HomeMy WebLinkAbout0895.06 SWFR 342.pdf CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 1 of 3 342
Time On Site Time Off Site Date Day of Week
11:25 11:45 10/13/21 Wednesday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
•Buffer Zones around Sensitive Areas
•Silt Fence
G N - Chain link fence installed along site perimeter
2. Establish Construction Access
•Fabric; Quarry Spalls
•Wheel Wash
•Sweeper Truck
F N - Light track out observed, continue to sweep offsite
roads during trucking operations
3. Control Flow Rates
•Stormwater Vault or Facility
•Straw Wattles
•Check Dams
G N - Onsite stormwater vault plugged
4. Install Sediment Controls
•Silt Fence
•Straw Bale Barriers
•Vegetation
•Straw
•Sediment Ponds, Traps & Filters
•Treatment
•Sediment Pond (Temp. or Perm.)
•Water Truck
G N
- Silt fence installed around majority of site
perimeter; some silt fence near entrance removed to
work on frontage improvements, to be reinstalled at
end of work day
- Stormwater sump SE of construction entrance
- Subsurface drain installed under construction
entrance to divert water to sump
- Straw wattles N of entrance to divert water to sump
5. Stabilize Soils
•Nets & Blankets
•Mulch, Bark & Rock
•Hydroseeding; Grass
•Plastic Sheeting
•Straw Stockpiles
•Stockpiles
•PAM
F N - Much of site is paved
6. Protect Slopes
•Benching; Track-Walking
•Pipe Slope Drains
•Plastic Sheeting; Anchors
F N - Straw wattles in place to divert water away from
slopes along western perimeter
- Soil on slopes compacted
7. Protect Drain Inlets
•Catch Basin Inserts
•Gutter; Road
G N - CB inserts installed in offsite catch basins
8. Stabilize Channels and Outlets
•Channel Lining
•Check Dam
•Outlet Protection
•Nets and Blankets
- - N/A
9. Control Pollutants
•Chemical Storage Area Covered
•Concrete Handling
G N - Stormwater treated with dry ice to lower pH to
suitable levels
- Chemical/material storage onsite
10. Control Dewatering G N - Via KC Sewer Discharge Permit as needed
11. Maintain BMPs F N - Continue sweeping offsite roads
12.Maintain SWPPP & Site Logbook G N - Available upon request
13. Protect Low-Impact Development (LID BMPs)
•Bioretention Rain Garden Facilities
•Permeable Pavement
- - N/A
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 2 of 3 342
Time On Site Time Off Site Date Day of Week
11:25 11:45 10/13/21 Wednesday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
Monitoring, Records & Recommendations
Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
Current Weather: __49°F, Partly Cloudy_ _
Precipitation since last inspection (approximate): 0.35 inches
Precipitation in the last 24 hours (approximate): 0.10 inches
Type of Visit: Weekly Monthly Post–Storm Event
Phase of Active Construction (check all that apply):
Pre-Construction Clearing/Demo/Grading Infrastructure/Roads Concrete pours Vertical Construction
Utilities Offsite improvements Site temporarily stabilized Final Stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
•Record results in the table below.
•Hanna Turbidity Meter # _________
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of Discharge Notes
- - - - - -
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Inspector Name: Maggie Perme CESCL Number: ECO-3-4042106 Inspection Date: 10/13/21
CONSTRUCTION STORMWATER
GENERAL PERMIT – FIELD REPORT
Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
ESNW Rep. Project No. Page Report No.
MLP 0895.06 3 of 3 342
Time On Site Time Off Site Date Day of Week
11:25 11:45 10/13/21 Wednesday
NPDES Permit No. Reviewed
WAR307963
Project Name Job Location Client/Owner
Weatherly Inn 4500 Talbot Road S, Renton RJ Development, LLC
BMP LEGEND
JOB SHACK
STORMWATER VAULT
TEMPORARY SEDIMENT POND/TRAP
WATTLE
SILT FENCE
CONSTRUCTION ENTRANCE
SUBSURFACE DRAIN
CHEMICAL/MATERIAL STORAGE
CATCH BASIN INSERT
CONCRETE WASHOUT