Loading...
HomeMy WebLinkAboutMFP21004013.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP21004013 IVR Number: 21004013 Permit Information Permit Name: Century Link Permits Address/Location:08/13/2021Application Date:0823059165Parcel Number: 801 HOUSER WAY N Permit Type:09/30/2021Issue Date:Franchise Permit Work Class:09/30/2022Expiration Date:Major Utility Job Number: N.736672Franchise Type:Telephone Description: Century Link/Lumen to install new copper cable in existing conduit from Houser Way to MH 54 (in WSDOT ROW) to MH 55 @ NE 7th St/sunset Blvd. Access MH55 for splicing and splice at pole on Houser Way. Wreck out 1500pr after splicing complete. extend vacated conduit from pole to HH 800 on Houser Way then place new innerduct and fiber from HH 800 to MH 55. Restoration per City of Renton standards Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date QWEST corp d/b/a CenturyLink QC Austin Sweeney 253 766 7549 Austin.sweeney@centurylink.com Northsky Communications 425 615 7121 NORTHSC857Q4 BL.028638 N.736672 Houser Way & N 8th St crossing I-405 to NE 7th St & Sunset Blvd CenturyLink/Lumen to Install new copper cable in existing conduit from Houser Way to MH 54 (in WSDOT R/W) to MH 55 @ NE 7th St/ Sunset BLVD. Access MH 55 for splicing & splice at pole on Houser Way. Wreck out 1500pr after splicing complete. Extend vacated conduit from pole to HH 800 on Houser Way (approx. 20ft), then place new innerduct & fiber from HH 800 to MH 55 X X X X 8/13/21Austin Sweeney MFP21004013 RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 9/30/2021 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering CenturyLink/Lumen to install new copper cable in existing conduit from Houser Way to MH 54 (in WSDOT R/W) to MH 55 @ NE 7th St/Sunset BLVD. Access MH 55 for splicing & splice at pole on Houser way. Wreck out 1500pr after spilcing 1500pr after splicing complete. Extend vacated conduit from pole to HH 800 on Houser Way (approx. 20ft), then place new innerduct & fiber from HH 800 to MH 55 N.736672 Houser Way & N 8th St crossing I-405 to NE 7th St & Sunset Blvd Monday Friday 8:00am 3:00pm Northsky Communications LLC.425 615 7121 Austin Sweeney Austin.sweeney@centuryLink.com 23315 66th Ave S Kent 98032 MFP21004013 Scott Warlick CED 9/30/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Austin Sweeney Austin Sweeney 8/13/2021 MFP21004013 MFP21004013 MFP21004013 Lumen Civil Base Map I405 EXPRESS TOLL LANES - NE 8TH TO NE 7TH W.S.D.O.T. - PROJECT No. XL5467 RENTON, WA Cover Sheet 2 Legend 3 Civil Base Map Color Key:Existing FacilitiesConflict Mitigation Action (Proposed Facilities)Additional Information Needed/Notes Estimated % Design Drawings: 90% Jurisdiction File Name: 41_XL5467_PS_CENT01_UI 1601.pdf Received file from Jurisdiction Date: 3/8/21 PROJECT LOCATION FOR REFERENCE ONLY NOTES: ALL EXISTING AND PROPOSED CONDITIONS ARE BASED ON INFORMATIONPROVIDED BY OTHERS. LUMEN CANNOT BE RESPONSIBLE FOR THE ACCURACYOF INFORMATION AND/OR PLANS PROVIDED BY OUTSIDE PARTIES. FACILITYLOCATIONS, DEPTHS AND ELEVATIONS SHOULD BE FIELD VERIFIED PRIOR