HomeMy WebLinkAboutMFP21003966.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21003966 IVR Number: 21003966 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:08/17/2021Application Date:0423059142Parcel Number: 2611 UNION AVE NE Permit Type:09/29/2021Issue Date:Franchise Permit Work Class:09/29/2022Expiration Date:Major Utility Job Number: 101140385Franchise Type:Electric Description: Puget Sound Energy Electric RUCK TO BE SET AT P01, P1A, P02, P2A, J01, V01, P05, V02, P4A AND P04. SOUTH BOUND LANE OF UNION AVE TO BE CLOSED TO WIRE REMOVAL X PULL, EAST BOUND LANE OF NE 27TH PL TO BE CLOSED FOR RE PULL TO V02. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL PULTE HOME OF WASHINGTON IN 3535 FACTORIA BLVD SE STE 110 BELLEVUE , WA 98006 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101140385 2611 Union Ave NE Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 Lee Brown Lee.Brown@PSE.com 6905 S. 228TH ST KENT, WA 98032 MFP21003966 Scott Warlick CED 9/29/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG P01 P1A P02 P2A RIGHTKEEPR4-7BRIGHT KEEP R4-7BW1-4LROADWORKAHEADW20-1200'200'200'CENTER LANE CLOSED AHEAD W9-3ROAD WORK AHEAD W20-1200'200'CENTER LANECLOSEDAHEADW9-311 11 18 14 12 1616NE 25TH PL UNION AVE NERESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKINGNO-PAR K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/04/2021 101140385 0 2611 Union Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 1 OF 5 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21003966 P03 J01 V01 W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'ROADWORKAHEADW20-1161610 10 10 13 UNION AVE NENE 27TH PL STOP FLAGGER STOP FLAGGER RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 000 0000 NO PARKINGNO-PA RK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP VAULTVault WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/04/2021 101140385 0 2611 Union Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 2 OF 5 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21003966 P05 W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'ROADWORKAHEADW20-1161610 10 10 13 UNION AVE NENE 27TH PL STOP FLAGGER STOP FLAGGER RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 000 0000 NO PARKINGNO-PA RK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/04/2021 101140385 0 2611 Union Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 3 OF 5 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21003966 NE 27TH PLV021010101016 16 UNION AVE NE S/WCLOSEDR9-9S/W CLOSEDR9-9W20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROADAHEAD100'100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4200'200'200'STOPFLAGGER STOPFLAGGER STOP FLAGGERRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK THE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREATEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.mNProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV08/04/2021 10114038502611 Union Ave NE, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com4 OF 5Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP21003966 P4A P04 ROADWORKAHEADW20-11616NE 27TH PL STOP FLAGGER STOP FLAGGER W20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'10 10 UNION AVE NE10 10 RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999 INFRASOURCE LLC 000 00000 00 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/04/2021 101140385 0 2611 Union Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 5 OF 5 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21003966 