HomeMy WebLinkAboutMFP21005645.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21005645
IVR Number: 21005645
Permit Information
Permit Name: Century Link Permits
Address/Location:10/22/2021Application Date:Parcel Number: 4431 NE 4TH ST
Permit Type:12/03/2021Issue Date:Franchise
Permit Work Class:12/05/2022Expiration Date:Minor Utility
Job Number: N.878495Franchise Type:Telephone
Description: Century Link/Lumen to access MH700, Ped 12827 and 12811, overlash from P1 to P2 and trench 12' in the ROW.
Contacts
Name Address PhoneTypeBilling
Austin Sweeney
Century Link
Applicant
Dena Overaa
QWEST / Century Link
23315 66th Ave S
KENT, WA 98032
B: (206) 345-0173
C: (425) 247-6248
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Michael Smith
Dycom Industries dba North Sky
11818 SE Mill Plain Blvd, SUITE 410
Vancouver, WA 98684
C: (206) 305-5881Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
QWEST corp d/b/a CenturyLink QC
Austin Sweeney
253 766 7549
Austin.sweeney@centurylink.com
Northsky Communications 425 615 7121
NORTHSC857Q4 BL.028638
N.878495
4431 NE 4TH ST
CenturyLink/Lumen to access MH700, Ped 12827, Ped 12811, overlash from P1 to P2, and trench approx.
12'.
X X X X X
X 12
10/15/2021Austin Sweeney
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
Austin Sweeney
NBREMERTON AVE NE NE 4TH STBREMERTON AVE NENE 3RD LNNE 3RD LNANACORTES AVE NE
NE 2ND CTNE 2ND CTSPEEDLIMIT
25
TRAFFIC CONTROL PLAN
JOB # N.878495.C.45
PERMIT #
Date:7/18/21 Author:JORGIA DURR Project:N.878495.C.45LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
Legend
WORK TRUCK
CONES
FLAGGER
PEDESTAL
Work Area
ONE LANE TWO WAY TAPER 50' MIN/100' MAXCHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
NOT TO SCALE
Approved 7/18/21
Darlene Durr
TCS # 011915
Phone 253-737-5198
darlene.durr@hotmail.com
_______________________Darlene Durr
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #011915, darlene.durr@hotmail.com
ROADWORKAHEAD
ROADWORKAHEAD
ROADWORKAHEAD
BE PREPAREDTO STOP
BE PREPAREDTO STOP
ROADWORKAHEAD
ROADWORKAHEAD
BE PREPAREDTO STOP
ROADWORKAHEAD
BE PREPAREDTO STOP
SPEEDLIMIT
35
SPEEDLIMIT
35
350'
350'
200'
350'
350'
200'
200'
200'200'
200'
200'
PEDESTAL
12827
WORK AREA
12' X 80'
Comments:
THIS IS TO REPLACE PEDESTAL 12827 AND RESTORE AS REQUIRED
THIS IS A ONE LANE TWO WAY WITH FLAGGERS
FLAGGERS WILL ASSIST DRIVEWAYS AND PEDESTRIANS AT WORK AREA
BREMERTON AVE NE @ NE 3RD LN
REPLACE PEDESTAL 12827 / RESTORE
ONE LANE TWO WAY WITH FLAGGERS
www.invarion.com
NNE 4TH STBREMERTON AVE NENE 3RD LNNE 3RD LNSPEEDLIMIT
25
SPEEDLIMIT
35
DUVAL AVE NE
TRAFFIC CONTROL PLAN
JOB # N.878495.C.45
PERMIT #
Date:7/18/21 Author:JORGIA DURR Project:N.878495.C.45LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
Legend
WORK TRUCK
MANHOLE
Work Area
CONES
SPOTTER
ONE LANE TWO WAY TAPER 50' MIN/100' MAXCHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
NOT TO SCALE
Approved 7/18/21
Darlene Durr
TCS # 011915
Phone 253-737-5198
darlene.durr@hotmail.com
_______________________Darlene Durr
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #011915, darlene.durr@hotmail.com
Comments:
THIS IS TO ACCESS MH 700
THIS IS SHOULDER WORK AND EXIT CLOSURE
SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA
PARKING RESTRICTED AT WORK AREA
NOTIFY BUSINESSES PRIOR TO WORK
NE 4TH ST @ BREMERTON AVE NE
MH 700 ACCESS
SHOULDER WORK
EXIT CLOSURE
WORK AREA10' X 40'
MH 700
ROADWORKAHEAD
ROADWORKAHEAD
SHOULDERWORK
SHOULDERWORK
350'
350'
350'
350'
EXIT CLOSED
NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555
www.invarion.com
NBREMERTON AVE NE NE 4TH STBREMERTON AVE NENE 3RD LNNE 3RD LNANACORTES AVE NE
NE 2ND CTNE 2ND CTSPEEDLIMIT
25
TRAFFIC CONTROL PLAN
JOB # N.878495.C.45
PERMIT #
Date:7/18/21 Author:JORGIA DURR Project:N.878495.C.45LUMEN:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and City of RENTON requirements.