TOCONSTRUCTION. PROPOSED DESIGN MODIFICATIONS ARE RECOMMENDATIONS ONLY ANDSHOULD BE VERIFIED PRIOR TO CONSTRUCTION. INDEX OF SHEETS Plans Prepared For: Plans Prepared By: LOCATION MAPNOT TO SCALE N SHEET 1 of 4DATE: 08-02-21 REV. DATE DESCRIPTION 1 04-02-21 Initial TT Draft Issued 1 CTL JOB: N.GEO CODE:WC CLLI: RNTNWA01 (Renton)ENGINEER: Jesse PatjensPHONE: 206-733-8591EMAIL: jesse.patjens@lumen.comCPA: Paul ButlerPHONE: 206-348-0058EMAIL: paul.butler@centurylink.com TT Eng: Chelsea LloydPhone: 208-755-3226E-mail: clloyd@terratechllc.netTT #: WACLhttp://www.terratechllc.net TT Eng: Kelly CasteelPhone: 206-353-6847E-mail: kcasteel@terratechllc.netTT #: WACLhttp://www.terratechllc.net TT Eng: Tom BrownPhone: 206-799-2989E-mail: tbrown@terratechllc.net TT #: CL 16.7042http://www.terratechllc.net TT Eng: Beth TanPhone: 206-660-6330E-mail: btan@terratechllc.net TT #: WACLhttp://www.terratechllc.net TT Eng: Mike CockéPhone: 253-732-7075E-mail: mcocke@terratechllc.netTT #: WACLhttp://www.terratechllc.net TT Eng: Kristal GreenhawPhone: 425-512-5061E-mail: kgreenhaw@terratechllc.netTT #: WACLhttp://www.terratechllc.net Utility Plan TT Eng: Cory CoatePhone: 503-961-5023E-mail: ccoate@terratechllc.netTT #: WACLhttp://www.terratechllc.net TT Eng: Tim PersonettPhone: 509-570-8967E-mail: tpersonett@terratechllc.netTT #: WACLhttp://www.terratechllc.net 2 04-07-21 Revised Placement Notes 3 08-02-21 Added Profile Information 4 Utility Profile MFP21004013 Legend X X XXX X X X X HH HH HHX X X XX XCP ) X Existing CenturyLink pedestalor or or New CenturyLink pedestal Existing CenturyLink pedestal to be removed Existing CenturyLink SAI (serving area interface) New CenturyLink SAI (serving area interface) Existing CenturyLink SAI to be removed orabandoned Existing CenturyLink cable or conduit to beremoved or abandoned Existing CenturyLink handhole New CenturyLink handhole Existing CenturyLink handhole to be removed Existing CenturyLink manhole (various sizes) New CenturyLink manhole (various sizes) Existing CenturyLink double lidded manhole(various sizes) New CenturyLink double lidded manhole(various sizes) Existing CenturyLink manhole to be removedor abandoned (all sizes and types) Existing CenturyLink repeater New CenturyLink repeater Existing CenturyLink repeater to be removed CP Existing CenturyLink cool ped. - fiber/electronics New CenturyLink cool ped. - fiber/electronics Existing CenturyLink RT (remote terminal) New CenturyLink RT (remote terminal) Existing CenturyLink pole New CenturyLink pole Existing CenturyLink pole Existing CenturyLink down guy and anchor New CenturyLink down guy and anchor New CenturyLink sidewalk down guy and anchor Existing power company down guy and anchor X X Lumen Civil Base Map 2 of 4 btel Existing buried telephone line tduc Existing telephone duct run afo-exist Existing aerial fiber optic aer-tel Existing overhead telephone line fo-exist Existing buried fiber optic bsw-ex Existing buried service wire asw-ex Existing aerial service wire New overhead telephone line BTEL New buried telephone line TDUC New telephone duct run