42°' N Vicinity Map 47.5163, -122.1646 Owner / Developer Contact Info officeATTN: PULTE HOMES OF WASHINGTON, INC 3535 FACTORIA BLVD SE, STE 600 BELLEVUE, WA 98006 Lance Adams 206.406.6059 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PHONE CABLE TV 511440209 101140385 N/A 101135322 N/A 108125639 N/A 583065874 N/A 593229143 N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Relocate Removal OH XFMR OH Wire UG Svc 13611 #Shop OH Light 13633 N/A N/A 101140385.DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP LEE BROWN 425.417.8620 4.01.21 A. DUNN 206.437.9150 7.21.21 ... J.COSSETTE 206.584.4408 6.13.21 REDT # ( RW-112327 )RENTON/ KING COUNTY FOREST TERRACE SCH 73 SCHEDULE 73 OH-UG CONVERSION - 2 SPANS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY .. .101140385 AS SHOWN 1 OF 5 KING N/A N/A QCSOKE NE 4-T23N-R05E N/A N/A 2305E013 2305E040 2305E013 PRE-14 COMCAST JAMES COHN 253.569.0636 CENTURYLINK KENNETH LUU 206.346.0144 RENTON SCHOOL DIST. JAY GRAY 253.226.8314 PSE RIGHT OF WAY AMBER YANG 425.456.2774 E-Mail: Cell Phone: Project Manager Contact Information: Manager:LEE BROWN 425.417.8620 lee.brown@pse.com x x ... ... ... xx lance.adams@pultegroup.com SITE FOREST TERRACE SCHEDULE 73 OH TO UG CONVERSION & ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS. EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES EROSION & SEDIMENT CONTROL REQUIREMENTS STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION GENERAL 1. Pre-construction Notify appropriate City or County 48 to 72 hours or as required by permitting agency before starting work on any right-of-way involving a permit. Follow all requirements as outlined by the permitting agency. Locate and mark all underground utilities prior to start of construction. If there is a conflict with the intended trench route as shown on the site plan and existing utilities or obstructions, trench route may need to be moved to opposite side of street. Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County authorities during Pre-construction meeting will determine the final trench route. 2. Existing Utilities Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. In the event of damage to an underground utility, notify Puget Sound Energy at once. Contractor agrees to make work force and resources available at once to Puget Sound Energy or municipal authorities to repair damage at no cost. 3. Work Drawings Maintain on site, in good condition, a complete file of all work drawings. These drawings shall be available at all times to a Puget Sound Energy representative. Corrections and changes made during the job shall be recorded continuously on these drawings. All underground electrical facilities shall have a minimum of 36 inches of cover. Any change must be approved by the PSE engineer or project manager. Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the end of the job. 4. Safety Provide signs, barricades, and traffic control in conformance with local jurisdictions and regulations. Provide flagging and or other vehicle traffic control as needed in conformance with local regulations. (see SPM # 100.4000) Provide adequate signage and protection to traffic during non-working hours. Maintain traffic flow as required by permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and bicycles. Install warning barricades at least every 50 feet along the trench route from the time the trench is opened until the trenching is complete. 