HomeMy WebLinkAboutAdden 1AMENDMENT NO. 1 TO AGREEMENT FOR SERVICES DURING CONSTRUCTION THIS AMENDMENT, dated for reference purposes only as August 31, 2021 , is by and between the City of Renton (the “City”), a Washington municipal corporation, and Murraysmith Consultant”), a corporation. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-21-011, dated January 13, 2021, to provide necessary services for the Downtown Utilities Improvement Project referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work and change the compensation in order to provide additional engineering and archaeological services. NOW THEREFORE, It is mutually agreed upon that CAG-21-011 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to increase the amount of effort required to provide engineering and archaeological services as specified in Exhibit A-1, which is attached and incorporated herein. 2. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $177,686 from $1,597,678 to 1,775,364, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B-1 which is attached and incorporated herein. 3. All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E CAG-21-011. Adden #1-21 PAGE 2 OF 2 CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Armondo Pavone Mayor Adam Schuyler, PE Principal Engineer Date Date Attest Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Maloney City Attorney Contract Template Updated 06/17/2021 DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E 9/23/2021 | 12: 14 PM PDT9-27-2021 Approved by Cheryl Beyer via 8/27/2021 email City of Renton MURRAYSMITH DUIP – Phase 4 – Amendment 1 August 2021 1 H:\EVT_Projects\21\3023 - Renton - DUIP SDC\PM\Amendments\Amendment 1 Scope 072621.docx EXHIBIT A-1 AMENDMENT 1 SCOPE OF SERVICES DOWNTOWN UTILITY IMPROVEMENT PROJECT – PHASE 4: CONSTRUCTION MANAGEMENT SCOPE OF SERVICES CHANGES CITY OF RENTON Statement of Understanding Under the Agreement for the Downtown Utility Improvements Project (DUIP), Phase 4 Construction Management Services CAG-21-011 dated January 11, 2021, between the City of Renton (City) and Murraysmith, Inc. (Consultant), the Consultant is tasked for construction management and engineering services during construction of the Downtown Utility Improvements Project. This Scope of Services for Amendment 1 is based on our understanding of the changes in the scope of services approved by the City via email or phone calls from the beginning of the contract to the present time. Work described herein began as directed by the City and with the understanding that the project budget may have capacity to accommodate some changes in scope. However, as the project has progressed, a contract amendment is required to provide adequate and ongoing services to the project. In general, Amendment 1 includes scope modifications for: Design Services During Construction: Additional effort to provide engineering services during construction, e.g., submittal reviews, RFI reviews, and design revisions, was required due to additional scope of services requests. Therefore, additional budget is requested. Cultural Resources: Additional effort has been required by the cultural resources consultant to assist the City in meeting permit obligations. Additional monitoring is required based on the discovery of more intact native sediments than were anticipated during the design phase. DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E City of Renton MURRAYSMITH DUIP – Phase 4 – Amendment 1 August 2021 2 H:\EVT_Projects\21\3023 - Renton - DUIP SDC\PM\Amendments\Amendment 1 Scope 072621.docx Scope of Services The Amendment 1 Scope of Services includes additions to existing tasks. The original Scope of Services tasks, subtasks, deliverables, City responsibilities, and assumptions are still valid unless modified herein. Task 1 - Project Management Subtasks 1.1 Project Kick-off meeting – No change. 1.2 Monthly Project Status Reports – No change. 1.3 Coordination with City – No change. 1.4 Consultant Team Coordination and Safety Plan (Modified) - Additional coordination with cultural resources consultant due to five additional months of monitoring. Deliverables No change. Assumptions No change. Task 2 – Construction Management Services No change to the budget, however, there have been changes to the scope of work. Subtasks 2.1 Construction Management and Administration – No change. 2.2 Supplemental Construction Inspection (As Needed) (Modified) – Additional staff time per City request. 