2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 48' X 48' B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum 11' for lane width.
6. Work hours will be ____am to ____pm.
Legend
CONES
PEDESTAL
WORK TRUCK
Work Area
SPOTTER
ONE LANE TWO WAY TAPER 50' MIN/100' MAXCHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
NOT TO SCALE
Approved 7/18/21
Darlene Durr
TCS # 011915
Phone 253-737-5198
darlene.durr@hotmail.com
_______________________Darlene Durr
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON TO
ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
DARLENE DURR, TCS #011915, darlene.durr@hotmail.com
ROADWORKAHEAD
ROADWORKAHEAD
ROADWORKAHEAD
ROADWORKAHEAD
SPEEDLIMIT
35
SPEEDLIMIT
35
350'
350'
200'
350'
200'200'
200'
Comments:
THIS IS TO ACCESS PEDESTAL 12811
THIS IS A LANE SHIFT, LEFT LANE CLOSURE
SPOTTER WILL ASSIST PEDESTRIANS AT WORK AREA
BREMERTON AVE NE @ NE 4TH ST
PEDESTAL 12811 ACCESS
LANE SHIFT
LEFT LANE CLOSURE
ROADWORKAHEAD
ROADWORKAHEAD
LEFT LANECLOSEDAHEAD
WORK AREA
10' X 240'
LANESHIFTAHEAD
200'
LANESHIFTAHEAD
LANESHIFTAHEAD
200'PEDESTAL
12811
350'
www.invarion.com
Date:10/11/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.878495 C.45CERT:TCS # 012843 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER)
Comments:
General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm.
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
TRAFFIC CONTROL PLAN
JOB # N.878495 C.45
PERMIT #
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 012843 sharon.martos@gmail.com
BREMERTON AVE NE @ NE 4TH ST
P1-P2 AERIAL
Comments:
PLACE AERIAL FIBER.
P1, EAST SIDE BREMERTON AVE NE, SOUTH OF
NE 4TH ST, NORTH TO P2, WEST SIDE BREMERTON AVE NE.
MOVING OPERATION WITH FLAGGERS.
FLAGGERS WILL HOLD ALL TRAFFIC FOR CROSSINGS.
UPO WILL ASSIST IN INTERSECTION.
FLAGGERS WILL ASSIST PEDESTRIANS.
N
SPEEDLIMIT
25
NOT TO SCALE
Sharon Martos
Project # N.878495 C.45Designed for LUMENSharon MartosApproved 10/11/2021Traffic Control SupervisorTCS # 012843Expires 5/31/2025Phone 253-737-5198sharon.martos@gmail.com
Legend
Flagger
Truck
P UPO
Work AreaROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 ROADWORKAHEADW20-1X
BREMERTON AVE NENE 3RD LNNE 4TH STDWY
DWY
DWYW20-7aBE PREPAREDTO STOPW20-7bROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 W20-7a100'100'
X BE PREPAREDTO STOPW20-7bBE PREPAREDTO STOP
W20-7bBE PREPAREDTO STOPW20-7bP1
P1
PW20-7aW20-7a
100'100'
350'
350'
350'
350'
www.invarion.com
Date:10/11/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.878495 C.45CERT:TCS # 012843 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER)
Comments:
General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm.