5. Existing Systems Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by Puget Sound Energy's representative. Provide temporary wiring and connections to maintain existing systems in service during construction; if a scheduled outage is not possible. When work must be performed on energized equipment or circuits, use qualified personnel for such operations. EARTHWORK See Puget Sound Energy SPM 6800.4050 1. Back hoe, Hand Dug Excavations Paved Surfaces Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow off the edge of paved surface far enough to minimize asphalt disturbance. Repair any blow out areas (where edge has been broken) by sawing. The depth of the trench shall be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF) cover or select fill (5/8" minus) to meet permit requirements. Unpaved Surfaces Conduit/cable trenches are to be excavated just off the existing road edge or in the shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with the narrowest width bucket practical or plow. Trench shall be deep enough to allow a minimum of 36" of cover over the top most cable. All ditch crossings shall have a minimum of 36" cover from the lowest point within the existing ditch line. Culverts; when installing facilities under a culvert, excavation must be filled with packed crush rock. If any culvert is damaged it will be repaired or replaced in accordance with permitting agency and contractors responsibility. Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes become the property of the contractor immediately upon removal. Remove spoils and wastes promptly to an approved disposal site. Remove spoils containing asphalt or concrete to a disposal site specifically approved for such materials. Provide Puget Sound Energy with a disposal receipt for all spoils. 2. Backfill Unpaved Road Surfaces Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted to 95% density. Backfill for unpaved road sections shall consist of native material compacted to 95% density. At the end of each workday, backfill or plate all trench, remove all spoils and clean roadway surface of large hazardous debris. 3. Surface Restoration Unpaved Surfaces Restore ground surface to original contour. Restore to original condition or better. 4. Landscaping Arrange and perform work to minimize impact to existing landscaping. Restore landscaping that has been disturbed during the course of work, including seeding of banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to avoid sloughing. Leave area in its original state or better at the end of construction. Hand dig if required to prevent damage to tree roots. ELECTRICAL 1. Conduit Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC DB120 direct burial. Maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Bends shall be made with as long a radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the 4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10' minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and cap conduit to prevent the entry of dirt and moisture. Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs, cut the conduit ahead of kink and splice to new conduit to continue run. 2. Underground Primary Cable Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run with each 3 phase circuit of 750 MCM. Install cable into existing or new conduit systems using approved installation equipment. Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be equipped with instrumentation to continually monitor and record peak tension encountered during a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy. Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations. Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy approved lubricant to cable continually during pulling to reduce pulling tension and to permit future removal. Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment and prevent un-necessary damage to sidewalks. Train and coil cables in vaults as required to form a smooth transition from conduit to termination. if terminations are to be performed by others, coil 15' of cable in vault and cap end. 3. Terminations and Splices Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115- 5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317. Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076. 4. Concrete Vaults Excavate, install base material, and compact base material in accordance with Puget Sound Energy SPM 6775.0040. Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road elevation. Install hillholders as required on sketch or by construction notes. 5. Grounding Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2 copper jumper or to Concentric neutral at each splice vault location. Minimum grounding requirement is 4 grounds per mile. 6. Existing Underground Primary Cable (if applicable) Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall. Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as required by permitting agency. 7. Traffic Control All traffic control to comply with current specifications in M.U.T.C.D. GENERAL OVERHEAD NOTES: 1. Poles, conductors, devices to be installed per PSE Standards & Specifications. 2. Poles are to be installed or relocated as staked. 3. All new poles set shall be the class indicated on the sketch or better. 4. Install ground plate assembly on all new poles. 5. Install grid numbers on all new and existing poles as shown on sketch. 6. Treat all field-drilled poles with copper Naphthenate wood preservative. 7. Customer/Developer to coordinate between utilities. 8. All new and relocated poles -locations- to be approved by King Co. OVERHEAD CIRCUIT MAP - EXISTING (2305E040) SCALE: 6" = 1 MILE EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER J-BOX NEW TRENCH LINE EXISTING 3Ø WIRE EXISTING CENTER LINE CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXISTING 1Ø WIRE EXISTING RIGHT OF WAY PULL VAULT EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED STREETLIGHT NEW POLE NEW PADMOUNT TRANSFORMER EXISTING PADMOUNT TRANSFORMER NEW HANDHOLE P ELECTRIC SYMBOLS LEGEND SITE NOTE: DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARDSURACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED). This permit is for Major construction work in the ROW and will be billed at an additional $60/HR for inspections. After hours and weekend work will be billed at $125/HR MFP21003966 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP LEE BROWN 425.417.8620 4.01.21 A. DUNN 206.437.9150 7.21.21 ... J.COSSETTE 206.584.4408 6.13.21 REDT # ( RW-112327 )RENTON/ KING COUNTY FOREST TERRACE SCH 73 SCHEDULE 73 OH-UG CONVERSION - 2 SPANS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY .. .101140385 AS SHOWN 2 OF 5 KING N/A N/A QCSOKE NE 4-T23N-R05E N/A N/A 2305E013 2305E040 2305E013 PRE-14 COMCAST JAMES COHN 253.569.0636 CENTURYLINK KENNETH LUU 206.346.0144 RENTON SCHOOL DIST. JAY GRAY 253.226.8314 PSE RIGHT OF WAY AMBER YANG 425.456.2774 ... ... ... UNIVERSAL MAP - EXISTING (2305E013) SCALE: 1:50 SCALE: 1:100 UNDERGROUND CIRCUIT MAP - EXISTING (2305E013) JOB