2.3 Project Closeout & Contract Record Drawings – No change. Deliverables No change. DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E City of Renton MURRAYSMITH DUIP – Phase 4 – Amendment 1 August 2021 3 H:\EVT_Projects\21\3023 - Renton - DUIP SDC\PM\Amendments\Amendment 1 Scope 072621.docx Assumptions The following assumptions supersede any conflicting assumptions in the original Scope of Services: Construction period is assumed to be completed in August 2022. Consultant primary inspector to provide 60 hours per week and supplemental inspector to provide 20 hours per week for June – September 2021. Primary inspector to provide 40 hours per week October 2021 through September 2022. Total monthly pay estimates to correspond with finishing in September 2022. Consultant and City to coordinate level and effort and budget as the project advances. Due to anticipated construction schedule completing in a shorter duration than originally assumed, current assumption is that additional staff time for Task 2.2 can be completed within original level of effort. If construction schedule changes, additional compensation may be requested. Task 3 – Design Services During Construction (Modified) Additional scope of services for the design services during construction are as follows. Subtasks 3.1 Design Team Site Visits – No change 3.2 Construction Support (Modified) – The scope and fee is modified to include additional effort already expended on the project (i.e. redesign of storm and water facilities on S 2nd Street), and to provide scope and budget for future unforeseen services. Deliverables No change. Assumptions Additional assumptions are as follows: To avoid the need for future amendments, $42,000 is included to allow for coordination and design effort for unforeseen conditions and/or construction challenges over the remaining project duration. DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E City of Renton MURRAYSMITH DUIP – Phase 4 – Amendment 1 August 2021 4 H:\EVT_Projects\21\3023 - Renton - DUIP SDC\PM\Amendments\Amendment 1 Scope 072621.docx Task 4 – Public Involvement No change Task 5 – Cultural Resources (ERCI) The cultural resources scope requires amendment due to: Assisting the City in preparing an archaeological permit application for work inside and adjacent to recorded archaeological sites and the associated coordination with tribes and DAHP. Five additional months of monitoring. Additional detail regarding the scope and budget required for Cultural Resources is included as Attachment A. Task 6 – Materials Testing & Geotechnical No change Task 7 – Structural No change Task 8 – Cathodic Protection No change Schedule No Change Attachments A – ERCI Proposal DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E Washington WBE/DBE Certified 1229 Cleveland Avenue Mount Vernon, Washington 98273 Telephone 360-826-4930 Fax 360-826-4830 www.equinoxerci.com July 21, 2021 Ty Tadano, PE Murraysmith 520 Pike Street, Suite 1350, Seattle, WA 98101 P 206.462.7030 Ty.Tadano@murraysmith.us Re: Amendment for Archaeological Construction Monitoring and Reporting, Renton Downtown Utility Improvement Project, Washington Ty Tadano: Thank you for selecting Equinox Research and Consulting International Inc. (ERCI) for your archaeological construction monitoring needs for the City of Renton’s Downtown Utility Improvement Project. ERCI provides a full-service cultural resource management program and we look forward to providing you timely and professional fieldwork and reporting. As part of the ongoing archaeological monitoring and tribal coordination we are submitting this scope and budget for the additional work in support of this project. Scope items: Complete DAHP Permit Application and provide coordination with tribes 5 months of additional archaeological monitoring in areas with intact sediment profiles that were not originally accounted for in the monitoring plan. Task Deliverables: Draft and Final Archaeological Monitoring Report and weekly email reports to the stakeholders Assumptions: The following costs are not included in our proposal: Costs associated with encountering human remains. Costs associated with any mitigation should an archaeological site be encountered and not be avoided Costs associated with filling out Historic Property Inventory Forms for any historic buildings that will be affected by this project. Costs associated with the additional plan or permit writing required for your project. Thank you for the opportunity to provide cultural resources services for your project, and we look forward to working with you. Regards, Kelly R. Bush Equinox Research and Consulting International Inc. (ERCI) ATTACHMENTADocuSignEnvelopeID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E Equinox Research and Consulting International Inc. (ERCI) Phone: 360-826-4930 Fax: 360-826-4830 Email: kelrbush@equinoxerci.com Website: www.equinoxerci.com 2 Planning, Management, and Writing Description job classification Hours Rate Cost Project orientation, meetings, review of documents, and project management Principal Investigator 10.00 139.87 1,398.70 Coordinating with governments of affected Tribes Principal Investigator 20.00 139.87 2,797.40 Considering project alternatives Principal Investigator 10.00 139.87 1,398.70 Consultation with SHPO and agencies Principal Investigator 12.00 139.87 1,678.44 Write permit application Archaeologist 8.00 83.92 671.36 Report editing Principal Investigator 0.00 139.87 0.00 Archaeological Site Form writing Archaeologist 0.00 83.92 0.00 Site form update preparation Arch Tech 6.00 68.38 410.28 Archival background research Archaeologist 6.00 83.92 503.52 GIS, Graphics, layout Arch Tech 4.00 68.38 273.52 Document control, transcriptions, site forms, research Arch