Loading...
HomeMy WebLinkAboutM_Confirmation of Condition of Approval_20211005_v2 8/13/2021 To The City of Renton, I am writing to confirm compliance with all conditions of plat approval. Every condition of approval has been met with the assistant of multiple licensed personnel, such as contractors, surveyor, engineer, landscape architect, arborist, and the City of Renton staffs. I look forward to building a better community in the City of Renton. 1. Revised landscape: A revised landscape plan was included and approved with the civil construction permit. Landscaping has been installed and inspected. 2. The revised landscape plan submitted is in compliance with the minimum tree density requirements for each lot. The landscape plan have been reviewed and approved. 3. Lot 2 will take access off of the emergency turnaround tract. A “No Parking” sign have been installed on each side of the pavement within the turnaround. 4. The approved setback variance only apply to existing structure in its current location. There will be no further additions or expansions to the structure. 5. A revised landscape plan was submitted. Landscape has been installed between the existing shared driveway and the neighboring property to the east. Landscape have been inspected and approved. 6. A shared maintenance agreement for equal ownership and maintenance responsibilies for improvements in Tract A was included on the face of the plat. A draft version has been sent for review. 7. A construction bond was sent and received by the City of Renton upon re-application of civil construction permit. I am currently obtaining the 2 year maintenance bond and will send in as soon as I receive it. 8. The existing on-site fence have been revised, inspected, and approved. Thank you, Brian Le 3413 NE 7th St Renton, WA 98056 206-427-2193