONTAINMENT SYSTEM MUST HOLD THE VOLUME OF WATER RESULTING FROM A 24-HOUR RAINFALL WITH AN AVERAGE RAINFALL INTENSITY (IN INCHES/HOUR) OF A STORM THAT SHOULD OCCUR ONLY ONCE IN EVERY 25 YEARS. 3.SPILL RESPONSE EQUIPMENT WILL BE LOCATED WITHIN THE CONSTRUCTION ZONES TO MINIMIZE COUNTERMEASURE RESPONSE TIMES. 4.THERE WILL BE NO VISIBLE SHEEN FROM PETROLEUM PRODUCTS AS A RESULT OF PROJECT ACTIVITIES. 5.FUEL HOSES, OIL DRUMS, OIL OR FUEL TRANSFER VALVES AND FITTINGS, ETC., SHALL BE CHECKED REGULARLY FOR DRIPS OR LEAKS, AND SHALL BE MAINTAINED AND STORED PROPERLY TO PREVENT SPILLS. 6.ALL CONSTRUCTION DEBRIS AND OTHER SOLID WASTE MATERIAL SHALL BE PROPERLY MANAGED AND DISPOSED OF IN AN DISPOSAL SITE APPROVED BY THE APPROPRIATE REGULATORY AUTHORITY. TESC CONSTRUCTION SEQUENCE NOTES 1.HOLD THE PRE-CONSTRUCTION MEETING. 2.INSTALL CATCH BASIN PROTECTION, IF REQUIRED. 3.INSTALL PERIMETER PROTECTION (STRAW WATTLE) AS NEEDED. 4.MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH KING COUNTY SURFACE WATER DESIGN MANUAL (2016) STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. 5.RELOCATE EROSION CONTROL MEASURES, OR INSTALL NEW MEASURES AS NEEDED. 6.COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT. 7.PR0VIDE TEMPORARY STABILIZATION OF ALL AREAS, WITHIN SEVEN DAYS OF COMPLETING CONSTRUCTION ACTIVITIES. 8.RESTORE CURB AND ROADWAY TO PRECONSTRUCTION CONDITIONS, AS NEEDED, PER STANDARD DETAILS PROVIDED ON SHEETS 6 AND 7. 9.UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE BMPS. 10.ALL CONSTRUCTION DEBRIS, EXCESS SEDIMENT AND OTHER SOLID WASTE MATERIAL SHALL BE PROPERLY MANAGED AND DISPOSED OF IN DISPOSAL SITE APPROVED BY THE APPROPRIATE REGULATORY AUTHORITY. RESTORATION RESTORATION IS TO BE COMPLETED AS SHOWN ON DRAWINGS 5, 6 AND 7. MFP21004111 3'-4' ADJACENT ROLLS SHALL TIGHTLY ABUT STRAW ROLLS MUST BE PLACED ALONG SLOPE CONTOURS STRAW WATTLE (MID 9998192) SCALE: 1STRAW WATTLE DETAIL NOT TO SCALE (ECOLOGY BMP C235) ROLL SPACING DEPENDS ON SOIL TYPE AND SLOPE STEEPNESS 10'-25' (3-8m) 3"-5" (75-125mm) SEDIMENT, ORGANIC MATTER, AND NATIVE SEEDS ARE CAPTURED BEHIND THE ROLLS 1" x 1" STAKE 8"-10" DIA. (200-250mm) NOTES: 1.STRAW ROLL INSTALLATION REQUIRES THE PLACEMENT AND SECURE STAKING OF THE ROLL IN A TRENCH, 3" x 5" (75-125mm) DEEP, DUG ON CONTOUR OR WEIGHING IN PLACE WITH SANDBAGS NO FURTHER THAN 5 FT. APART. 2.RUNOFF MUST NOT BE ALLOWED TO RUN UNDER OR AROUND ROLL. LIVE STAKE OPL12OPL12OPL12OPL12OPL12OPL12OPL12OPL12OPL12OP L 1 2 OPL12 OPL12 OPL12 OPL12 OPL12 OPL12 OPL12 GASGASGASGASPARCEL #2146000050 PARCEL #2146000010 PARCEL #1923059087 PARCEL #2423049025 PARCEL #2146000020 B' B A'AC' C 8' 16' 8' 8' 8' (W) x 8' (L) x 8.5' (D) EXCAVATION PROPOSED TEST STATION LOCATION END OF CASING 8' (W) x 8' (L) x 2' (D) EXCAVATION FIRE HYDRANT SW 10TH S T R E E T SCALE: 2 INLET PROTECTION WITH SECTIONS NOT TO SCALE GRATE FRAME SEDIMENT AND DEBRIS DRAINAGE GRATE 5" MAX TRIM OVERFLOW BYPASS BELOW INLET GRATE DEVICE FILTERED WATER DRAINAGE GRATE ~RECTANGULAR GRATE SHOWN BELOW INLET GRATE DEVICE OVERFLOW BYPASS (TYP) NOTES: 1.SIZE THE "BELOW INLET GRATE DEVICE" (BIGD) FOR THE STORM WATER STRUCTURE IT WILL SERVICE 2.THE BIGD SHALL HAVE A BUILT-IN HIGH-FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 3.THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING HTE COLLECTED MATERIAL. 