BSW-NEW New buried service wire AFO-NEW New aerial fiber optic AER-TEL FO-NEW New buried fiber optic ASW-NEW New aerial service wire Project Details Narrative/Special Remarks: The CenturyLink relocation scope will include:• Construction Sequencing Description Regarding CenturyLink Relocation Scope and Jurisdiction Project Construction: CenturyLink's relocation scope is planned to occur prior to Jurisdiction's Construction Start Date. Temporary Facilities: There are no planned temporary facilities as part of CenturyLink's relocation scope. Example Narrative/Special Remarks: This project proposes to relocate CenturyLink facilities along (insertproject route) between (insert project extents) for the Constructionof (insert Jurisdiction's Project Name and Number). Existing buried splice New buried splice New leased pole Existing leased poleL L Abbreviations ct. Countpr. Pairpp Pending Placementug. Underground Existing joint use pole New joint use pole New foreign owned (e.g. power) Existing foreign owned (e.g. power) J J Existing CenturyLink power pedestal New CenturyLink power pedestal P P Existing CenturyLink pole to be removed 1. ALL DUCT ELEVATIONS ARE BASED ON POTHOLE INFORMATION, UNLESS NOTED OTHERWISE, AND HAVE BEEN PROVIDED BY OTHERS. ELEVATIONS SHOWN ARE TOP OF DUCT. DEPTHS SHOWN ARE DISTANCE BELOW EXISTING FINISHED GRADE. 2. PROPOSED VAULT AND DUCT LOCATIONS SHALL BE FIELD VERIFIED AGAINST EXISTING AND PROPOSED UTILITIES. ENGINEER IN CHARGE DURING CONSTRUCTION SHALL BE NOTIFIED OF CONFLICTS. Notes All methods, materials, content and form contained in this material are the intellectual property of Terra Technologies LLC, and may not be copied, reproduced, distributed, or displayed without the express written permission of Terra Technologies LLC. The technology presented in this material is protected under various U.S. and international patents and pending patent applications, including without limitation, U.S. Patent Nos. 7,771,140; 8,016,518; and 8,061,934. MFP21004013 XL5467 CENT01MATCH LINE SB405 STA. 5565+00.00 MATCH LINE SB405 STA. 5550+00.00SCALE IN FEET 0 50 1001110 STA. 5550+00 TO STA. 5565+00 UI# 1601 CENTURYLINK - BURIED COMM PLAN SEW WALL 04.52L 18" Pcssp 12" Pcssp 12" Pcssp12" Pcssp 12" Pcssp 12" Pcssp 12" Pcssp 12" Pcssp 12" PCSSP 12" PCSSP 12" PCSSP 18 " PCSSP 18 " CM P18 " PCSSP 18" PCSSP ? ? ?? ???????? ?? ?????????????????????????????????????????????????CV CV ?? ?????STTSTT????? ????????????STTRR??STT????MB ???? ????????????STT??????MB??STT?MBMB ??????UUUUUUUUUUUUUUUUUUUUUUUUUCC CCCCCCCCCCCPPPPPPP PP PPP P P PP P P P PPPPPPP P CV CV SSSSSSSSSSSSPHPHPHPHCPCPCMW-201 -20 W-20 2-20 PHPHPH?? ?????STTSTT????? ????????????STTRR??STT????MB ???? ????????????STT??????MB??STT?MBMB ??????UUUUUUUUUUUUUUUUUUUUUUUUUCC CCCCCCCCCCCPPPPPPP PP PPP P P PP P P P PPPPPPP P CV CV SSSSSSSSSSSSPHPHPHPHCPCPCMW-201 -20 W-20 2-20 PHPHPHWL 4.9RBUILDINGSPACCAR PLATT ELECTRIC SUPPLY SB I-405 NB I-405 N. 8TH STSUNSET BLVD NE HOUSER WAY BYPASS SUNSET BLVD NENE 7TH STWL 4.9R SSSSSSSSSSSSSSPHPHPHPHCPCPCPHPHPHMP 4.65 MP 4.70 MP 4.75 MP 4.80 MP 4.85 MP 