Loading...
HomeMy WebLinkAboutMFP21005036.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21005036 IVR Number: 21005036 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:10/14/2021Application Date:3343900781Parcel Number: 2221 NE 28TH ST Permit Type:11/16/2021Issue Date:Franchise Permit Work Class:11/16/2022Expiration Date:Minor Utility Job Number: 593239347Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO RELOCATE EXISTING OH TRESSPASS SERVICE WITH BRIDLE AND SPAN GUY FROM EXISTING P01 (319161 166527) TO P02 (319161 166541) Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL AUSENHUS RACHEL 2412 W LAKE SAMMAMISH PKWY NE REDMOND , WA 98052 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 593239347 2221 NE 28TH ST Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 TYLER PUTERBAUGH TYLER.PUTERBAUGH@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21005036 Scott Warlick CED 11/16/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG P01P021616 1616NE 28TH STBLAINE AVE NE DAYTON AVE NE (PVT)RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREW20-7AW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'1616 NE 28TH ST88STOP FLAGGER STOP FLAGGER PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK W20-7AROADWORK AHEAD W20-1W20-4ONE LANEROADAHEADX'X'X'USE MAXIMUM AVAILABLESPACE FOR SIGNSW20-7AROAD WORK AHEAD W20-1BE PREPAR E D TO STOP W3-4100'100'100'NE 28TH STTEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV08/31/2021 59323934702217 NE 28th St, RentonFlaviana Nunes425-424-7809flaviana.rodriguesnunes@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP21005036 28112846 2854 2224 2834 2308 2301 2305 2300 2204 2216 2302 2221 2225 2205 2213 2217 DAYTON AVE NEBLAINE A V E N E DRIVENE 28TH ST DRIVEWAYHIG 15 319161-166527 50 kVA (C) 319162-166515 37.5 kVA (C) SLAP1929 319161-166541 50 kVA (C) SLAP1930 ROW 42 1Ø LEGACY - #4 CU Ø #4CUC #4CUCC#4CU SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map Thomas Guide page 626 Owner / Developer Contact Info officeATTN: SVETLANA GORBAN 2213 NE 28TH STREET RENTON WA 98056 SVETLANA GORBAN 206-755-1378 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: 1' = 50" ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. Mod OH Service Superior ORDER#NOTIF# PWR PROJECT PHASE CABLE TV PHONE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. UNDERGROUND MAP AND UNIVERSAL MAP 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. LRC: % V. Drop: % Flicker: 1190SQ 6KW 65A 0.9% 1.6% Sq. Footage: Actual Demand: 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Tyler Puterbaugh 206 407 9768 tyler.puterbaugh@pse.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'593239347THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Tyler Puterbaugh 206 407 9768 8/13/2021 Jun Son 253 281 2129 8/13/2021 Jun Son 253 281 2129 8/13/2021 RW - RENTON Gorban Residence Modified Overhead Service - Bridle Install 2217 NE 28TH STREET, RENTON WA 98056 N/A N/A N/A 593239347 As Noted 1 of 1 King County N/A N/A CSPSKEPM NE - 5 - 23 - 5 N/A N/A A2305E017 D2305E040 R2305E017 HIG-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 511429793 CIRCUIT FEET ADDED: 0' 00 1"2" 00 50'100' SITE SPECIFIC NOTES AT P01 to P02 - INSTALL 3/8" BRIDLE SPAN GUY 6024.1000; BSTPX - INSTALL MID-SPAN TAP AT BR1 P01 TO M01 - TRANSFER EXISTING SERVICES TO MIDSPAN TAP, SPLICE AND EXTEND SERVICE TO M01 593239347 MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, U-BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING 18" MIN 18" MIN24" MAX *FLASHING IN COURSES OF SHINGLES MINIMUM 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS OR STUDS WITH HOLEBORED FOR SNUG FIT 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS AND AGAINST ROOF SHEATHING RIGID STEEL CONDUIT STRUCTURALFRAMING AND FINISH MATERIALS STUD GROUND * ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH MAST HEIGHT BELOW 26" METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST SERVICE BRACKET WEATHERHEAD FLASHING FRONT VIEW GALVANIZED LAG-BOLT INTO FRAMING MEMBER HEAVY-WALL STRUT-TYPECHANNELHEAVY-WALL STRUT-TYPECHANNEL 18" MIN 24" MAX * SERVICE DROP DETAIL BLOCKING BETWEENMAST AND BUILDING 5/16" U-BOLTS2" x 6" BACKING SHIM METERBASE/SOCKET AND FASTEN WITHSCREWS FLUSH METERSOCKET GROUND RIGID STEEL STRUCTURALFRAMING AND FINISH MATERIALS 24" MAX * SERVICE DROP SERVICE BRACKET FLASHING MAST HEIGHT BELOW 26" METER FLUSH MOUNTED SERVICE DROP WEATHERHEAD MINIMUM 2' x 6" BETWEENRAFTERS WITH HOLE BORED FOR SNUG FIT RIGID STEEL CONDUIT UN-GUYED SERVICE MAST DETAIL SCALE: NONESERVICE LINE(UTILITY OWNED) 11' MIN 3-1/2' MIN 11' MIN 3'MIN DECK ROOFS WITH PERMANENT ACCESS ROOFS WITHOUT PERMANENT ACCESS ELECTRICMETER GAS METER OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL SCALE: NONE SERVICE LINE(UTILITY OWNED) SERVICE MAST CONNECTION POINT 26' 18' 12'13' STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY OVERHEAD SERVICE CLEARANCE DETAIL SCALE: NONE OVERHEAD BRIDLE SERVICE NOT TO SCALE Stephan Shaw 8/26/2021 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE Assumed Lot Corner CONDUIT VOLTAGE DROP VOLTAGE FLICKER ASBUILT INFORMATION SIZE LENGTH Design (ft) SIZE LENGTH Design (ft) BENDS Foreman - Complete FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable) P01 P02 3/8 SPANGUY 215 P01 M01 1/0 150 0.9 %1.6 % Taylor Paulsen 253-318-6897 9/7/21 MFP21005036 RESTORATION PER CITY OF RENTON STANDARDS