4.PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15). RETRIEVAL SYSTEM (TYP) (ECOLOGY BMP C220) OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_3-7.dwg TAB:S03 Date Exported: 08/16/21 - 11:28 by syiSCALE: DETAILED SITE PLAN 1" = 10' 0 SCALE IN FEET 10 20 DATA SOURCE: DATA FROM CITY OF RENTON GIS DATA AND AERIAL PHOTO FROM BING AERIAL. PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT. W E N S LEGEND STRAW WATTLE (BMP C235) CATCH BASIN INSERT (BMP C220) SEWER LINE STORM DRAIN LINE WATER LINE GAS LINE PARCEL BOUNDARY OLYMPIC PIPELINE (12")OPL12 NOTE: 1.A VACUUM TRUCK WILL BE USED TO COMPLETE EXCAVATION ACTIVITIES. SOILS REMOVED FROM EXCAVATION WILL BE TRANSPORTED OFFSITE TO AN AUTHORIZED DISPOSAL FACILITY. GAS MFP21004111 Elevation (Feet)Elevation (Feet)Distance (Feet) 10 12 14 16 18 20 22 10 12 14 16 18 20 22 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 Elevation (Feet)Elevation (Feet)Distance (Feet) 10 12 14 16 18 20 22 10 12 14 16 18 20 22 0 2 4 6 8 10 12 14 16 18 20 Elevation (Feet)Elevation (Feet)Distance (Feet) 10 12 14 16 18 20 22 10 12 14 16 18 20 22 0 2 4 6 8 10 12 14 16 18 20 A (North) A' (South) B (West) B' (East) C (West) C' (East) INSTALL VENT AND TEST WIRES CURB EXISTING GROUND SURFACE - GRASS EXISTING GRADE SURFACE/ASPHALT PAVING EXISTING 12-INCH OLYMPIC PIPELINE 2.0' 6.5' 8.5' 8' (W) x 8' (L) x 2' (D) EXCAVATION 8' (W) x 8' (L) x 8.5' (D) EXCAVATION 8.0'8.0' 8' (W) x 8' (L) x 2' (D) EXCAVATION INSTALL VENT AND TEST WIRES EXISTING GRADE SURFACE EXISTING 12-INCH OLYMPIC PIPELINE EXISTING GRADE SURFACE EXISTING 12-INCH OLYMPIC PIPELINE 8' (W) x 8' (L) x 8.5' (D) EXCAVATION SW 10TH STREET SW 10TH STREET RIGHT-OF-WAYPARCEL NO. 2146000020 APPROXIMATE END OF CASING (DEPTH OF COVER 7.5 FT.) INSTALL VENT AND TEST WIRES OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_4-7.dwg TAB:S04 Date Exported: 08/16/21 - 11:35 by syiSCALE: CROSS SECTION A-A' 1" = 2' 0 SCALE IN FEET 2 4 SCALE: CROSS SECTION B-B' 1" = 2' 0 SCALE IN FEET 2 4 SCALE: CROSS SECTION C-C' 1" = 2' 0 SCALE IN FEET 2 4 MFP21004111 OPL12OPL12OPL12OPL12OPL12OPL12OPL12OPL12OPL12OP L 1 2 OPL12 OPL12 OPL12 GASGASGASGASSW 10TH S T R E E T PARCEL #2146000050 PARCEL #2146000010 PARCEL #2423049025 PARCEL #2146000020 OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_5-7.dwg TAB:S05 Date Exported: 08/16/21 - 11:30 by syiSCALE: SITE RESTORATION PLAN 1" = 10' 0 SCALE IN FEET 10 20 DATA SOURCE: DATA FROM CITY OF RENTON GIS DATA AND AERIAL PHOTO FROM BING AERIAL. PROJECTION: NAD83 WASHINGTON STATE PLANES, NORTH ZONE, US FOOT. W E N S PARCEL BOUNDARY OLYMPIC PIPELINE (12") LEGEND SEWER LINE STORM DRAIN LINE WATER LINE GAS LINE GRASS SEED AND MULCH WITHIN DISTURBANCE AREAS RESTORATION PLANTable 4.1.3 - Landscaping Seed Mix CoPPon NaPe Latin NaPe  Weight  Purity  GerPination Perennial rye blend Lolium perenne 70 98 90 Chewings and red fescue blend Festuca rubra var. commutata or Fes- tuca rubra 30 98 90 OPL12 REFERENCE: KING COUNTY SURFACE WATER DESIGN MANUAL, 2016 FIGURE D.2.1.2.2 MULCHING, FIGURE D.2.1.2.6 TEMPORARY AND PERMANENT SEEDING. D.2.1.2.2: MULCHING PURPOSE THE PURPOSE OF MULCHING SOILS IS TO PROVIDE IMMEDIATE TEMPORARY PROTECTION FROM EROSION. MULCH ALSO ENHANCES PLANT ESTABLISHMENT BY CONSERVING MOISTURE, HOLDING FERTILIZER, SEED, AND TOPSOIL IN PLACE, AND MODERATING SOIL TEMPERATURES. THERE IS AN ENORMOUS VARIETY OF MULCHES THAT MAY BE USED. ONLY THE MOST COMMON TYPES ARE DISCUSSED IN THIS SECTION. CONDITIONS OF USE AS A TEMPORARY COVER MEASURE, MULCH SHOULD BE USED: 1.ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS. 2.AS A COVER FOR SEED DURING THE WET SEASON AND DURING THE HOT SUMMER MONTHS. 3.DURING THE WET SEASON ON SLOPES STEEPER THAN 3H:1V WITH MORE THAN 10 FEET OF VERTICAL RELIEF. DESIGN AND INSTALLATION SPECIFICATIONS FOR MULCH MATERIALS, APPLICATION RATES, AND SPECIFICATIONS, SEE TABLE D.2.1.2.A. NOTE: THICKNESSES MAY BE INCREASED FOR DISTURBED AREAS IN OR NEAR CRITICAL AREAS OR OTHER AREAS HIGHLY SUSCEPTIBLE TO EROSION. MAINTENANCE STANDARDS 1.THE THICKNESS OF THE COVER MUST BE MAINTAINED. 2.ANY AREAS THAT EXPERIENCE EROSION SHALL BE REMULCHED AND/OR PROTECTED WITH A NET OR BLANKET. IF THE EROSION PROBLEM IS DRAINAGE RELATED, THEN THE DRAINAGE PROBLEM SHALL BE ASSESSED AND ALTERNATE DRAINAGE SUCH AS INTERCEPTOR SWALES MAY BE NEEDED TO FIX THE PROBLEM AND THE ERODED AREA REMULCHED. D.2.1.2.6: TEMPORARY AND PERMANENT SEEDING PURPOSE SEEDING IS INTENDED TO REDUCE EROSION BY STABILIZING EXPOSED SOILS. A WELL-ESTABLISHED VEGETATIVE COVER IS ONE OF THE MOST EFFECTIVE METHODS OF REDUCING EROSION. CONDITIONS OF USE 1.SEEDING SHALL BE USED THROUGHOUT THE PROJECT ON DISTURBED AREAS THAT HAVE REACHED FINAL GRADE OR THAT WILL REMAIN UNWORKED FOR MORE THAN 30 DAYS. 2.VEGETATION-LINED CHANNELS SHALL BE SEEDED. CHANNELS THAT WILL BE VEGETATED SHOULD BE INSTALLED BEFORE MAJOR EARTHWORK AND HYDROSEEDED OR COVERED WITH A BONDED FIBER MATRIX (BFM). 3.RETENTION/DETENTION PONDS SHALL BE SEEDED AS REQUIRED. 4.AT THE COUNTY'S DISCRETION, SEEDING WITHOUT MULCH DURING THE DRY SEASON IS ALLOWED EVEN THOUGH IT WILL TAKE MORE THAN SEVEN DAYS TO DEVELOP AN EFFECTIVE COVER. MULCH IS, HOWEVER, RECOMMENDED AT ALL TIMES BECAUSE IT PROTECTS SEEDS FROM HEAT, MOISTURE LOSS, AND TRANSPORT DUE TO RUNOFF. 5.AT THE BEGINNING OF THE WET SEASON, ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS (SEE SECTION D.2.4.2). DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE DPER INSPECTOR. THE DPER INSPECTOR MAY REQUIRE SEEDING OF ADDITIONAL AREAS IN ORDER TO PROTECT SURFACE WATERS, ADJACENT PROPERTIES, OR DRAINAGE FACILITIES. 6.AT FINAL SITE STABILIZATION, ALL DISTURBED AREAS NOT OTHERWISE VEGETATED OR STABILIZED SHALL BE SEEDED AND MULCHED (SEE SECTION D.2.4.5). DESIGN AND INSTALLATION SPECIFICATIONS 1.THE BEST TIME TO SEED IS APRIL 1 THROUGH JUNE 30, AND SEPTEMBER 1 THROUGH OCTOBER 15. AREAS MAY BE SEEDED BETWEEN JULY 1 AND AUGUST 31, BUT IRRIGATION MAY BE REQUIRED IN ORDER TO GROW ADEQUATE COVER. AREAS MAY ALSO BE SEEDED DURING THE WINTER MONTHS, BUT IT MAY TAKE SEVERAL MONTHS TO DEVELOP A DENSE GROUNDCOVER DUE TO COLD TEMPERATURES. THE APPLICATION AND MAINTENANCE OF MULCH IS CRITICAL FOR WINTER SEEDING. 2.TO PREVENT SEED FROM BEING WASHED AWAY, CONFIRM THAT ALL REQUIRED SURFACE WATER CONTROL MEASURES HAVE BEEN INSTALLED. 