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
Legend
Cone
S Spotter
truck
Work Area
TRAFFIC CONTROL PLAN
JOB # N.878495 C.45
PERMIT #
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 012843 sharon.martos@gmail.com
BREMERTON AVE NE @ NE 4TH ST
PED 12811 - P2 TRENCH
Comments:
ACCESS PED 12811, WEST SIDE BREMERTON AVE NE,SOUTH OF NE 4TH ST AND TRENCH APPROX 5' TO P2.RIGHT LANE CLOSURE SB.LEFT LANE CLOSURE NB.SIDEWALK ACCESSIBLE.SPOTTER WILL ASSIST PEDESTRIANS.
N
SPEEDLIMIT
25
NOT TO SCALE
Sharon Martos
Project # N.878495 C.45Designed for LUMENSharon MartosApproved 10/11/2021Traffic Control SupervisorTCS # 012843Expires 5/31/2025Phone 253-737-5198sharon.martos@gmail.com ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 ROADWORKAHEADW20-1X
P2
PED 12811
S KEEPLEFTR4-8aRIGHT LANECLOSEDAHEADW20-5KEEPRIGHTR4-7aLEFT LANECLOSEDAHEADW20-5100'
100'
BREMERTON AVE NE
NE 3RD LNNE 4TH STDWY
DWY
DWY
www.invarion.com
Date:10/11/2021 Author:Sharon Martos, Traffic Control Supervisor Project:N.878495 C.45CERT:TCS # 012843 Designed for LUMEN:By: SHARON MARTOS (DO NOT ALTER)
Comments:
General Requirements1. All signs and spacing to conform to the MUTCD and CITY OF RENTONrequirements.2. Channelizing devices are 28" traffic cones with retroreflective material.3. All signs are 48" x 48" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum of 11' for lane width.6. Work hours will be ____am to ____pm.
ONE LANE TWO WAY TAPER 50' MIN/100' MAX
TRAFFIC CONTROL PLAN
JOB # N.878495 C.45
PERMIT #
CHANNELIZING DEVICE SPACING (FEET)
MPH TAPER TANGENT
50/70
35/45
25/30
40
40
30
20
80
60
UNLAWFUL FOR ANYONE OTHER THAN CITY OF RENTONTO ALTER THIS CERTIFIED TRAFFIC CONTROL PLANIN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:SHARON MARTOS, TCS# 012843 sharon.martos@gmail.com
BREMERTON AVE NE @ NE 4TH ST
PED 12827 - P1 TRENCH
Comments:
ACCESS PED 12827, WEST SIDE BREMERTON AVE NE,
SOUTH OF NE 4TH ST AND TRENCH APPROX 7' TO P1.
ONE LANE 2-WAY WITH FLAGGERS.SIDEWALK ACCESSIBLE.FLAGGERS WILL ASSIST PEDESTRIANS.
N
SPEEDLIMIT
25
NOT TO SCALE
Sharon Martos
Project # N.878495 C.45Designed for LUMENSharon MartosApproved 10/11/2021Traffic Control SupervisorTCS # 012843Expires 5/31/2025Phone 253-737-5198sharon.martos@gmail.com
Legend
Cone
Flagger
truck
Work AreaROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 ROADWORKAHEADW20-1X
P1
PED 12827
BREMERTON AVE NENE 3RD LNNE 4TH STDWY
DWY
DWYW20-7aBE PREPAREDTO STOPW20-7bBE PREPAREDTO STOPW20-7bROADWORKAHEADW20-1ROADWORKAHEAD
W20-1 W20-7a100'100'
100'
www.invarion.com
JOB: BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:”REVISION # SHEET # REASON FOR REVISION REVISED BY DATE4'8+5+10 4'8+5'921.'50'9#'4+#.64'0%*519016'5 56#6+10+0)5.TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.7900122000000NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTNVICINITY MAPSH OF %7561/'40#/'-';$#0-0#6+10#.#551%+#6+10.%10*1#0)7;'02*10'ÄÄEMAIL JQCAFAPIW[GP"MG[DCPMEQO241,'%6+&5#4/1414&54&545%12'1(914-21("/#0*1.'2.#%'0'9%17069+6*.4'Ä+0':+56+0)%10&7+6612'&'56#."2'&'56#.2.#%'0'952.+%'%#5'64'0%*+0&+46 2.#%'0'9%1706(+$'4+00'9%10&7+66121.'"21.'4+5'47221.'18'4.#5*0'9%1706(+$'461':+56+0)%122'46121.'"21.'4+5'4&1906*'064'0%*+0&+46 2.#%'0'9%1706(+$'4+00'9%10&7+6612'&'56#."2'&'56#.2.#%'1(0'9%1706(+$'4+0':+56+0)%10&7+661%7561/'45$7+.&+0)/212"%7561/'45/2122.#%'0'9'37+2/'06 6'4/+0#6'.4'Ä+0(&2/6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 06/10/2123N5E15N.878495W26226RNTNWA014431 NE 4TH STREETKENT, WA 9805913(+$'4'0)+0''4*#.';/#&5'02*10'01
Ä'/#+.JCNG[OCFUGP"NWOGPEQO4
TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L
B/C B/C B/C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONHT-CL-YRPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSJOB:RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTSH OF /6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQO(+$'4'0)+0''4*#.';/#&5'02*10'01
Ä'/#+.JCNG[OCFUGP"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 06/10/2123N5E15N.878495W26226RNTNWA014431 NE 4TH STREETKENT, WA 98059234
JOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSGEO CODE:WC CLLI:RNGE:SECT:NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTTOWN:016'(1470&'4)4170&#%6+8+6;6'56#0&8'06+.#6'/#0*1.'76+.+6;8#7.624+1461'064;2.#%'9#40+0)&'8+%'5#0&914-#4'#2416'%6+10#54'37+4'�&75'';'#0&*'#&5#('6;2416'%6+102'4('&'4#.56#6'#0&.1%#.4')7.#6+105/6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQO(+$'4'0)+0''4*#.';/#&5'02*10'01
Ä'/#+.JCNG[OCFUGP"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 06/10/2123N5E15N.878495W26226RNTNWA014431 NE 4TH STREETKENT, WA 9805933T EOP EOP EOP R/W R/W R/W EOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R
/W R/W R/W R/W R/W R
/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP 016'21("/#0*1.'2.#%'0'9%17069+6*.4'Ä+0':+56+0)%10&7+6612'&'56#.016'"%7561/'45/2122.#%'0'9'37+2/'06 6'4/+0#6'.4'Ä+0(&2016'"2'&'56#.2.#%'0'952.+%'%#5'64'0%*+0&+46 2.#%'0'9%1706(+$'4+00'9%10&7+66121.'016'"2'&'56#.2.#%'1(0'9%1706(+$'4+0':+56+0)%10&7+661%7561/'45$7+.&+0)/212 EOP 2'
21(./0/*
./02'&
/212
./02'&42'45'11'11'11'11'11'0'VJ564''65+&'9#.-5+&'9#.-SPEEDLIMIT$4'/'4610#8'0'5+&'9#.-5+&'9#.-SPEEDLIMIT33'26'12'11'11'0'VJ564''62#4%'.0'VJ564''62#4%'.0'VJ564''62#4%'.0'VJ564''62#4%'.8'8'0'0'VJ564''62#4%'.4016'"21.'4+5'47221.'18'4.#5*0'9%1706(+$'461':+56+0)%122'46121.'STATIONPSEPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHERPLACE NEW 2" RISER UP @ 20'-2"/OVERLASH29'-1" NEUTRAL HOA24'-0" 004 HOA21'-4" 005 HOA318080-16726521'-4"A13548607+071STATIONLUMENPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHEROVERLASH/PLACE NEW 2" RISER DOWN @ 26'-2"27'-1" LMN HOAA135485927'-1"9+072016'"21.'4+5'4&1906*'064'0%*+0&+46 2.#%'0'9%1706(+$'4+00'9%10&7+6612'&'56#.2.#06'4)4#&'51(6
#52*#.6 %10%4'6'574(#%'36"MIN64'0%*&'6#+.#64'0%*2.#%'/'061(%10&7+6Ä/+00656"MIN.%10&7+6
City of Renton
Public Works Department
This letter is requesting an Aerial Variance regarding a Lumen permit request to place fiber on job
N.878495. This job will provide Ethernet service to approximately 287 Lumen customers/potential
customers located in the immediate area of Bremerton Ave NE It will also prepare for any future growth
in this area.
