HomeMy WebLinkAboutCO 5DocuSign Envelope ID: 4AAOE81C-CC99-48A8-82EA-DFE176CD8065 Public Works Facilities Division CAG-20-101, CO #5-21 CONTRACT NO: CAG-20-101 AMENDMENT No: CHANGE ORDER No: CONTRACT CHANGE ORDER (CO) PROJECT TITLE: Renton City Halt Phase 2 TO: McKinstry Essention LLC (CONTRACTOR) I-----";....... ________________ _ ! 5 The following mutually agreed to and Owner approved Change Order Proposal(s) are hereby incorporated by reference into the contract. CONSTRUCTION Description Deliver Old Generators to PW Yard Seimic Valve Replacement Replace Backtlow Preventer DHW Monitoring & Alarm Boiler Room Wall Repair -Exterior 1T Room Humidity Control Replace Belier Room Heat Exchanger Boiler Room GWB Repair -Interior Temp Generator �AU' upgraoes ll'Ortion not LontmgencyJ Subtotal Bond 1.1% Subtotal PROFESSIONAL SERVICES Design Construction Management OH&P Subtotal Construction/PS Subtotal Sales Tax GRAND TOTAL CONTRACT SUM: Amount s 1,050.75 s 1,582.75 1,472.00 s 2,432.00 s 23,448.23 s 495.00 s 7,193.00 7,335.96 s 20,882.52 !>Ul./L � 661393.93 730.33 $ 67,124.26 $ 1,677.48 $ 3,920.59 $ 11,950.52 $ 17,548.59 $ 84,672.85 $ 8,552.40 $ 93,225.25 0 NO CHANGE @ INCREASE 0 DECREASE } _o_F: _________________ ) _$ __ 93 __ ,_22_s_. 2_sl, (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: 0 NO CHANGE } 0 INCREASE □DECREASE amount covers OF: CALENDAR DAYS CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM PREVIOUS ADDITIONS/DELETIONS PREVIOUS TOTAL CHANGE AMOUNT THIS CHANGE ORDER $ $ $ $ REVISED CONTRACT TOTAL $ o) 130,115.00 2,407,491.00 2,537,606.00 93,225.25 2,630,831.25 Page 1 11/4/2021 Mayor Armondo Pavone 11-29-2021 ATTEST: Jason A. Seth, City Clerk Mayor Armondo Pavone 11-29-2021 Mayor Armondo Pavone 11-29-2021 Old Generator to Renton Yard Deliver generator to Renton Maintenance facility. Offload generator and set in requested spot. Provide and install new seismic shut-off valve Existing seismic shut-off valve is in poor condition and appears not to be operational. Replacement is recommended. This COP covers replacement of the seismic valve to match existing. Provide and install new seismic shut-off valve The existing reduced pressure back-flow device is leaking and starting to fail. This COP covers replacement of the reduced pressure back-flow device. Provide BAS Monitoring of DHW System Provide project management, design engineering, software programming, front end displays/graphics, installation, controls wiring, system check out, start up, testing, AutoCAD drawing documentation, & Owner verification assistance for the following scope: - Provide and install [Qty. 2] immersion temperature sensors and pipe wells to be added to the Domestic Hot Water System. - Provide additional programming for high/low temperature alarms. - Provide all control drawing submittals and as-built documentation. - Provide point-to-point checkout for each added DHW temperature sensor. TCC12 A/M2.5" Rebuild boiler room exterior wall The framed portion of the existing boiler room, exterior wall is damaged and not suitable for exterior exposure. Scope includes: - Demoltiion of existing wall sheathing and provide of new, exterior-rated wall (hardi-board finish). - Install 5/8” dens armour plus on interior boiler room walls, fire tape, no paint. - Install R-15 fiberglass batt insulation to match existing construction - Install ½” plywood sheathing on exterior of wall framing - Install Tyvek building wrap; Seal all edges with Dowsill 758; Vykor SAM at flashing edges/openings - Install primed metal flashings at top/bottom of wall connections - Install ½” plywood furring/rainscreen - Install Hardie panel siding, face nailed, with Fry Reglet at vertical joints - Caulk all edges where abutting existing concrete structure. Paint with Sherwin Williams Super Paint Exterior Acrylic. - Remove and reinstall controls enclosure. Dehumidification programming for IT Room 1) Add humidity control to the IT room sequence. 2) Sequence modifications: If the relative humidity is sensed to exceed 50% RH (variable), override the economizer cooling operation and revert to mechanical cooling by turning off the supply fan, shutting the relief and outside air dampers and energizing the split system units to operate to the design space temperature setpoint for (4) hours (variable). After 4 hours, the system operation goes back to the original sequence Replace boiler room heat exchanger Replace leaking heat exchanger in the boiler room. FA #1 Boiler Room GWB Repair 05/07/2021 05/07/2021 FA #2 Provide Temp Generator 05/13/21 05/14/21 FACP Mods not covered by Contingency The amount shown for 'FACP mods not covered by contingency is the difference between the total cost of the FACP work and the remaining contingency. Because the FACP work is additional scope being covered by contingency, the difference should be funded by addition owner funds. Total Cost - Remaining Cont = Additional Funds $35,807.95 - $35,108.29 = $627.66 Total Add = Const Cost + Prof Services $627.66 = $501.72 + $125.94