3.THE SEEDBED SHOULD BE FIRM BUT NOT COMPACTED BECAUSE SOILS THAT ARE WELL COMPACTED WILL NOT VEGETATE AS QUICKLY OR THOROUGHLY. SLOPES STEEPER THAN 3H:1V SHALL BE SURFACE ROUGHENED. ROUGHENING CAN BE ACCOMPLISHED IN A VARIETY OF WAYS, BUT THE TYPICAL METHOD IS TRACK WALKING, OR DRIVING A CRAWLING TRACTOR UP AND DOWN THE SLOPE, LEAVING CLEAT IMPRINTS PARALLEL TO THE SLOPE CONTOURS. 4.IN GENERAL, 10-20-20 N-P-K (NITROGEN-PHOSPHORUS-POTASSIUM) FERTILIZER MAY BE USED AT A RATE OF 90 POUNDS PER ACRE. SLOW-RELEASE FERTILIZERS ARE PREFERRED BECAUSE THEY ARE MORE EFFICIENT AND HAVE FEWER ENVIRONMENTAL IMPACTS. IT IS RECOMMENDED THAT AREAS BEING SEEDED FOR FINAL LANDSCAPING CONDUCT SOIL TESTS TO DETERMINE THE EXACT TYPE AND QUANTITY OF FERTILIZER NEEDED. THIS WILL PREVENT THE OVER- APPLICATION OF FERTILIZER. DISTURBED AREAS WITHIN 200 FEET OF WATER BODIES AND WETLANDS MUST USE SLOW- RELEASE LOW-PHOSPHORUS FERTILIZER (TYPICAL PROPORTIONS 3-1-2 N-P-K). 5.THE FOLLOWING REQUIREMENTS APPLY TO MULCHING: a.MULCH IS ALWAYS REQUIRED FOR SEEDING SLOPES GREATER THAN 3H:1V (SEE SECTION D.2.1.2.2). b.IF SEEDING DURING THE WET SEASON, MULCH IS REQUIRED. c.THE USE OF MULCH MAY BE REQUIRED DURING THE DRY SEASON AT THE COUNTY'S DISCRETION IF GRASS GROWTH IS EXPECTED TO BE SLOW, THE SOILS ARE HIGHLY ERODIBLE DUE TO SOIL TYPE OR GRADIENT, THERE IS A WATER BODY CLOSE TO THE DISTURBED AREA, OR SIGNIFICANT PRECIPITATION (SEE SECTION D.2.4.2) IS ANTICIPATED BEFORE THE GRASS WILL PROVIDE EFFECTIVE COVER. d.MULCH MAY BE APPLIED ON TOP OF THE SEED OR SIMULTANEOUSLY BY HYDROSEEDING. 6.HYDROSEEDING IS ALLOWED AS LONG AS TACKIFIER IS INCLUDED. HYDROSEEDING WITH WOOD FIBER MULCH IS ADEQUATE DURING THE DRY SEASON. DURING THE WET SEASON, THE APPLICATION RATE SHALL BE DOUBLED BECAUSE THE MULCH AND TACKIFIER USED IN HYDROSEEDING BREAK DOWN FAIRLY RAPIDLY. IT MAY BE NECESSARY IN SOME APPLICATIONS TO INCLUDE STRAW WITH THE WOOD FIBER, BUT THIS CAN BE DETRIMENTAL TO GERMINATION. 7.AREAS TO BE PERMANENTLY LANDSCAPED SHALL USE SOIL AMENDMENTS. GOOD QUALITY TOPSOIL SHALL BE TILLED INTO THE TOP SIX INCHES TO REDUCE THE NEED FOR FERTILIZER AND IMPROVE THE OVERALL SOIL QUALITY. MOST NATIVE SOILS WILL REQUIRE THE ADDITION OF FOUR INCHES OF WELL-ROTTED COMPOST TO BE TILLED INTO THE SOIL TO PROVIDE A GOOD QUALITY TOPSOIL. COMPOST USED SHOULD MEET SPECIFICATIONS PROVIDED IN REFERENCE 11-C OF THE SWDM. 8.THE SEED MIXES LISTED BELOW INCLUDE RECOMMENDED MIXES FOR BOTH TEMPORARY AND PERMANENT SEEDING. THESE MIXES, WITH THE EXCEPTION OF THE WETLAND MIX, SHALL BE APPLIED AT A RATE OF 120 POUNDS PER ACRE. THIS RATE MAY BE REDUCED IF SOIL AMENDMENTS OR SLOW-RELEASE FERTILIZERS ARE USED. LOCAL SUPPLIERS SHOULD BE CONSULTED FOR THEIR RECOMMENDATIONS BECAUSE THE APPROPRIATE MIX DEPENDS ON A VARIETY OF FACTORS, INCLUDING EXPOSURE, SOIL TYPE, SLOPE, AND EXPECTED FOOT TRAFFIC. ALTERNATIVE SEED MIXES APPROVED BY THE COUNTY MAY BE USED. MAINTENANCE STANDARDS FOR TEMPORARY AND PERMANENT SEEDING 1.ANY SEEDED AREAS THAT FAIL TO ESTABLISH AT LEAST 80 PERCENT COVER WITHIN ONE MONTH SHALL BE RESEEDED. IF RESEEDING IS INEFFECTIVE, AN ALTERNATE METHOD, SUCH AS SODDING OR NETS/BLANKETS, SHALL BE USED. IF WINTER WEATHER PREVENTS ADEQUATE GRASS GROWTH, THIS TIME LIMIT MAY BE RELAXED AT THE DISCRETION OF THE COUNTY WHEN CRITICAL AREAS WOULD OTHERWISE BE PROTECTED. 2.AFTER ADEQUATE COVER IS ACHIEVED, ANY AREAS THAT EXPERIENCE EROSION SHALL BE RE-SEEDED AND PROTECTED BY MULCH. IF THE EROSION PROBLEM IS DRAINAGE RELATED, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA RE-SEEDED AND PROTECTED BY MULCH. 3.SEEDED AREAS SHALL BE SUPPLIED WITH ADEQUATE MOISTURE, BUT NOT WATERED TO THE EXTENT THAT IT CAUSES RUNOFF. GAS SW 10TH STREET ROAD SURFACE AND CURB WILL BE RESTORED TO PRECONSTRUCTION CONDITIONS, AS NEEDED, PER STANDARDS ON SHEETS 6 AND 7. MFP21004111 OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_6-7.dwg TAB:S06 Date Exported: 08/16/21 - 11:02 by syiREFERENCE: CITY OF RENTON - NOTES FROM DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT. DETAILS FROM PUBLIC WORKS DEPARTMENT. APPLICATION THE FOLLOWING STANDARDS IN THIS SECTION SHALL BE FOLLOWED WHEN DOING TRENCH OR EXCAVATION WORK WITHIN THE PAVED PORTION OF ANY CITY OF RENTON RIGHT-OF-WAY. MODIFICATIONS OR EXEMPTIONS TO THESE STANDARDS MAY BE AUTHORIZED BY THE COMMUNITY AND ECONOMIC DEVELOPMENT ADMINISTRATOR, OR AUTHORIZED REPRESENTATIVE, UPON WRITTEN REQUEST BY THE PERMITTEE, THE PERMITTEE'S CONTRACTOR OR ENGINEER, AND DEMONSTRATION OF AN EQUIVALENT ALTERNATIVE. HOURS OF OPERATIONS HOURS FOR WORK WITHIN THE ROADWAY FOR ASPHALT OVERLAYS OR TRENCH RESTORATION SHALL BE AS DIRECTED BY THE TRAFFIC CONTROL PLAN REQUIREMENTS AND THE TRAFFIC OPERATIONS ENGINEER. INSPECTION THE ENGINEER MAY DETERMINE IN THE FIELD THAT A FULL STREET-WIDTH (EDGE-OF-PAVEMENT TO EDGE-OF-PAVEMENT) OVERLAY IS REQUIRED DUE TO CHANGES IN THE PERMIT CONDITIONS SUCH AS, BUT NOT LIMITED TO THE FOLLOWING: 1.THERE HAS BEEN DAMAGE TO THE EXISTING ASPHALT SURFACE DUE TO THE CONTRACTOR'S EQUIPMENT. 2.THE TRENCH WIDTH WAS INCREASED SIGNIFICANTLY OR THE EXISTING PAVEMENT IS UNDERMINED OR DAMAGED. 3.ANY OTHER CONSTRUCTION RELATED ACTIVITIES THAT REQUIRE ADDITIONAL PAVEMENT RESTORATION. CITY OF RENTON STANDARDS ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARD AND SUPPLEMENTAL SPECIFICATIONS (CURRENT ADOPTED VERSION) EXCEPT WHERE OTHERWISE NOTED IN THESE STANDARDS. MATERIALS AND WORKMANSHIP ARE REQUIRED TO BE IN CONFORMANCE WITH STANDARDS FOR THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION PREPARED BY THE WASHINGTON STATE CHAPTER OF THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA) AND THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION (WSDOT) AND SHALL COMPLY WITH THE CURRENT EDITION, AS MODIFIED BY THE CITY OF RENTON SUPPLEMENTAL SPECIFICATIONS. 1.AN ASPHALT PAVER SHALL BE USED IN ACCORDANCE WITH SECTION 5-04.3(3) OF STANDARD SPECIFICATIONS. A “LAYTON BOX” OR EQUAL MAY BE USED IN PLACE OF THE POWER-PROPELLED PAVER. ROLLERS SHALL BE USED IN ACCORDANCE WITH SECTION 5- 04.3(4) OF THE STANDARD SPECIFICATIONS. “PLATE COMPACTORS” AND “JUMPING JACKS” SHALL NOT BE USED IN LIEU OF ROLLERS. 2.TRENCH BACKFILL AND RESURFACING SHALL BE AS SHOWN IN THE CITY OF RENTON STANDARD DETAILS, UNLESS MODIFIED BY THE CITY PERMIT. SURFACING DEPTHS SHOWN IN THE STANDARD DETAILS ARE MINIMUMS AND MAY BE INCREASED BY THE ENGINEER TO MEET TRAFFIC LOADS OR SITE CONDITIONS. 