These existing customers are currently being fed by copper cable and the most efficient and cost-
effective way to provide the customer fiber internet service is to distribute the fiber aerially. We will
access MH700 which is located on NE 4th St and then continue through existing duct to PED 12827, Riser
up Pole 318080-167265 crossing Bremerton Ave NE to Pole A154859, rise down to Ped 12811.
This will involve a total of 2 poles and will distribute aerial fiber capabilities throughout this area. If this
is acceptable to the City of Renton then we will proceed as planned, otherwise we will not be able to
provide this service to the customers as requested.
Thank You,
Haley Madsen
FTTB (CDFS)
Fiber planning / ENGII
Phone: 720/394/3609
Haley.madsen@Lumen.com
December 3, 2021
Haley Madsen
Qwest Corp d/b/a CenturyLink
23315 66th Ave S
Kent, WA 98032
Via Email: Haley.Madsen@lumen.com
SUBJECT: Request for Undergrounding Exemption (N.878495, MFP21005645, 4431 NE 4th St)
Dear Mrs. Madsen:
The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
CenturyLink proposes to have North Sky Communications overlash approximately 200 lineal feet of new
24-count aerial fiber to existing Puget Sound Energy (PSE) power poles along Bremerton Ave NE within
the City. See the enclosed Site Plan showing the proposed overlashing limits.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090. City of Renton
Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any
telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate
telecommunications facilities in, under, over or across any public way of the City, and to also provide
telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use
of such public ways from the City pursuant to Section 5-19-3 of this Chapter.”
CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a
blanket grant of authority, dating back to territorial times, and therefore has unique status as compared
to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink,
RCW Section 35.99.030 states that a city or town may not require a “master permit” from service
providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link
has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct
and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per
the RCW and Washington State Constitution, cable service is not a right granted without a franchise.
Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not
the provision of future cable.
In addition, staff considered RMC 4-6-090.D. which allows for exemptions due to technological difficulties;
when costs outweigh the general welfare consideration implicit in underground installation; or, if the
growth pattern of the area has not been sufficiently established to determine the ultimate service routes.
In this instance, the portion of the route proposed for aerial installation is in an area where cost to
underground one utility service will be cost prohibitive.
Century Link Job N.878495
Page 2 of 2
December 3, 2021
DECISION: The requested exemption from underground utility installation requirements RMC4-6-090 (C)
as requested by the applicant for the Project Reach is approved with conditions subject to the conditions
below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(i)(ii).