SITE JOB SITE MFP21003966 UNION AVE NEUNION AVE NENE 27TH PL TRANSFER TRANSFER RE-PULL 1Ø 1/O 40.5'30' 25' 25' 27' 27' NE 27TH P L 10.5' ROW DEDICATION 10.5' ROW DEDICATION FEEDPRE14ABCN336.4ACSR336.4ACSRC4/OACSRABCN 4/OACSRTRANSFER 4/OACSRABCN ABCN #2ACSR ABCN 4/OACSRC#4ACSR 'A''B' 'C''D' 'E' TRANSFER 25.0' 5.0' 5.0' 40.5'30' 2.0' 8.0' 0.5'New R.O.W.New R.O.W.R.O.W.R.O.W.C/LC/L5.0' 2-2" Sch.80 1-6" Sch.80 1-4" Sch.801-3" Sch.80 2-3" Sch.80 1-4" Sch.80 1-6" Sch.80 10.5' ROW DEDICATION UNION AVE NEEASEMENTEASEMENTUNION AVE NETHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP LEE BROWN 425.417.8620 4.01.21 A. DUNN 206.437.9150 7.21.21 ... J.COSSETTE 206.584.4408 6.13.21 REDT # ( RW-112327 )RENTON/ KING COUNTY FOREST TERRACE SCH 73 SCHEDULE 73 OH-UG CONVERSION - 2 SPANS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY .. .101140385 AS SHOWN 3 OF 5 KING N/A N/A QCSOKE NE 4-T23N-R05E N/A N/A 2305E013 2305E040 2305E013 PRE-14 COMCAST JAMES COHN 253.569.0636 CENTURYLINK KENNETH LUU 206.346.0144 RENTON SCHOOL DIST. JAY GRAY 253.226.8314 PSE RIGHT OF WAY AMBER YANG 425.456.2774 ... ... ... CIRCUIT FEET REMOVED:486' CIRCUIT FEET ADDED: 455' 1"=50' SITE PLAN SITE SPECIFIC NOTES AT P01 (319075-167131) 1986 CL1 - 40' -TRANSFER 3Ø 4/O ACSR OH FEEDER & NEUTRAL (N&S) TO P1A -REMOVE OH SEC TPX (N&S) -TRANSFER EX 50kVA OH TRF TO P1A -REMOVE ALL PSE FACILITIES & TOP POLE 1' ABOVE COMM -COMM TO TRANSFER TO P1A -REMOVE POLE (2ND TRIP) AT P1A (NEW) -INSTALL NEW 45FT CLASS 1 POLE (PD451) 6010.1000 PER STAKED LOCATION -INSTALL EXISTING 3Ø TERM ON NEW 3Ø TANGENT FIBERGLASS 2 ACSR ARM (TANC312) 6033.2010 -INSTALL EXISTING 50kVA OH TRF FROM P01 -TRANSFER 3Ø 4/O ACSR OH FEEDER &-ADD AMR 54404 -INSTALL GRID #319068-167131 AT P02 (319092-167131) 1969 CL1 - 40' -DISCONNECT OH SEC TPX TO 2616 & TRANSFER TO P05 -REMOVE OH SEC TPX TO 2611 -REMOVE POLE AND ALL PSE EQUIPMENT AT P2A (NEW) -INSTALL NEW 50FT CLASS H1 POLE (PD50H1) 6010.1000 PER STAKED LOCATION -INSTALL 200A/600A 3Ø DBL TERM (TSU6D31) ON NEW 3Ø TANGENT FIBERGLASS 339 AAC ARM (TANC313) 6033.2012 -INSTALL (3) STIRRUPS (2254100) -INSTALL (1) NEW 6" FEEDER RISER ON NEW STNADOFF BRACKETS (RIS6CSS) 6042.1000 -INSTALL (1) NEW 4" PRI RISER ON NEW STANDOFF BRACKETS (RIS4CSS) 60421000 -INSTALL NEW GRID#319081-167131 AT P03 (319112-167131) 1961 CL1 - 40' -REMOVE UG SEC TPX - SPLICE TO RE-FEED FROM V01 (SPL10J) 6041.2000 -REMOVE OH 1Ø 2" PRIMARY UP TO IP1 -REMOVE 25kVA OH TRF -REMOVE AMR UNIT 54404 -REMOVE 40T SOLID BLADE SWITCH -REMOVE POLE AND ALL PSE EQUIPMENT Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (OH) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 50kVA 120/240v 6211350 P1A 319068-167131 1"=10' SITE DETAIL 'A' SITE DETAIL 'A' Developer Note: The following Fault Current information MUST BE conveyed to the builder of the units: All units may require upgraded house electrical equipment as the fault current at the meter base may exceed 10,000 amps. FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 75KVA 0.5 2.30 36,200 1.80 23,100 DEVELOPER TO COORDINATE WITH PSE PROJECT MANGER & SERVICE PROVIDER PRIOR TO EXCAVATING WITHIN 3' OF LOCATE MARKS OF PSE ENERGIZED FACILITIES SPAN NOTES P01 TO P1A -REMOVE ± 25' 4/0 ACSR AS NEEDED REMOVED ( ') 4/0 ACSR -TRANSFER EX OH 4/0 ACSR TO NEW P1A P01 TO P02 -REMOVE ± 145' OH TPX SEC AS NEEDED REMOVED ( ') OH TPX SEC -TRANSFER EX 4/0 ACSR SVC TO NEW P2A P02 TO 2616 -REMOVE ± 115' OH TPX SEC AS NEEDED REMOVED ( ') OH TPX SEC -TRANSFER EX OH TPX SEC TO NEW P05 P02 TO P03 -REMOVE ± 115' OH TPX SEC AS NEEDED REMOVED ( ') OH TPX SEC -TRANSFER EX OH TPX SEC TO NEW P05 P2A TO P4A -INSTALL ± 460' 397.5 MCMAAC FEEDER INSTALLED ( ') 397.5 NCNAAC FEEDER P03 TO IP1 -ABANDON ± 135' 2" DB120 CONDUIT ABANDONED ( ') 2" DB120 CONDUIT P03 TO 2623 -REMOVE ± 35' OH TPX SEC AS NEEDED REMOVED ( ') OH TPX SEC -SPLICE TAIL SP1 TO V01 P03 TO P04 -REMOVE ± 255' 4/0 ACSR AS NEEDED REMOVED ( ') 4/0 ACSR P04 TO P4A -INSTALL ± 35' #2 ACSR OH PRIMARY AS NEEDED INSTALLED ( ') #2 ACSR OH PRIMARY P05 TO 2616 -TRANSFER EX OH TPX SEC TO NEW P05 TRANSFERRED ( ') OH TPX SEC CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 'A''B'3 SCH80 1 80 ( )'SCL SECONDARY X02 'C''D'2 SCH80 1 95 ( )'SCL PRIMARY X03 'C''E' 2 SCH80 1 90 ( )'WCL FUT PRIMARY 4 SCH80 1 90 ( )'WCL PRIMARY 6 SCH80 1 90 ( )'WCL FEEDER 2" SCH80 GREY PVC = 185 FT 2" PVC PLUG /CAPS = 4 3" SCH80 GREY PVC = 80 FT 3" PVC PLUG /CAPS = 2 4" SCH80 GREY PVC = 90 FT 4" PVC PLUG /CAPS = 2 6" SCH80 GREY PVC = 90 FT 6" PVC PLUG /CAPS = 2 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P03 319112-167131 25kVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 319075-167131 50kVA DEVELOPER TO PROVIDE TYPICAL 5' PSE FRONTAGE EASEMENT FOR OPERATION AND MAINTENANCE OF PSE EQUIPMENT. EASEMENT TO BE CLEAR OF ALL BUILDING OVERHANGS AND FOUNDATION FOOTINGS 1"=10' SITE DETAIL 'B' SITE DETAIL 'B' SITE SPECIFIC NOTES CONT. AT P04 (319151-167130) 2001 CL UNK - 45' -AT EXISTING P04 INSTALL 10" SINGLE HELIX 1" ROD PLATE ANCHOR (ANDH1) WITH ±30FT LEAD(S) 6012.1000 -INSTALL (2) 3/8 GUY STRANDS (GYD3SA) 6013.0100 -REMOVE EXISTING 3Ø 4/0 ACSR -ROTATE TRANSFORMER BANK TO NORTH SIDE OF POLE -POLE TO REMAIN AT P4A (NEW) -INSTALL NEW 45' CLASS 1 POLE (PD451) 6010.1000 -INSTALL 200A/600A TERM (TSUD631) PER STD 6043.1022 -INSTALL FEEDER TERMINATION (3ɸ - 397.5MCMAAC) (TSU3DF1) 6043.1020 -INSTALL (3) WEDGE CONNECTORS (MID: 2368200) -INSTALL (1) 6'' RISERS (RIS6CSS) 6042.1000 -INSTALL (1) 4'' PRIMARY RISER (RIS4CSS) -INSTALL GRID #319127-167132 AT P05 (NEW) -INSTALL NEW 35' CLASS 3 POLE (PS353) 6010.1000 -INSTALL NEW 3" SECONDARY RISER (RIS3CSS) 6042.1000 -INTERCEPT EXISTING OH SECONDARY TPX TO 2616 -INSTALL GRID #319091-167137 AT E01 -INSTALL NEW E MARKER (7668501) AT E02 -INSTALL NEW E MARKER (7668501) NEW: %V DROP: 2.4 @ P05 % FLICKER: 2.3 @ P05 EXISTING: % V. DROP: 3.6% @ 2616 % FLICKER: 4.0% @ 2616 NEW: %V DROP: 2.2 @ SP1 % FLICKER: 2.5 @ SP1 EXISTING: % V. DROP: 1.0% @ P03 % FLICKER: 1.8% @ P03 RESTORATION PER CITY OF RENTON STANDARDS MFP21003966 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP LEE BROWN 425.417.8620 4.01.21 A. DUNN 206.437.9150 7.21.21 ... J.COSSETTE 206.584.4408 6.13.21 REDT # ( RW-112327 )RENTON/ KING COUNTY FOREST TERRACE SCH 73 SCHEDULE 73 OH-UG CONVERSION - 2 SPANS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY .. .101140385 AS SHOWN 4 OF 5 KING N/A N/A QCSOKE NE 4-T23N-R05E N/A N/A 2305E013 2305E040 2305E013 PRE-14 COMCAST JAMES COHN 253.569.0636 CENTURYLINK KENNETH LUU 206.346.0144 RENTON SCHOOL DIST. JAY GRAY 253.226.8314 PSE RIGHT OF WAY AMBER YANG 425.456.2774 ... ... ... THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED J01 319095 167130 4'8"x7'x5' w/2-3' Sq Doors Matid: 7663200 J-Box Below Grade w/ 4-Pos J-Bus x3 Matid: 7625900 8 4 JBOX15L 6055.1030 3Ø ELB10J 6041.1000 CAP (7630600) V01 319094 167129 54"x54"x38" Unistrut HH Matid: 7663002 75KVA MP TRF 120/240 Matid: 6247150 1 1 MINU1LR 6045.1010 AØ EXISTING V02 319121 167151 42"X48"X38" Unistrut HH Matid: Existing 