3.REQUIREMENT FOR PATCHING, OVERLAY, AND OVERLAY WIDTHS: ALL TRENCH AND PAVEMENT CUTS SHALL BE MADE BY SAWCUT OR BY GRINDING. SAWCUTS OR GRINDING SHALL BE A MINIMUM OF ONE FOOT (1') OUTSIDE THE TRENCH WIDTH. THE TOP TWO INCHES (2") OF ASPHALT SHALL BE GROUND DOWN TO A MINIMUM DISTANCE OF ONE FOOT (1') BEYOND THE ACTUAL OUTSIDE EDGES OF THE TRENCH AND SHALL BE REPLACED WITH TWO INCHES (2") OF CLASS B ASPHALT, PER CITY OF RENTON STANDARD PLANS. AT THE DISCRETION OF THE ENGINEER, A FULL STREET WIDTH OVERLAY MAY BE REQUIRED. LANE-WIDTH OR A FULL STREET-WIDTH OVERLAY WILL BE DETERMINED BASED UPON THE LOCATION AND LENGTH OF THE PROPOSED TRENCH WITHIN THE ROADWAY CROSS-SECTION. CHANGES IN FIELD CONDITIONS MAY WARRANT IMPLEMENTATION OF ADDITIONAL OVERLAY REQUIREMENTS. a.TRENCHES (ROAD CROSSINGS): (1)THE MINIMUM WIDTH OF A TRANSVERSE PATCH (ROAD CROSSING) SHALL BE SIX AND ONE-HALF FEET (6.5'). SEE CITY OF RENTON STANDARD PLANS. (2)ANY AFFECTED LANE WILL BE GROUND DOWN TWO INCHES (2") AND PAVED FOR THE ENTIRE WIDTH OF THE LANE. (3)THE PATCH SHALL BE A MINIMUM OF ONE FOOT (1') BEYOND THE EXCAVATION AND PATCH LENGTH SHALL BE A MINIMUM OF AN ENTIRE TRAVELED LANE. (4)IF THE OUTSIDE OF THE TRENCHING IS WITHIN THREE FEET (3') OF ANY ADJACENT LANE LINE, THE ENTIRE ADJACENT TRAVELED LANE AFFECTED WILL BE REPAVED. (5)AN AREA INCLUDING THE TRENCH AND ONE FOOT (1') ON EACH SIDE OF THE TRENCH BUT NOT LESS THAN SIX AND ONE- HALF FEET (6.5') TOTAL FOR THE ENTIRE WIDTH OF THE AFFECTED TRAVELED LANES WILL BE GROUND DOWN TO A DEPTH OF TWO INCHES (2"). A TWO-INCH (2") OVERLAY OF CLASS B ASPHALT WILL BE APPLIED PER CITY STANDARDS. b.TRENCHES RUNNING PARALLEL WITH THE STREET: (1)THE MINIMUM WIDTH OF A LONGITUDINAL PATCH SHALL BE FOUR AND ONE-HALF FEET (4.5'). SEE CITY OF RENTON STANDARD PLANS. (2)IF THE TRENCHING IS WITHIN A SINGLE TRAVELED LANE, AN ENTIRE LANE-WIDTH OVERLAY WILL BE REQUIRED. (3)IF THE OUTSIDE OF THE TRENCHING IS WITHIN THREE FEET (3') OF ANY ADJACENT LANE LINE, THE ENTIRE ADJACENT TRAVELED LAND AFFECTED WILL BE OVERLAID. (4)IF THE TRENCHING IS GREATER THAN OR EQUAL TO 30% OF LANE PER BLOCK (660 FOOT MAXIMUM BLOCK LENGTH), OR IF THE TOTAL PATCHES EXCEED 12 PER BLOCK, THEN THE LANES AFFECTED WILL BE OVERLAID. MINIMUM OVERLAY SHALL INCLUDE ALL PATCHES WITHIN THE BLOCK SECTION. (5)THE ENTIRE TRAVELED LANE WIDTH FOR THE LENGTH OF THE TRENCH AND AN ADDITIONAL TEN FEET (10′) AT EACH END OF THE TRENCH WILL BE GROUND DOWN TO A DEPTH OF TWO INCHES (2′′). A TWO-INCH (2′′) OVERLAY OF CLASS B WILL BE APPLIED PER CITY STANDARDS. 4.PAVEMENT REMOVAL IN LIEU OF GRINDING: THE CONTRACTOR IN ALL CASES CAN REMOVE THE PAVEMENT IN THE REPLACEMENT AREA INSTEAD OF GRINDING OUT THE SPECIFIED TWO INCHES (2") OF ASPHALT. FULL PAVEMENT REPLACEMENT TO MEET OR EXCEED THE EXISTING PAVEMENT DEPTH WILL BE REQUIRED FOR THE AREA OF PAVEMENT REMOVAL. PATCHING OF PERVIOUS CONCRETE SHALL FOLLOW AMERICAN CONCRETE INSTITUTE (ACI) 522.1-13. POROUS ASPHALT SHALL BE SPECIFIED ON A PROJECT-BY-PROJECT BASIS BY THE ENGINEER. PERMEABLE MATERIALS SHOULD BE REPLACED IN-KIND WHERE FEASIBLE. PATCHING POROUS ASPHALT WITH CONVENTIONAL ASPHALT IS ACCEPTABLE IF IT IS NO MORE THAN TEN PERCENT (10%) OF THE TOTAL FACILITY AREA OR DOES NOT IMPACT THE OVERALL FACILITY FUNCTION. APPROPRIATE PRECAUTIONS SHALL BE TAKEN DURING PAVEMENT REPAIR AND REPLACEMENT EFFORTS TO PREVENT CLOGGING OF ADJACENT SURFACES. 