Minor Franchise Permit: MFP21004660
IVR Number: 21004660
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:09/28/2021Application Date:7227801235Parcel Number: 2826 SUNSET LN NE
Permit Type:09/30/2021Issue Date:Franchise
Permit Work Class:09/30/2022Expiration Date:Minor Utility
Job Number: 105097652Franchise Type:Electric
Description: Puget Sound Energy Electric 2828 SUNSET LN NE CREW TO INSTALL OH TO UG 3PHASE PRIMARY LINE EXT
FROM P01 (318610 166735) APPROX 120' TO V01 (318610 166752). RESTORATION PER CITY OF RENTON
STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
SOLERA MANAGER LLC 10900 NE 8TH ST STE 1200
BELLEVUE , WA 98004
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
105097652
2828 SUNSET LN NE
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
TIN NGUYEN TIN.NGUYEN@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21004660
Scott Warlick CED 9/30/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
P01
P02
J01
J02
V01 10 10 10 101616
10 10 10 10NE 12TH ST JEFFERSON AVE NEHARRINGTON PL NESUNSET LN NE18
18
13
13 SUNSET LN NE13
13SUNSET
LN
NE1717Vault
Vault
Vault
STOP
FLAGGER
STOP
FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1100'ROADWORKAHEADW20-1
100'
NE 12TH ST
W20-7ARO
A
D
W
O
R
K
AH
E
A
D
W20-1W20-4ONE
L
A
N
E
ROA
DAH
E
A
D100'100'100'S/WCLOSEDR9-9CROSS HERESIDEWALK CLOSEDAHEADRESIDENT(S)/BUSINESS(ES) WILL
BE INFORMED OF POSSIBLE
TEMPORARY DRIVEWAY CLOSURE
FLAGGERS SHALL STOP TRAFFIC
IN ALL DIRECTIONS (SHORT DURATION:
APPROX 10 MINUTES) FOR LINE DROP.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
08/18/2021
101139568
0
2828 Sunset Ln NE, Renton
Flaviana Nunes
425-424-7809
flaviana.rodriguesnunes@pse.com
1 OF 2
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
VAULTVault
TRENCH
105097652
MFP21004660
P01
P02
J01
J02
V01 10 10 10 101616
10 10 10 10NE 12TH ST JEFFERSON AVE NEHARRINGTON PL NESUNSET LN NE18
18
13
13 SUNSET
LN
NE1717Vault
Vault
Vault
STOP
FLAGGER
STOP
FLAGGER W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1100'ROADWORKAHEADW20-1
100'
NE 12TH ST
S/WCLOSEDR9-9CROSS HERESIDEWALK CLOSEDAHEADRESIDENT(S)/BUSINESS(ES) WILL
BE INFORMED OF POSSIBLE
TEMPORARY DRIVEWAY CLOSURE
S/
WCL
O
S
E
DR9-9CR
O
S
S
H
E
R
E
SID
E
W
A
L
K
C
L
O
S
E
D
AH
E
A
D
SUNSET LN NE13
13
W20-7ARO
A
D
W
O
R
K
AH
E
A
D
W20-1W20-4ONE
L
A
N
E
ROA
DAH
E
A
D100'100'100'FLAGGERS SHALL STOP TRAFFIC
IN ALL DIRECTIONS (SHORT DURATION:
APPROX 10 MINUTES) FOR LINE DROP.
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
08/18/2021
101139568
0
2828 Sunset Ln NE, Renton
Flaviana Nunes
425-424-7809
flaviana.rodriguesnunes@pse.com
2 OF 2
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
VAULTVault
TRENCH
105097652
MFP21004660
318610-166752
1000 kVA 277/480V (ABC)
PSE INST. 3-RUN 3Ø 1/0 UG JKT CABLE ±290'
(AØEJA416)
(BØEJA417)
(CØEJA418)
318622-166725
±2
1
0
'
J
CUST. SUPPLIED 8' X 10' X 6"
BEDDING OF CRUSH ROCK
PSE INST.1-4" DB120 CONTINUOUS PVC
CONDUIT ±240' IN CUST. PROVIDED TRENCH
CUST. SUPPLIED 4' X 4' WORKPIT
90°
R=60"±30'±2
1
0
'
J
45°
R=60"
2825
975
1140
R
O
W
50'
318611-166710
75 kVA 120/240V (A)
318610-166735
PRE
11
#2ACSRCBAN
318619-166715
100 kVA 120/240V (A)
S
U
N
S
E
T
L
N
N
E
SUNSET LN NEHARRINGTON PL NEHARRINGTON PL NE318610-166752
1000 kVA 277/480V (ABC)EX. ROW40'PROPOSEDROW 40'P
R
O
P
O
S
E
D
R
O
W
4
0
'PROPOSEDROW 40'
318622-166725
J HIG13CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT J01
-REQUIRED TO PROVIDE 8' X 10' X 6” CRUSHED ROCK BED AT V01
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
NEW CABLE DIAGRAM
NOT TO SCALE
SITE SPECIFIC NOTES
AT J01: 318622-166725
-EXISTING vAULT AND EQUIEPMENT TO REMAIN
-INST. (3) LB ELBOWS 6041.1000 (ELB10J)
-INST. CABLE TAG'S
AT S01: 318650-166771
-EXISTING VAULT AND EQUIEPMENT TO REMAIN
-Remove (1) INST. (3) LB ELBOWS 6041.1000 (ELB10J)
-INST. CABLE TAG'S
AT V01: 318610-166752