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Applicant’s cost, when any one of the following events occurs: (1)
any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case the Applicant shall
participate in the joint use trench installation for the purpose of undergrounding its aerial
lines, or (3) a conduit is made available within the Project Reach that will accommodate the
aerial lines. The new aerial lines must be undergrounded within one year, or approved
otherwise by the City, from the first event triggering the requirement to underground the
aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, December 17, 2021. Due to the
ongoing state of emergency enacted by Governor’s Proclamation 20-05, the City Clerk’s Office is working
remotely. For that reason, appeals must be submitted electronically to the City Clerk at
cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub only on Tuesdays and/or
Wednesdays. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future
date if your appeal is submitted electronically. Appeals to the Hearing Examiner are governed by RMC 4-
8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s
Office, cityclerk@rentonwa.gov.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Vanessa Dolbee, Planning Director
Justin Johnson, Assistant Development Engineering Manager
Scott Warlick, Engineering Specialist III
Holly Powers, Permit Technician
Austin Sweeney, CenturyLink Austin.Sweeney@centurylink.com
Franchise Permits
JOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSGEO CODE:WC CLLI:RNGE:SECT:NOTICE-NOT FOR DISCLOSURE OUTSIDE OF LUMEN AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTTOWN:016'(1470&'4)4170&#%6+8+6;6'56#0&8'06+.#6'/#0*1.'76+.+6;8#7.624+1461'064;2.#%'9#40+0)&'8+%'5#0&914-#4'#2416'%6+10#54'37+4'�&75'';'#0&*'#&5#('6;2416'%6+102'4('&'4#.56#6'#0&.1%#.4')7.#6+105/6.6&'0)+0''44+%-('4&+0#0&12*10'01
Ä'/#+.TKEMHGTFKPCPFQ"NWOGPEQO(+$'4'0)+0''4*#.';/#&5'02*10'01
Ä'/#+.JCNG[OCFUGP"NWOGPEQODRAFTED BY: MOUNTAIN LTD/SL 06/10/2123N5E15N.878495W26226RNTNWA014431 NE 4TH STREETKENT, WA 9805933T EOP EOP EOP R/W R/W R/W EOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R
/W R/W R/W R/W R/W R
/W R/W R/W EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W EOP EOP 016'21("/#0*1.'2.#%'0'9%17069+6*.4'Ä+0':+56+0)%10&7+6612'&'56#.016'"%7561/'45/2122.#%'0'9'37+2/'06 6'4/+0#6'.4'Ä+0(&2016'"2'&'56#.2.#%'0'952.+%'%#5'64'0%*+0&+46 2.#%'0'9%1706(+$'4+00'9%10&7+66121.'016'"2'&'56#.2.#%'1(0'9%1706(+$'4+0':+56+0)%10&7+661%7561/'45$7+.&+0)/212 EOP 2'
21(./0/*
./02'&
/212
./02'&42'45'11'11'11'11'11'0'VJ564''65+&'9#.-5+&'9#.-SPEEDLIMIT$4'/'4610#8'0'5+&'9#.-5+&'9#.-SPEEDLIMIT33'26'12'11'11'0'VJ564''62#4%'.0'VJ564''62#4%'.0'VJ564''62#4%'.0'VJ564''62#4%'.8'8'0'0'VJ564''62#4%'.4016'"21.'4+5'47221.'18'4.#5*0'9%1706(+$'461':+56+0)%122'46121.'STATIONPSEPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHERPLACE NEW 2" RISER UP @ 20'-2"/OVERLASH29'-1" NEUTRAL HOA24'-0" 004 HOA21'-4" 005 HOA318080-16726521'-4"A13548607+071STATIONLUMENPROPOSED HOAPOLE NUMBER(S) - LMN/PWR/OTHEROVERLASH/PLACE NEW 2" RISER DOWN @ 26'-2"27'-1" LMN HOAA135485927'-1"9+072016'"21.'4+5'4&1906*'064'0%*+0&+46 2.#%'0'9%1706(+$'4+00'9%10&7+6612'&'56#.2.#06'4)4#&'51(6
#52*#.6 %10%4'6'574(#%'36"MIN64'0%*&'6#+.#64'0%*2.#%'/'061(%10&7+6Ä/+00656"MIN.%10&7+6MFP21005645
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP21005645
Engineering
1 Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15'-6".
2 The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at the
Applicant’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case the
Applicant shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or
(3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial
lines must be undergrounded within one year, or approved otherwise by the City of Renton Community and
Economic Development Administrator or designee, from the first event triggering the requirement to underground
the aerial lines.
3 A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
4 Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
Page 1 of 1