5.TRENCH BACKFILL AND RESTORATION CONSTRUCTION REQUIREMENTS: a.TRENCH RESTORATION SHALL BE EITHER BY A PATCH OR OVERLAY METHOD, AS REQUIRED AND INDICATED ON CITY OF RENTON STANDARD PLANS. b.ALL TRENCH AND PAVEMENT CUTS, WHICH WILL NOT BE OVERLAID, SHALL BE MADE BY SAWCUT OR GRINDING. SAWCUTS SHALL BE A MINIMUM OF TWO FEET (2') OUTSIDE THE EXCAVATED TRENCH WIDTH. c.ALL TRENCHING WITHIN THE TOP FOUR FEET (4') SHALL BE BACKFILLED WITH CRUSHED SURFACING MATERIALS CONFORMING TO SECTION 4-04 OF THE STANDARD SPECIFICATIONS. ANY TRENCHING OVER FOUR FEET (4') IN DEPTH MAY USE MATERIALS APPROVED BY THE ENGINEER OR MATERIALS LAB FOR BACKFILLING BELOW THE FOUR-FOOT (4') DEPTH. d.IF THE EXISTING MATERIAL (OR OTHER MATERIAL) IS DETERMINED BY THE ENGINEER TO BE SUITABLE FOR BACKFILL, THE CONTRACTOR MAY USE THE NATIVE MATERIAL EXCEPT THAT THE TOP SIX INCHES (6") SHALL BE CRUSHED SURFACING TOP COURSE MATERIAL. e.THE TRENCH SHALL BE COMPACTED TO A MINIMUM NINETY-FIVE PERCENT (95%) DENSITY, AS DESCRIBED IN SECTION 2- 03 OF THE STANDARD SPECIFICATIONS. IN THE TOP SIX FEET (6') OF ANY TRENCH, BACKFILL COMPACTION SHALL BE PERFORMED IN EIGHT (8) TO TWELVE-INCH (12") LIFTS. ANY TRENCH DEEPER THAN SIX FEET (6') MAY BE COMPACTED IN TWENTY-FOUR INCH (24") LIFTS, UP TO THE TOP SIX-FOOT (6') ZONE. ALL TRENCH BACKFILL SHALL BE FIRM AND UNYIELDING BUT IN NO CASE SHALL BE COMPACTED TO MORE THAN NINETY-TWO PERCENT (92%) OF MAXIMUM DENSITY IN PERMEABLE PAVEMENT AREAS. f.ALL COMPACTION SHALL BE PERFORMED BY MECHANICAL METHODS. THE COMPACTION TESTS MAY BE PERFORMED IN FOUR-FOOT (4') VERTICAL INCREMENTS MAXIMUM. THE TEST RESULTS SHALL BE GIVEN TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO PAVING. THE NUMBER AND LOCATION OF TESTS REQUIRED SHALL BE DETERMINED BY THE ENGINEER. d.TEMPORARY RESTORATION OF TRENCHES FOR OVERNIGHT USE SHALL BE ACCOMPLISHED BY USING MC MIX (COLD MIX), ASPHALT TREATED BASE (ATB), OR STEEL PLATES, AS APPROVED BY THE ENGINEER. ATB USED FOR TEMPORARY RESTORATION MAY BE DUMPED DIRECTLY INTO THE TRENCH, BLADED OUT AND ROLLED. AFTER ROLLING, THE TRENCH MUST BE FILLED FLUSH WITH ASPHALT TO PROVIDE A SMOOTH RIDING SURFACE. IF THE TEMPORARY TRENCH RESTORATION DOES NOT HOLD UP, THE CONTRACTOR SHALL REPAIR THE PATCH WITHIN EIGHT HOURS OF BEING NOTIFIED OF THE PROBLEM BY THE CITY. THIS REQUIREMENT APPLIES 24 HOURS PER DAY, SEVEN DAYS PER WEEK. IN THE EVENT THAT THE CITY DETERMINES TO REPAIR THE TEMPORARY PATCH, THE CONTRACTOR SHALL REIMBURSE THE CITY IN AN AMOUNT THAT IS DOUBLE THE CITY'S COSTS IN REPAIRING THE PATCH, WITH THE SECOND HALF OF THE REIMBURSEMENT TO REPRESENT CITY OVERHEAD AND HIDDEN COSTS. e.ASPHALT CONCRETE CLASS E OR CLASS B SHALL BE PLACED TO THE COMPACTED DEPTH AS REQUIRED AND INDICATED ON CITY OF RENTON STANDARD PLANS OR AS DIRECTED BY THE ENGINEER. THE GRADE OF ASPHALT SHALL BE AR-4000W. THE MATERIALS SHALL BE MADE IN CONFORMANCE WITH SECTION 9-02.1(4) OF THE STANDARD SPECIFICATIONS. f.TACK COAT SHALL BE APPLIED TO THE EXISTING PAVEMENT AT EDGE OF SAW CUTS AND SHALL BE EMULSIFIED ASPHALT GRADE CSS-1, AS SPECIFIED IN SECTION 9-02.1(6) OF THE STANDARD SPECIFICATIONS. TACK SHALL BE APPLIED AS SPECIFIED IN SECTION 5-04 OF THE STANDARD SPECIFICATIONS. g.ASPHALT CONCRETE CLASS E OR CLASS B SHALL BE PLACED IN ACCORDANCE WITH SECTION 5-04 OF THE STANDARD SPECIFICATIONS; EXCEPT THOSE LONGITUDINAL JOINTS BETWEEN