- INSTALL (1) 8' X 10' TEMPORARY CONCRETE PAD (MID: 9996110)
- INSTALL (1) 1000KVA PADMOUNT TRF (MID: 6259350)
- INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
- INSTALL (4) 4-POS #2 TO 500 KCMIL CONNECTOR LUGS (MID: 7651002)
- INSTALL (12) MOUNTING BOLT KITS (MID: 7651008)
- INSTALL GRID #
- CONNECT 3-RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 400KCMIL SVC
M01 AT "2828": NEW TEMP METER BASE
-INSTALL 800A TEMP METER
SPAN SPECIFIC NOTES
- REFER TO ONE LINE DIAGRAMS AND TABLES FOR INSTALL
NEW CONDUIT DIAGRAM
NOT TO SCALE
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. NGUYEN 253-437-6703 06/02/21
D. BRINKMANN 253-234-6445 06/02/21
E. SCHOTT 714-893-2405 06/02/21
RW-123463 RENTON
SOLERA TEMP
TEMP 3Ø PRI L/E AND SERVICE
2828 SUNSET LN NE, RENTON, WA 98056
N/A N/A
N/A 105097652
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NW 9-23N-05E N/A N/A
2305E034 2305E040 2305E034 HIG-13
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TIN NGUYEN
253-244-4303
TIN.NGUYEN@PSE.COM
GAS
PHONE
CABLE TV
PROJECT PHASE
PWR
NOTIF#ORDER#105097652Owner / Developer Contact Info
officeATTN:
SOLERA MANAGER, LLC
10900 NE 8TH ST. SUITE 1200
BELLEVUE, WA 98004
DALTON ARNDT 253-606-0715
Superior
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HIG-13
06/2020
202 152 106
36.07 36.07 36.07
238.07 188.07 142.07
00 1"2"
00 50'100'
511313229 105098436
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (480Y/277V)
277V WINDINGS 480V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 1000kVA ---2.20 54,600 AMPS
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION FOR FEEDER CABLE ONLY
Check applicable box
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Tape CN #4/0 NEU Design As Built Actual Amount Installed
(Conduit & Cable)
P01 V01 4"1 240'X 1 1 0 0 524.1 585.8
PRI
34KV
1/0 UG
290'EJA416 EJA417 EJA418
CIRCUIT FEED ADDED: 240'
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
N/A
800AMPS
N/A
246.73 kW
543A
3.6% @ V01
2.5% @ V01
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
1000kVA 277/480v
6259350
V01
318610-166752
UG Service 511324415 105097652
594143731OH Misc
108129413Temp Removal
584235723XFMR Removal
SITE PLAN
SCALE: 1" = 50'
MFP21004660
RESTORATION PER CITY OF RENTON STANDARDS
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
8'
TRANSFORMER CABINET
FOOTPRINT
3Ø PRIMARY CABLE
IN 1-4" PVC CONDUIT 10'
36" MIN COVER
6" CRUSHED ROCK BEDDING
TEMPORARY CONCRETE LID
3Ø PRIMARY CABLES
4" PVC CONDUIT
TEMPORARY CONCRETE
PAD
COMPACTED
BACKFILL
CUSTOMER SUPPLIED
SECONDARY PVC
TOP VIEW
TEMPORARY TRANSFORMER INSTALLATION DETAIL
Not to scale 6315.1000 - MEDIUM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. NGUYEN 253-437-6703 06/02/21
D. BRINKMANN 253-234-6445 06/02/21
E. SCHOTT 714-893-2405 06/02/21
RW-123463 RENTON
SOLERA TEMP
TEMP 3Ø PRI L/E AND SERVICE
2828 SUNSET LN NE, RENTON, WA 98056
N/A N/A
N/A 105097652
AS NOTED 2 OF 2
KING N/A N/A CSPSKEPM
NW 9-23N-05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A 105097652UNDERGROUND CIRCUIT MAP
SCALE: 6" = 1 MILE
OVERHEAD CIRCUIT MAP 2305E040
JOB SITE
JOB SITE
SCALE: 1" = 75'
THREE PHASE SECONDARY CONCRETE HANDHOLE
Not to scale 6050.2120-13'-6"4'-0"
6'-0
"
Typical customer run
service conductors
in duct
Install PVC bellends
and grout into wall
Seal conduit
with foamConduits and conductors
shall enter from ends of
handhole through
knockouts provided
Cover with 2 3' Sq Std Plate Door,
or
Cover with 2 3' Sq Anti-Skid Door
Base
3450 lbs
Cover
1510 lbs
6'-8
"
4'-8"6"POWE
R
2"
SIDE VIEW
4'-4"Crushed
6"
Rock
TOP VIEW
8'
10'
Excavation - 13 Cubic Yards
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
6775.0035 Not to scale
POSSIBLE CUSTOMER
ENTRY LOCATION
POSSIBLE CUSTOMER
ENTRY LOCATION
PSE
POSSIBLE CUSTOMER
ENTRY LOCATION
CABLE INSTALLATION DIAGRAM L
Not to scale
MFP21004660