Loading...
HomeMy WebLinkAboutMFP21004555.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21004555 IVR Number: 21004555 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:09/21/2021Application Date:7225500375Parcel Number: 320 WILLIAMS AVE N Permit Type:10/06/2021Issue Date:Franchise Permit Work Class:10/06/2022Expiration Date:Minor Utility Job Number: 101135492Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW AND AND INSTALL SERVICE AT P01 (318090 166086). POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL FITTERER MARCUS 2537 HOWSTON CT RICHLAND , WA 99354 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101135492 320 WILLIAMS AVE N PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 ROBERT SANBORN ROBERT.SANBORN@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21004555 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 10/6/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG 1717 111111111111N 3rd S T N 3rd S T WILLIAMS AVE NP01 P02 P03 320 M1 M2HH01 1717 ONE WAYONE W A Y ONE W A YSHOULDERWORKW21-5ROADWORKAHEADW20-1100'100'SHOULDERWORKW21-5ROADWORKAHEADW20-1100'100'1717ONE WAY1717ONE WAYS/W CLOSED R9-9S/WCLOSEDR9-9CROSS HERE SIDEWALK CLOSEDAHEAD N 4TH ST RESIDENT(S) WILL BE INFORMED OF POSSIBLE TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS BOTH SIDES OF WORK AREA FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0 000000 NO PARKINGNO-PA R K FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K CROSS HERESIDEWALK CLOSEDAHEADONE WAY ONE WAY LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 09/07/2021 101135492 0 320 Williams Avenue N, Renton, WA Ina Ustemchuk 425-398-6063 ina.ustemchuk@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21004555 341 334 328 320 339 333 316 329 325 321 317 312 310 800 335 331 327 323 317 315 313 307 301 814 315 309804WILLIAMS AVE NN 3R D S T N 3 R D S T 318090-166086 25 kVA 120/240V (C) SLAG7901 318090-166101 318088-166112 4/0 UG TPLX L=200' 4/0 UG TPLX L=100' 350 UG TPLX L=50' 350 UG TPLX L=50' TRANSFER OH TRIPLEX TO P03 WORKSITE WORKSITE SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Ken Ponder 316 WILLIAMS AVE N RENTON, WA 98057 Ken Ponder 425-255-1184 SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. OH SVC Removal OH-UG SVC CON OH SVC Removal OH-UG SVC CON OH OPS Pole Removal Superior ORDER#NOTIF# PWR PROJECT PHASE 101135493510511829 108125943 101135491510511537 593229447 108123190 CABLE TV PHONE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager: ROBERT SANBORN425-748-6386 robert.sanborn@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X XX SCALE: 1" = 50'101135492THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 101135492 108125946 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT DATE OH CKT MAP CIRCUIT NOUG CKT MAP R. SANBORN PHONE NO 425-748-6386 07/14/21 R. SANBORN 425-748-6386 07/14/21 N/A QC. NGUYEN 425-748-6310 07/14/21 N/A RENTON THOMAS PONDER POLE REPLACEMENT, NEW HH, UG SEC L/E, (3) OH-UG SVC CONV 316 WILLIAMS AVE N, RENTON WA N/A N/A N/A 101135492 AS NOTED 1/1 KING N/A N/A QCNOKE NW17 T23N R05E N/A N/A 2305E066 2305E088 2305E066NW GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 510282548 P01 GRID #318090-166086 - EXISTING POLE & OH XFMR TO REMAIN - INSTALL (1) NEW 3” SECONDARY RISER [RIS3CSS] PER STD. 6042.1000 P02 GRID #318090-166101 - REMOVE EXISTING 35' CL3 POLE P03 GRID #318088-166112 -INSTALL (1) NEW 35' CL3 (2021) POLE [PS353] AS STAKED PER STD. 6010.1100 - TRANSFER EXISTING OH SEC FROM P02 TO P03 - INSTALL (1) NEW 3” SECONDARY RISER [RIS3CSS] PER STD. 6042.1000 HH01 - INSTALL NEW 13"x24" FG HANDHOLE [HH14350] PER STD 6050.2000 - INSTALL (3) 4 POS FARGOS - CONNECT (1) RUN OF CUSTOMER OWNED SVC P01 TO HH01 -POTELCO TO TRENCH & INSTALL 3" DB120 CONDUIT, L=50' (ACTUAL=___') - INSTALL (1) RUN OF #350 UG TPLX, L = 80' (ACTUAL=___') P01 TO P03 - TRANSFER EXISTING OH SEC FROM P02 TO P03 HH01 TO MTR "M1" -POTELCO TO TRENCH & INSTALL (1) 3” DB120 CONDUIT, L = 90” (ACTUAL = ___') - INSTALL (1) RUN 350 UG TPLX, L = 100' (ACTUAL = ___') HH01 TO MTR "M2" -POTELCO TO TRENCH & INSTALL (1) 3” DB120 CONDUIT, L = 190” (ACTUAL = ___') - INSTALL (1) RUN 350 UG TPLX, L = 200' (ACTUAL = ___') P03 TO MTR "M3" -POTELCO TO TRENCH & INSTALL (1) 3” DB120 CONDUIT, L = 20” (ACTUAL = ___') - INSTALL (1) RUN 350 UG TPLX, L = 50' (ACTUAL = ___') ***CUSTOMER TO PROVIDE ALL TRENCHING, CONDUIT, BACKFILL, & RESTORATION** ***CUSTOMER TO PROVIDE 3/8" NYLON PULL ROPE IN CONDUITS*** Field Face Quadrant Road Face Quadrant Climbing Space 5" MinCL Direction of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE SIDE VIEW 15" 23-1/4"32-3/4" 2" Captive L-Bolt Lock Cover, 10 lbs 24" Approx Approx 13" Customer's service conductors 4-3/4" X 4-3/4" KNOCKOUT IN 2 PLACES Conductors enter from beneath and shall be folded back with handhole TOP VIEW 5'-0" 4'-0" SINGLE PHASE SECONDARY HANDHOLE SCALE: NONE 6050.2000 TV & TEL Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Backfill for Conduit Free of rocks larger than 8" in diameter Separation 12" Min in Conduit Schedule 40 White PVC Gas Service Line 32" Typical (Power, Gas, Phone & Cable) Separation 12" Min 12" Min Separation 36" MINIMUM COVER IN RIGHT OF WAY JOINT TRENCH DETAIL Joint Service Line in Conduit (NTS) To Excavated Dirt Pile Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. Separation 12" Min Secondary Power Cable in Customer-provided 3" Schedule 40 Grey PVC Conduit SECONDARY CABLE & CONDUIT TABLE Work Location Cable Assumed Lot Corner Conduit Voltage Drop Voltage Flicker As Built Information Size Length Design (ft) Size Length Design (ft) Bends Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft) (in)90°45°22° 11°(Percent) (Percent) Actual Amount Installed (Conduit & Cable) P01 HH01 SEC 350 UG TPX 80'0 3"50' 3 0 0 0 ---- kWh Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" Top View 4' 3" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility 4' MTR BASE DETAIL SCALE: NONE UTILITY POLE EROSION CONTROL DETAIL TOP VIEW FLOWING DITCH or BODY OF WATER SLOPE Secure bottom of fence with gravel bags Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Adjacent to flowing ditches or bodies of water Install silt fence around pole excavation POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS Wk Loc Pole Data Pole TEL TV FIBER TRAN RMVD ID NUMBER Grid #Length Class Year TOPPED RMVD P02 318090-166101 45'CL3 1961 POLE TABLE (NEW) Work Location Pole Data Grid #Height Class Year Remarks / Location Ref. P03 318088-166112 35 CL-3 2021 P01 - P03 Conductor: #4/0 OH TPLX Runs: 1 KW Load: 12.1 kW SVC Length: 200 %VDrop: 1.5% %Flicker: 3.8% @XFMR (P01) Load: 37.3 kW LRC: 65 AMPS % V. Drop: 2.9% % Flicker: 1.5% P03 - MTR "M3" Sq. Footage: 3,600 SQ.FT Panel Size: 320 AMPS Heat Type: GAS Conductor: #350 UG TPLX Runs: 1 KW Load: 15.3 kW SVC Length: 210' %VDrop: 1.5% %Flicker: 3.8% P01 - HH01 Conductor: #350 UG TPLX Runs: 1 KW Load: 7.3 kW SVC Length: 80' %VDrop: 3.0% %Flicker: 1.8% @XFMR (P01) Load: 37.3 kW LRC: 65 AMPS % V. Drop: 2.9% % Flicker: 1.5% HH01 - MTR "M1" Sq. Footage: 3,600 SQ.FT Panel Size: 320 AMPS Heat Type: GAS Conductor: 4/0 UG TPLX Runs: 1 KW Load: 12 kW SVC Length: 210' %VDrop: 3.6% %Flicker: 2.5% HH01 - MTR "M2" Sq. Footage: 3,600 SQ.FT Panel Size: 320 AMPS Heat Type: GAS Conductor: 4/0 UG TPLX Runs: 1 KW Load: 12 kW SVC Length: 210' %VDrop: 3.6% %Flicker: 2.5% 8/26/21 MFP21004555 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS