Loading...
HomeMy WebLinkAboutAdden 1DocuSign Envelope ID: 6652FEA1-E216-4D21-A06C-BD7260EEAD07 CAG-20-156, Adden #1-21 AMENDMENT NO. 1 Project Name: SAFE ROUTES TO TRANSIT PROGRAM CAPITAL IMPROVEMENTS AGREEMENT Contractor: City of Renton (City agreement CAG-20-156) Address: 1066 South Grady Way Attn Vangie Garcia Renton, WA 98057 email vgarcia(a-)_rentonwa.gov AMENDMENT REQUESTED BY King County Metro Transit Organization Malva Slachowitz Name Transportation Planner III Title Contract No.: 6189115 Amendment Date: Feb. 24 , 2021 Amendment No.: 1 AMENDMENT EFFECTS ® Change of Scope ❑ Method of Payment ❑ Time of Performance ❑ Compensation ❑ Terms and Conditions ❑ Results of Services ❑ Other THIS AMENDMENT NO. 1 to the Safe Routes to Transit Program Capital Improvements Agreement between King County, Metro Transit Department and the City of Renton dated September 2, 2020 (the "Agreement"), is entered into by and between King County, a political subdivision of the State of Washington, acting through its Metro Transit Department (the "County" or "Metro") and the City of Renton, a municipal corporation of the State of Washington (the "City"), either of which may be referred to hereinafter individually as "Party" or collectively as the "Parties." Whereas, the Agreement generally relates to the design and construction of certain capital projects that are expected to improve safety, convenience and accessibility for people walking, bicycling and using assistive mobility devices to connect to transit services and facilities, and establishes the terms and conditions, scope of work, and budget for Project locations in Renton; and Whereas, Section 4 (Invoice and Payment Procedures) of the Agreement provides that the County will reimburse the City for actual, eligible costs incurred for work performed pursuant to the Agreement through December 31, 2020; and Whereas, Section 5 (Effective Date and Duration of Agreement) of the Agreement provides that the Agreement will be effective from September 2, 2020 until March 31, 2021; and Whereas, in accordance with Section 15 (Changes and Modifications) of the Agreement, the Parties now desire to amend the Agreement to extend its term in order to complete the scope of work so as to fulfill the intent of the Parties' objectives under the Agreement; and AMENDMENT NO. 1 to Safe Routes to Transit Program Capital Improvements Agreement Between King County, Metro Transit Department and City of Renton Page 1 of 5 DocuSign Envelope ID: 6652FEA1-E216-4D21-A06C-BD7260EEAD07 Whereas, through this Amendment No. 1 to the Agreement, the Parties also desire to modify the proposed Project improvements and update the Project schedule as a result of recent design work; NOW, THEREFORE, in consideration of the terms, conditions, and mutual covenants set forth herein and in the Agreement, the Parties hereby agree to amend the Agreement as follows: Subsection 4.1 (Invoice and Payment Procedures) of the Agreement is modified to read as follows: The County will reimburse the City for actual, eligible costs incurred for work performed pursuant to this Agreement as identified in the SOW. The City shall submit a completed invoice to the County detailing quarterly activities, outcomes, expenses and reimbursement amount due within thirty (30) days of each quarter's end. The County shall pay the City within thirty (30) calendar days after the County has received completed invoices. In no event shall the total reimbursement to City for work performed pursuant to this Agreement exceed the Reimbursement Cap provided for in Subsection 3.1 of this Agreement. 2. Section 5 (Agreement Term and Modifications) of the Agreement is modified to read as follows: This Agreement shall be in effect upon the latest date on which both Parties have signed the Agreement (the "Effective Date") and shall remain in effect through December 31, 2021, unless extended by written amendment of the Parties pursuant to Section 15 or earlier terminated pursuant to the provisions of Section 7 of this Agreement. 3. The table of projects set forth in Section 3 (Projects included in this Agreement) of Exhibit A (Statement of Work) to the Agreement, is deleted in its entirely and replaced with the following table: # LOCATION PROJECT PHASE / ELEMENTS 1 S 43rd St/S Carr Road and Talbot Implement a Lead Pedestrian Interval. Construction Road S 2 Main Ave S / S 3rd St Curb bulb outs with low-cost materials; curb Design and materials ramp and lighting upgrades Sunset Blvd Intersections: ADA improvements at Edmonds; RRFBs with curb 3 Edmonds Ave, NE 10th St and ramps at NE 10th and Kirkland locations Design and materials Kirkland Ave 4 Houser Way / Mill Ave S Curb bulb outs with low-cost materials; curb Design and materials ramp and lighting upgrades AMENDMENT NO. 1 to Safe Routes to Transit Program Capital Improvements Agreement Between King County, Metro Transit Department and City of Renton Page 2 of 5 DocuSign Envelope ID: 6652FEA1-E216-4D21-A06C-BD7260EEAD07 # LOCATION PROJECT PHASE / ELEMENTS 5 S 43rd St / SR 167 NB Ramps Access and alignment improvements for better Design crossing Shattuck Ave S, S 7th St to Grady Two-way cycle track with curb extension 6 Wa y improvements with low-cost materials and Design and materials signing 7 S 3rd Place, Rainier Ave S to New/upgraded streetlighting on S 3rd Place and Design and materials Shattuck Ave S sidewalk improvements 8 E Valley Rd / S 180th St Access and alignment improvements for better Design crossing Talbot Rd S, S 7th St and Grady Roadway improvements with low-cost materials 9 for better traffic operations and to help slow Design and materials Wa y speeds S Puget Dr/Royal Hills Dr RRFB for Mini -Roundabout (to be installed by Materials for mini- 10 SE/116th King County Metro); Conceptual Design Plans for roundabout; Design Full Intersection Roundabout Design Curb bulb outs with low-cost materials on west 11 SE 168th St / 128th Ave SE corners, APS push buttons at all corners, and Design and materials upgraded curb ramps 12 NE 12th St, west of Sunset Blvd Crossing improvements with low-cost materials, Design and materials curb ramp improvements, alternative walkway 13 NE 12th St, east of Sunset Blvd Improved crossings close to bus stops with Design and materials RRFBs, if possible Bronson Way N/Park Ave N, HAWK signal* with curb ramp and lighting 14 adjacent to Liberty Park upgrades Design 15 S 2nd St / Lake Ave S RRFB with curb ramp and lighting upgrades Design and materials 16 SE Petrovitsky Dr/118 Ave SE HAWK signal* with associated curb ramp and Design lighting improvements 17 SE Petrovitsky Dr/122 PI SE HAWK signal* with associated curb ramp and Design lighting improvements 18 SR 900/Oakesdale Ave SW HAWK signal* with associated curb ramp and Design lighting improvements *HAWK signals are subject to warrants and justification before installation. AMENDMENT NO. 1 to Safe Routes to Transit Program Capital Improvements Agreement Between King County, Metro Transit Department and City of Renton Page 3 of 5 DocuSign Envelope ID: 6652FEA1-E216-4D21-A06C-BD7260EEAD07 4 5 C: Section 4 (Schedule) of Exhibit A (Statement of Work) to the Agreement is modified to read as follows: The Project milestones are estimated as follows: MILESTONE MONTHNEAR Project completion for work under October 2021 (est) this Agreement Estimated Construction Start, By Year Future phases beyond this Agreement to be completed 2021: Projects 1, 3, 6, 9, 10 with City -secured funds. 2022: Projects 2, 4, 5, 8, 11, 15 2023: Projects 7, 12, 13 2024-2026*: Projects 14, 18 2026-2028*: Projects 16, 17 Projects are listed in implementation order. *HAWK signals are subject to warrants and justification before installation. Except as specifically provided for in this Amendment No. 1, all other terms and conditions of the Agreement shall remain unchanged and in full force and effect. This Amendment No. 1 shall be attached to and made a part of the Agreement. Any references to the Agreement shall mean the Agreement as amended. This Amendment No. 1 shall take effect upon the date it has been signed by both Parties. IN WITNESS WHEREOF the Parties hereto have caused their duly authorized representatives to execute this Amendment No. 1 to the Agreement as of the dates set forth below their respective signatures. KING COUNTY �/D'ocuSign�ed/by: By: /GLLK W�E err` GWF d, FGeneral Manager Metro Transit Department Date: 3/11/2021 CITY OF RENTON By. A�� Armondo Pavone, Mayor Date: 2/24/2021 AMENDMENT NO. 1 to Safe Routes to Transit Program Capital Improvements Agreement Between King County, Metro Transit Department and City of Renton Page 4 of 5 DocuSign Envelope ID: 6652FEA1-E216-4D21-A06C-BD7260EEAD07 Attest By: Jason A. Seth City Clerk Date: 2/24/2021 Approved as to form only: By: Approved by Cheryl Beyer via 2/19/2021 email City Attorney AMENDMENT NO. 1 to Safe Routes to Transit Program Capital Improvements Agreement Between King County, Metro Transit Department and City of Renton Page 5 of 5 Date