HomeMy WebLinkAboutMFP21005036.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21005036
IVR Number: 21005036
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:10/14/2021Application Date:3343900781Parcel Number: 2221 NE 28TH ST
Permit Type:11/16/2021Issue Date:Franchise
Permit Work Class:11/16/2022Expiration Date:Minor Utility
Job Number: 593239347Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO RELOCATE EXISTING OH TRESSPASS SERVICE WITH BRIDLE AND
SPAN GUY FROM EXISTING P01 (319161 166527) TO P02 (319161 166541)
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
AUSENHUS RACHEL 2412 W LAKE SAMMAMISH PKWY
NE
REDMOND , WA 98052
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
593239347
2221 NE 28TH ST
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
TYLER PUTERBAUGH TYLER.PUTERBAUGH@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21005036
Scott Warlick CED 11/16/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
P01P021616
1616NE 28TH STBLAINE
AVE
NE
DAYTON AVE NE (PVT)RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREW20-7AW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'1616 NE 28TH ST88STOP
FLAGGER
STOP
FLAGGER PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK FROM TOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
W20-7AROADWORK
AHEAD W20-1W20-4ONE LANEROADAHEADX'X'X'USE MAXIMUM AVAILABLESPACE FOR SIGNSW20-7AROAD
WORK
AHEAD W20-1BE
PREPAR
E
D
TO
STOP W3-4100'100'100'NE 28TH STTEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV08/31/2021 59323934702217 NE 28th St, RentonFlaviana Nunes425-424-7809flaviana.rodriguesnunes@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP21005036
28112846
2854
2224
2834
2308
2301 2305
2300
2204 2216
2302
2221
2225
2205
2213
2217 DAYTON AVE NEBLAINE
A
V
E
N
E
DRIVENE 28TH ST
DRIVEWAYHIG
15
319161-166527
50 kVA (C)
319162-166515
37.5 kVA (C)
SLAP1929
319161-166541
50 kVA (C)
SLAP1930
ROW 42
1Ø LEGACY - #4 CU
Ø
#4CUC
#4CUCC#4CU
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
Thomas Guide page 626
Owner / Developer Contact Info
officeATTN:
SVETLANA GORBAN
2213 NE 28TH STREET
RENTON WA 98056
SVETLANA GORBAN 206-755-1378
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SCALE: 1' = 50"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
Mod OH Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
CABLE TV
PHONE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
UNDERGROUND MAP AND UNIVERSAL MAP
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
LRC:
% V. Drop:
% Flicker:
1190SQ
6KW
65A
0.9%
1.6%
Sq. Footage:
Actual Demand:
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Tyler Puterbaugh
206 407 9768
tyler.puterbaugh@pse.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'593239347THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Tyler Puterbaugh 206 407 9768 8/13/2021
Jun Son 253 281 2129 8/13/2021
Jun Son 253 281 2129 8/13/2021
RW - RENTON
Gorban Residence
Modified Overhead Service - Bridle Install
2217 NE 28TH STREET, RENTON WA 98056
N/A N/A
N/A 593239347
As Noted 1 of 1
King County N/A N/A CSPSKEPM
NE - 5 - 23 - 5 N/A N/A
A2305E017 D2305E040 R2305E017 HIG-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
511429793
CIRCUIT FEET ADDED: 0'
00 1"2"
00 50'100'
SITE SPECIFIC NOTES
AT P01 to P02
- INSTALL 3/8" BRIDLE SPAN GUY 6024.1000; BSTPX
- INSTALL MID-SPAN TAP AT BR1
P01 TO M01
- TRANSFER EXISTING SERVICES TO MIDSPAN TAP, SPLICE AND EXTEND SERVICE TO M01
593239347
MAST HEIGHT BELOW 26"
METER SURFACE MOUNTED, U-BOLTS SECURE MAST
SERVICE BRACKET
WEATHERHEAD
FLASHING
18" MIN
18" MIN24" MAX *FLASHING IN COURSES
OF SHINGLES
MINIMUM 2" x 6" INSTALLEDSOLIDLY BETWEEN RAFTERS
OR STUDS WITH HOLEBORED FOR SNUG FIT
2" x 6" INSTALLEDSOLIDLY BETWEEN
RAFTERS AND AGAINST
ROOF SHEATHING
RIGID STEEL
CONDUIT
STRUCTURALFRAMING
AND FINISH
MATERIALS
STUD GROUND
* ADDITIONAL SUPPORT GUYS REQUIRED FOR ATTACHMENTS GREATER
THAN 24" ABOVE ROOFLINE OR IF SERVICE LINE EXCEEDS 100' IN LENGTH
MAST HEIGHT BELOW 26"
METER SURFACE MOUNTED, GALVANIZED LAG BOLTS SECURE MAST
SERVICE BRACKET
WEATHERHEAD
FLASHING
FRONT VIEW
GALVANIZED LAG-BOLT
INTO FRAMING MEMBER
HEAVY-WALL
STRUT-TYPECHANNELHEAVY-WALL
STRUT-TYPECHANNEL
18" MIN
24" MAX *
SERVICE DROP
DETAIL
BLOCKING BETWEENMAST AND BUILDING
5/16" U-BOLTS2" x 6" BACKING
SHIM METERBASE/SOCKET
AND FASTEN WITHSCREWS
FLUSH
METERSOCKET
GROUND
RIGID STEEL
STRUCTURALFRAMING AND
FINISH MATERIALS
24" MAX *
SERVICE DROP
SERVICE BRACKET
FLASHING
MAST HEIGHT BELOW 26"
METER FLUSH MOUNTED
SERVICE DROP WEATHERHEAD
MINIMUM 2' x 6" BETWEENRAFTERS WITH HOLE
BORED FOR SNUG FIT
RIGID STEEL CONDUIT
UN-GUYED SERVICE MAST DETAIL
SCALE: NONESERVICE LINE(UTILITY OWNED)
11' MIN
3-1/2' MIN
11' MIN
3'MIN
DECK
ROOFS WITH
PERMANENT ACCESS
ROOFS WITHOUT
PERMANENT ACCESS
ELECTRICMETER
GAS
METER
OVERHEAD SERVICE WIRE TO STRUCTURE CLEARANCE DETAIL
SCALE: NONE
SERVICE LINE(UTILITY OWNED)
SERVICE MAST
CONNECTION POINT
26'
18'
12'13'
STATE HIGHWAYS STREETS, ALLEYS, COUNTY ROADS,DRIVEWAYS, AND PARKING AREAS RESIDENTIAL PROPERTY
OVERHEAD SERVICE CLEARANCE DETAIL
SCALE: NONE
OVERHEAD BRIDLE SERVICE
NOT TO SCALE
Stephan Shaw 8/26/2021
SECONDARY CABLE & CONDUIT TABLE
LOCATION CABLE Assumed
Lot Corner
CONDUIT VOLTAGE
DROP
VOLTAGE
FLICKER ASBUILT INFORMATION
SIZE LENGTH
Design
(ft)
SIZE LENGTH
Design
(ft)
BENDS
Foreman - Complete
FROM TO (1/0,4/0,350)to Meter(ft)(in)90°45°22°11°(Percent)(Percent)Actual Amount Installed (Conduit & Cable)
P01 P02 3/8 SPANGUY 215
P01 M01 1/0 150 0.9 %1.6 %
Taylor Paulsen 253-318-6897 9/7/21
MFP21005036
RESTORATION PER CITY OF RENTON STANDARDS