SUCCESSIVE LAYERS OF ASPHALT CONCRETE SHALL BE DISPLACED LATERALLY A MINIMUM OF TWELVE INCHES (12"), UNLESS OTHERWISE APPROVED BY THE ENGINEER. FINE AND COARSE AGGREGATE SHALL BE IN ACCORDANCE WITH SECTION 9-03.8 OF THE STANDARD SPECIFICATIONS. ALL STREET SURFACES, WALKS OR DRIVEWAYS WITHIN THE STREET TRENCHING AREAS SHALL BE FEATHERED AND SHIMMED TO AN EXTENT THAT PROVIDES A SMOOTH-RIDING CONNECTION AND EXPEDITIOUS DRAINAGE FLOW FOR THE NEWLY PAVED SURFACE. FEATHERING AND SHIMMING SHALL NOT DECREASE THE MINIMUM VERTICAL CURB DEPTH BELOW FOUR INCHES (4") FOR STORM WATER FLOW. THE ENGINEER MAY REQUIRE ADDITIONAL GRINDING TO INCREASE THE CURB DEPTH AVAILABLE FOR STORM WATER FLOW IN AREAS THAT ARE INADEQUATE. SHIMMING AND FEATHERING AS REQUIRED BY THE ENGINEER SHALL BE ACCOMPLISHED BY RAKING OUT THE OVERSIZED AGGREGATES FROM THE CLASS B MIX AS APPROPRIATE. SURFACE SMOOTHNESS SHALL BE PER SECTION 5-04.3(13) OF THE STANDARD SPECIFICATIONS. THE PAVING SHALL BE CORRECTED BY REMOVAL AND REPAVING OF THE TRENCH ONLY. ASPHALT PATCH DEPTHS WILL VARY BASED UPON THE STREETS BEING TRENCHED. THE ACTUAL DEPTHS OF ASPHALT AND THE WORK TO BE PERFORMED SHALL BE AS REQUIRED AND INDICATED ON CITY OF RENTON STANDARD PLANS. COMPACTION OF ALL LIFTS OF ASPHALT SHALL BE A MINIMUM NINETY-TWO PERCENT (92%) OF DENSITY AS DETERMINED BY WSDOT TEST METHOD 705. THE NUMBER OF TESTS REQUIRED SHALL BE DETERMINED BY THE ENGINEER. TESTING SHALL BE PERFORMED BY AN INDEPENDENT TESTING LAB WITH THE RESULTS BEING SUPPLIED TO THE ENGINEER. TESTING IS NOT INTENDED TO RELIEVE THE CONTRACTOR FROM ANY LIABILITY FOR THE TRENCH RESTORATION. IT IS INTENDED TO SHOW THE INSPECTOR, AND THE CITY, THAT THE RESTORATION MEETS THESE SPECIFICATIONS. h.ALL JOINTS, EXCEPT THOSE ASSOCIATED WITH PERMEABLE PAVEMENT, SHALL BE SEALED USING PAVING ASPHALT AR- 4000W. i.WHEN TRENCHING WITHIN THE UNPAVED ROADWAY SHOULDER(S), THE SHOULDER SHALL BE RESTORED TO ITS ORIGINAL CONDITION, OR BETTER. j.THE FINAL PATCH SHALL BE COMPLETED AS SOON AS POSSIBLE AND SHALL NOT EXCEED FIFTEEN (15) WORKING DAYS AFTER FIRST OPENING THE TRENCH. THIS TIME FRAME MAY BE ADJUSTED IF DELAYS ARE DUE TO INCLEMENT PAVING WEATHER OR OTHER ADVERSE CONDITIONS THAT MAY EXIST. HOWEVER, DELAYING OF FINAL PATCH OR OVERLAY WORK IS SUBJECT TO THE ENGINEER'S APPROVAL. THE ENGINEER MAY DEEM IT NECESSARY TO COMPLETE THE WORK WITHIN THE FIFTEEN (15) WORKING DAY TIME FRAME AND NOT ALLOW ANY TIME EXTENSION. SHOULD THIS OCCUR, THE CONTRACTOR SHALL PERFORM THE NECESSARY WORK, AS DIRECTED BY THE ENGINEER. k.A CITY OF RENTON TEMPORARY TRAFFIC CONTROL PLAN (FROM RENTON TRANSPORTATION ENGINEERING) SHALL BE SUBMITTED AND APPROVED BY THE ENGINEER A MINIMUM OF THREE (3) WORKING DAYS PRIOR TO COMMENCEMENT OF WORK. 6.REMOVAL OF UTILITY LOCATE MARKINGS FROM SIDEWALKS REQUIRED: THE PERMITTEE WILL BE REQUIRED TO REMOVE UTILITY LOCATE MARKS ON SIDEWALKS ONLY WITHIN THE CENTER DOWNTOWN ZONE. THE PERMITTEE SHALL REMOVE THE UTILITY LOCATE MARKS WITHIN 14 DAYS OF JOB COMPLETION. MFP21004111 OLYMPIC PIPE LINE COMPANY LLC A A P:\0\0894126\CAD\48\OPLC 12RS Casing Maintenance Site\12RS Casing Maintenance Site-A_7-7.dwg TAB:S07 Date Exported: 08/16/21 - 11:02 by syiREFERENCE: CITY OF RENTON - DETAILS FROM PUBLIC WORKS DEPARTMENT.MFP21004111