HomeMy WebLinkAboutAdden 3AMENDMENT NO. 3 TO AGREEMENT FOR ARCHITECTURAL
SERVICES
THIS AMENDMENT, dated for reference purposes only as November 3, 2021, is by and between
the City of Renton (the City),a Washington municipal corporation, and Baylis Architects
(Consultant).The City and the Consultant are referred to collectively in this Amendment as the
Parties.Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG 19 019, dated
January 23, 2019, to provide necessary services for the Family First Community Center (referred
to herein as the Agreement);
Whereas, the Parties wish to amend the Agreement to change the scope of work, the time for
performance, and the compensation in order to address project document revisions due to the
delayed project schedule and to support donor recognition.
NOW THEREFORE, it is mutually agreed upon that CAG 19 019 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is as specified in Exhibit A 3, which is attached
and incorporated herein.
2.
3.Time of Performance:Section 3, Time of Performance is amended. All Work shall be
performed by no later than September 30, 2023.
4.Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $43,396.00 from $1,263,711.05 to
$1,307,107.05, plus any applicable state and local sales taxes. The additional
compensation shall be paidbasedupon Workactually performed according to the rate(s)
or amounts specified in Exhibit A 3, which is attached and incorporated herein.
5.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CAG-19-019, Adden #3-21
PAGE 2 OF 2
CITY OF RENTON
By:_____________________________
BAYLIS ARCHITECTS
By:____________________________
Armondo Pavone
Mayor
Enter Signers Name
Enter Signers Title
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Shane Moloney
City Attorney
Contract Template Updated 06/17/2021
Clb 11/5/21 177 folder 1
11/5/2021
President
11-10-2021
Approved by Cheryl Beyer via 11/5/2021 email
WEISMAN DESIGN GROUP INC, PS
LANDSCAPE ARCHITECTURE
206-322-1732
WWW.WDGINC.COM
August 17, 2021
Ms. Meredith Everist
Baylis Architects
10801 Main Street, Suite 110
Bellevue, WA 98004
Subject: Family First Community Center, Renton, Washington
Mechanical and Electrical Engineering Proposal ReBid
Dear Meredith:
We are pleased to see the Family First project once again going forward. We have had
the opportunity to review the MEP drawings and also to coordinate further with
Healthpoint.
On reviewing the mechanical schedules for the project, the project has been waiting long
enough that there are numerous equipment model changes (heat pumps and fans).
On the electrical side of things, the lighting fixture package has needed to be revisited.
Many of the fixtures currently scheduled are no longer available or their model numbers
have changed. We are in the process of coordinating this with lighting suppliers and will
update our drawings appropriately.
Also, the electrical Code governing this project has changed to the 2020 version of the
NEC. We will add the GFCI receptacles now required by that Code and review the plans
for compliance with the 2020 NEC.
Obviously none of the work described above was anticipated in our design fees, and
simply opening up the project again and repackaging it carries with it unanticipated
effort.
Thus we respectfully request that our fees for Construction Documents be increased by
$5,840.00 to accommodate this effort.
Meredith Everist
Family First Community Center
August 17, 2021
Page Two
If the preceding is satisfactory, please sign the signature block below and email a PDF of
this letter back to us. We have already begun the work.
We look forward to
interesting building.
Sincerely,
Sider + Byers Associates, Inc.
Nathan Byers, P.E.
Accepted this day of 2021
Baylis Architects
By Officer and Title
Copy: Russ Woodruff
1
Russ Woodruff
From:Meredith Everist <everistm@baylisarchitects.com>
Sent:Thursday, September 30, 2021 4:06 PM
To:Russ Woodruff
Cc:16-0996 Family First Community Center
Subject:FW: Family First CC - Add Services for Acoustics
HI Russ, Please see dialog below from Mohamed. Is it OK if I add this request to the letter I prepared previously or is it
too late?
thanks, Meredith
Meredith Everist | AIA | NOMA | LEED AP BD+C
Principal
Pronouns: she | her
10801 Main Street, # 110 | Bellevue, WA 98004
O: 425.454.0566 D: 425.679.5205 F: 425.453.8013
everistm@baylisarchitects.com | BaylisArchitects.com
Facebook | LinkedIn | Houzz
From:Mohamed Ait Allaoua <mohamed@a3acoustics.com>
Sent:Thursday, September 30, 2021 2:59 PM
To:Meredith Everist <everistm@baylisarchitects.com>
Subject:RE: Family First CC
Hi Meredith,
Thank you for the follow up regarding the billing for FFCC. As I mentioned on the phone, the review of the changes of
the mechanical system was not expected nor included in our original scope of work, and it is additional services. Our fee
is $1,540.00.
Thank you for all your support!
Mohamed
M OHAMED A IT A LLAOUA
M ANAGING P ARTNER
A 3 A COUSTICS , LLP
241 S. L ANDER S T , S UITE 200
S EATTLE , WA 98134
C. 206-551-5280 (PREFERRED ) | O. 206-792-7796
WWW .A 3 ACOUSTICS .COM
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless
you know the content is safe.
2
From:Meredith Everist <everistm@baylisarchitects.com>
Sent:Thursday, September 30, 2021 2:03 PM
To:Mohamed Ait Allaoua <mohamed@a3acoustics.com>
Subject:RE: Family First CC
Hi Mohamed, I am reviewing the billing for FFCC and wanted to check if you had any additional service request due to
the re start process or if the billing is within your original contract amount?
Thanks, Meredith
Meredith Everist | AIA | NOMA | LEED AP BD+C
Principal
Pronouns: she | her
10801 Main Street, # 110 | Bellevue, WA 98004
O: 425.454.0566 D: 425.679.5205 F: 425.453.8013
everistm@baylisarchitects.com | BaylisArchitects.com
Facebook | LinkedIn | Houzz
From:Mohamed Ait Allaoua <mohamed@a3acoustics.com>
Sent:Friday, August 6, 2021 2:55 PM
To:Carlos Herrera <Carlos@siderbyers.com>; Carter Howard <carter@a3acoustics.com>
Cc:Meredith Everist <everistm@baylisarchitects.com>
Subject:RE: Family First CC
Hi Carlos,
We will review the information that you sent, and get back to you if we have any questions.
Carter who is being copied will be in touch with you.
Thanks,
Mohamed
M OHAMED A IT A LLAOUA
M ANAGING P ARTNER
A 3 A COUSTICS , LLP
241 S. L ANDER S T , S UITE 200
S EATTLE , WA 98134
C. 206-551-5280 (PREFERRED ) | O. 206-792-7796
WWW .A 3 ACOUSTICS .COM
From:Carlos Herrera <Carlos@siderbyers.com>
Sent:Friday, August 6, 2021 2:06 PM
To:Mohamed Ait Allaoua <mohamed@a3acoustics.com>
Cc:Meredith Everist <everistm@baylisarchitects.com>
Subject:Family First CC
Hi Mohamed,
3
ERV 1 has been upsized to a larger unit and I have attached the new sound data for the unit. Our operating conditions
for the unit will be between the cyan blue and magenta data points based on the corresponding fan speed.
Best regards,
Carlos Herrera, P.E.
SIDER + BYERS
MECHANICAL + ELECTRICAL ENGINEERS
192 Nickerson St., Suite 300
Seattle, WA 98109
206-285-2966
carlos@siderbyers.com