4.90 DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. FILE NAME TIME DATE 12/24/2020 c:\users\matt\documents\projectwise\workingdir\wsdot\dms09123\41_XL5467_PS_CENT01_UI 1601.dgn REVISION BY SHEET OF SHEETS LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH10PLOTTED BY DATE 11:12:09 AM Washington State Department of Transportation P.E. STAMP BOX DATE P.E. STAMP BOX DATE PLAN REF NO TDW MF JMS CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 J. LEFOTU MF L. HODGSON AND EXPRESS TOLL LANES PROJECT I-405; RENTON TO BELLEVUE WIDENING C9242 XL5467 TYPE 1 LOCATE AND AVOID BURIED TELEPHONE CENTURYLINK UI#1601 TYPE 1 LOCATE AND AVOID 4" STW HP IN 8" CASING GAS PSE UI#1589 PUBLIC RELOCATE NEW SSMH COR UI#1522 CENT01A15550 75607560 7555 7550 5560 5555 5565 tduc tduc tduc tductductductductductductductductductductdu c tdu c tdu c aer-tel aer-teltductductductductducHH 2-4" ducts 100 pr. buried 24 ct. ug. fiber 2-4" ducts 1500 pr. ug. 24 ct. ug. fiber 50 pr. aerial 200 pr. aerial Pedestal Pole Metal Power Pole MH #54 8'x4'x6' After new placement & wreck out of 1500pr is complete, remove MH 54, split duct conduits together. Mandrel & place mule tape HH #800 Leave 100ft coil of fiber in HH-800 Tag & label cable with project placing # 8-4" ducts 1500 pr. ug. Place new 200pr in existing conduit from pole to MH 55 Place 3-1.25" innerduct & 24ct fiber Remove DSMC-1500pr ug after splicing complete Pedestal w/ term 717 NE Sunset tductduc2-4" ducts 4-4" ducts 100 pr. ug. 900 pr. ug. Pole #A1080517 MH #55 8'x4'x6' Leave 100ft coil of fiber in MH 55 Tag & label cable with project placing # Pedestal w/ term 701 NE Sunset Pole 3 of 4 To SAI X 801 Sunset BV NE Extend spare conduits past edge of WSDOT improvements 2-3.5" ducts 1500 pr. ug. MFP21004013 Work and traffic control in WSDOT ROW will require additional approval from WSDOT XL5467 NOTES: 2. FINAL GROUND LEVEL TO BE CONFIRMED. 1. TO BE UPDATED AS DESIGN PROGRESSES. CENT01A CENTURYLINK BURIED COMM SECTION SECTION STA. 7558+88.27 UI# 1601 CENTURYLINK - BURIED COMM 10+0011+0010+5011+5012+00140 130 120 110 60 80 90 70 100 140 130 120 110 60 80 90 70 100 STA. 10+40.77DUCTBANK FOUND AT 93.2'POTHOLED. TOP OF STA. 11+67.80ELEVATION UNKNOWN.POTHOLED. TOP OF DUCTBANK OG OGSTA: 5562+57.55 FINISHED I-405 SB STA:7558+59.06 FINISHED I-405 NBDUCTBANK FOUND AT 90.8'POTHOLED. TOP OF STA. 10+34.06STA. 10+27.59CENTER OF 42" VAULT LIDDESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. FILE NAME TIME DATE 12/24/2020 c:\users\matt\documents\projectwise\workingdir\wsdot\dms09123\41_XL5467_PS_CENT01A_UI 1601 PROFILE.dgn REVISION BY SHEET OF SHEETS LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH10PLOTTED BY DATE 12:52:28 PM Washington State Department of Transportation P.E. STAMP BOX DATE P.E. STAMP BOX DATE PLAN REF NO TDW MF JMS CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 J. LEFOTU MF L. HODGSON AND EXPRESS TOLL LANES PROJECT I-405; RENTON TO BELLEVUE WIDENING C9242 XL5467 CENT01 1 Existing Ground Profile of Existing Ducts 4 of 4 MH #54 To Be Removed after new placement is complete MFP21004013