50KVA MP TRF 120/240 Matid: Existing 1 - ELB10J 6041.1000 PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL P04 P4A 4 1 30 ----377 377 3Ø 1/0 AL JKT 90 -0.6 P4A P2A 6 1 460 -2 --1432 1427 3Ø 1/0 AL JKT 520 -3.6 P4A J01 4 1 35 -2 --336 557 3Ø 1/0 AL JKT 340 EIV129 EIV130 EIV131 -2.5 J01 E01 2 1 240 1 1 --CONDUIT ONLY J01 V01 2 1 5 ----32 32 1/0 AL JKT 15 EIV132 0.1 J01 IP1 CABLE ONLY 126 121 1/0 AL JKT 125 EIV133 0.5 J01 V02 2 1 390 1 ---CONDUIT ONLY J01 P2A 4 1 135 -1 --468 436 3Ø 1/0 AL JKT 165 EIV134 EIV135 EIV136 1.2 2" PVC (FT) & BENDS =635 2 1 --1/0 AL JKT TOTAL (FT) =140 0.7 4" PVC (FT) & BENDS =470 -3 --3Ø 1/0 AL JKT (FT) =1115 1.1 6" PVC (FT) & BENDS =460 -2 --1.6 NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 319075 167131 40'1 1986 DD0360 COMCAST/ RENTON SCHOOL DISTRICT P02 319092 167131 40'1 1969 LUMEN/ COMCAST/ RENTON SCHOOL DISTRICT P03 319112 167131 40'1 1961 122904879 LUMEN/ COMCAST/ CELLNET/ RENTON SCHOOL DISTRICT POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P1A 319068 167131 45'1 2021 PSE Equip # P2A 319081 167131 50'H1 2021 PSE Equip # P4A 319127 167132 45'1 2021 PSE Equip # P05 319091 167137 35 3 2021 PSE Equip # NOT TO SCALE NEW CONDUIT DIAGRAM CONDUIT LEGEND PRIMARY 2" FEEDER 6" PRIMARY 4" SECONDARY 3" EXISTING 3" PRIMARY 3" SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V01 P05 1/O 95 70 3 15 2 0 0 0 2.4 2.3 SEE VDROP V01 SP1 1/O 105 70 3 105 2 0 0 0 2.2 2.5 SEE VDROP V01 E01 CONDUIT ONLY 3 65 0 1 0 0 FUT. FEED LOT 25 350 UG Triplex (ft) =200 3" PVC & BENDS (ft)=185 4 1 0 0 0.1 TOTAL QTS OF GLUE 0.1 WIRE REMOVAL TABLE Location Pri Sec Wire Size & Type Quantity Length (ft per conductor)RemarksFromTo P02 P04 X 4/O ACSR OH PRI & NEUTRAL 4 490 P01 P02 X 1/O OH TPX SEC 1 145 P02 2616 X 1/O OH TPX SEC 1 110 Total CKT Feet (4/O ACSR PRI) Removed 490 Total Feet ( 4/O ACSR NEUT) Removed 490 Total Feet ( 1/O OH TPX SEC) Removed 255 CABLE/WIRE REMOVAL TABLE SPAN ACTUAL REMARKS FROM TO CABLE TAG SIZE LENGTH WIRE P03 V02 BØACJ657 1/O AL JKT 125'- NEW 1/O AL EIV129-AØ EIV130-BØ EIV131-CØ NEW 1/O AL EIV134-AØ EIV135-BØ EIV136-CØ NEW 1/O AL EIV133-BØ NEW 1/O AL EIV132-AØ MFP21003966 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP LEE BROWN 425.417.8620 4.01.21 A. DUNN 206.437.9150 7.21.21 ... J.COSSETTE 206.584.4408 6.13.21 REDT # ( RW-112327 )RENTON/ KING COUNTY FOREST TERRACE SCH 73 SCHEDULE 73 OH-UG CONVERSION - 2 SPANS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY .. .101140385 N/A 5 OF 5 KING N/A N/A QCSOKE NE 4-T23N-R05E N/A N/A 2305E013 2305E040 2305E013 PRE-14 COMCAST JAMES COHN 253.569.0636 CENTURYLINK KENNETH LUU 206.346.0144 RENTON SCHOOL DIST. JAY GRAY 253.226.8314 PSE RIGHT OF WAY AMBER YANG 425.456.2774 ... ... ... THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) VAULT DETAIL @ V01 NOT TO SCALE TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONT575 HH 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" VAULT DETAIL @ J01 NOT TO SCALE CLEAR WORKING SPACE FOR VAULTS NOT TO SCALE FIELD SIDE (PREFERRED) ROAD SIDE (PREFERRED) 6' MIN 3' MIN 3' MIN 3' MIN Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN JOINT TRENCH DETAIL Primary-Schedule 40 (NTS) Excavated Dirt Pile Final Grade 24" Min Backfill for Schedule 40 Conduit (NO Rocks over 10" Diameter or foreign objects)Separation 4" Min 18" Min 48" Max 36" Min Cover Phone & TV Primary Power Cable in PSE Provided DB-120 Conduit ROADSIDE To Excavated Dirt Pile MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' MFP21003966