Tech 16.00 68.38 1,094.08 Total $10,226.00 Report Writing Description Hours Rate Cost Monthly reports Principal Investigator 30.00 139.87 4,196.10 Weekly reports Archaeologist 30.00 83.92 2,517.60 Final Monitoring report Senior Archaeologist 20.00 99.46 1,989.20 Final Monitoring report Archaeologist 30.00 83.92 2,517.60 Graphics, layout Archaeologist 15.00 83.92 1,258.80 Subtotal $5,765.60 Archaeological Construction Monitoring Description Units Rate Cost 1-4 hr visit per month) Principal Investigator 20.00 139.87 2797.40 8 hr daily rate includes travel Senior Archaeologist 10.00 825.00 8250.00 8 hr daily rate includes travel Archaeologist 30.00 725.00 21750.00 8 hr daily rate includes travel Archaeological Field Technician 30.00 625.00 18750.00 partial days Senior Archaeologist - hourly 10.00 99.46 994.60 ATTACHMENTADocuSignEnvelopeID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E Equinox Research and Consulting International Inc. (ERCI) Phone: 360-826-4930 Fax: 360-826-4830 Email: kelrbush@equinoxerci.com Website: www.equinoxerci.com 3 partial days Archaeologist - hourly 60.00 83.92 5,035.20 partial days Arch Technician - hourly 60.00 68.38 4102.80 Transcription of field notes Arch Technician - hourly 110.00 68.38 7521.80 Travel (1 hours R/T) 85 45 3825.00 Subtotal $61,979.40 Indirect Costs Description Units Rate Cost Mileage (100 miles R/T) Construction Monitoring 12600.00 0.575 7245.00 Mileage (100 miles R/T) On call 1000.00 0.575 575.00 Total $7,820.00 GRAND TOTAL $85,791.00 ATTACHMENTADocuSignEnvelopeID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E Exhibit B-1 ESTIMATED FEES Discipline Breakdown Principal Engineer VI Principal Engineer I Construction Manager V Construction Manager IV Technician I Professional Engineer III Administrative III Technician IV Hours Direct Labor Loaded Labor Total Schuyler, A Tadano Schuyler, C Warren, M Warren, E Moss Scharback Williams, B Fee Fee 20%50%30% 99.08 $69.59 $61.59 $56.18 $26.25 $40.58 $47.96 $37.17 Task 1 - Project Management Subtask 1.1 - Kick Off Meeting 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 1.2 - Monthly Project Status Reports 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 1.3 - Coordination with the City 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 1.4 - Consultant Team Coordination 10 10 696$ 2,280$ -$ -$ 2,280$ 456$ 1,140$ 684$ Task 1 Subtotal 0 10 0 0 0 0 10 696$ 2,280$ -$ -$ -$ -$ -$ -$ -$ -$ 2,280$ 456$ 1,140$ 684$ Task 2 - Construction Management Services Subtask 2.1 - Construction Management and Administration 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 2.2 - Supplemental Construction Inspection 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 2.3 - Project Closeout & Contract Record Drawings 0 -$ -$ -$ -$ -$ -$ -$ -$ Task 2 Subtotal 0 0 0 0 0 0 0 0 0 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Task 3 - Design Services During Construction Subtask 3.1 - Design Team Site Visits 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 3.2 - Construction Support 8 152 0 0 0 285 0 16 461 23,531$ 77,099$ -$ 288$ 77,387$ 15,477$ 38,694$ 23,216$ Task 3 Subtotal 8 152 0 0 0 285 0 16 461 23,531$ 77,099$ -$ -$ -$ -$ -$ -$ -$ 288$ 77,387$ 15,477$ 38,694$ 23,216$ Task 4 - Public Involvement -$ Subtask 4.1 - Public Involvement 0 -$ -$ -$ -$ -$ -$ -$ -$ Task 4 Subtotal 0 0 0 0 0 0 0 0 0 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Task 5 - Cultural Resources Subtask 5.1 - Cultural Resources 16 16 1,113$ 3,648$ 94,370$ 94,370$ -$ 98,018$ 19,604$ 49,009$ 29,406$ Task 5 Subtotal 0 16 0 0 0 0 0 0 16 1,113$ 3,648$ -$ 94,370$ -$ -$ -$ -$ 94,370$ -$ 98,018$ 19,604$ 49,009$ 29,406$ Task 6 - Materials Testing and Geotechnical -$ Subtask 6.1 - Geotechnical Engineering Support 0 -$ -$ -$ -$ -$ -$ -$ -$ Subtask 6.2 - Materials Testing and Lab 0 -$ -$ -$ -$ -$ -$ -$ -$ Task 6 Subtotal 0 0 0 0 0 0 0 0 0 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Task 7 - Structural Engineering -$ Subtask 7.1 - Structrual Construction Support 0 -$ -$ -$ -$ -$ -$ -$ -$ Task 7 Subtotal 0 0 0 0 0 0 0 0 0 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Task 8 - Cathodic Protection -$ Subtask 8.1 - Cathodic Protection Support 0 -$ -$ -$ -$ -$ -$ -$ -$ Task 8 Subtotal 0 0 0 0 0 0 0 0 0 -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ TOTAL - ALL TASKS 8 178 0 0 0 285 0 16 487 25,340$ 83,028$ -$ 94,370$ -$ -$ -$ -$ 94,370$ 288$ 177,686$ 35,537$ 88,843$ 53,306$ Direct Salary Cost (DSC)25,340$ Overhead Cost 192.55%48,792$ Subtotal (DSC + Overhead)74,132$ Net Fee 12%8,896$ Subconsultants 94,370$ Direct Non-Salary Costs 288$ Grand Total 177,686$ Storm CITY OF RENTON DOWNTOWN UTILITY IMPROVEMENT PROJECT PHASE 4: CONSTRUCTION MANAGEMENT SERVICES AMENDMENT 1 FEE ESTIMATE LABOR CLASSIFICATION (HOURS) Subconsultants Expenses Water Sewer EnviroIssues ERCI Kleinfelder CG Eng.NW Corr.KPG, Inc Subconsultant Total CITY OF RENTON JULY 2021 H:\EVT_Projects\21\3023 - Renton - DUIP SDC\PM\Amendments\COR Phase 4 CM Amendment 1 Fee Murraysmith, Inc. DUIP PHASE 4: CONSTRUCTION MANAGEMENT AMENDMENT 1 Page 1 DocuSign Envelope ID: F76BF02E-FEF9-416D-A495-6C08DDCCC74E