Minor Franchise Permit: MFP21005825
IVR Number: 21005825
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:12/06/2021Application Date:0740900050Parcel Number: 18005 110TH AVE SE
Permit Type:12/07/2021Issue Date:Franchise
Permit Work Class:12/07/2022Expiration Date:Minor Utility
Job Number: 101144241Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO REMOVE EXISTING OH SECONDARY WIRE FROM P01 P04 AND
REPLACE WITH 1/0 OH TPX. CREW WILL RUN 2 PARALLEL RUNS FROM P01 TO P02 AND REPLACE SERVICE AT
P01.
Contacts
Name Address PhoneTypeBilling
Scott Warlick 1055 S Grady Way
Renton, WA 98057
Applicant
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Nathan Janders 2208 NE 27th St
Renton, WA 98056
Contact
Kristina TestContact
FERRY SCOTT LYLE+MOLLY LEIL 18005 110TH AVE SE
RENTON , WA 98055
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
101144241
18005 110TH AVE SE
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
JENNY CHAU JENNY.CHAU@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21005825
Scott Warlick CED 12/7/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
16161616P01P02P03SE 180TH ST110TH AVE SE
STOP
FLAGGER STOP
FLAGGER
W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4 100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7A100'STOP
FLAGGER RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARK TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV10/28/2021 101144241018005 110th Ave SE, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com1 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425MFP21005825
16161616P03P04SE 180TH ST110TH AVE SE
ROAD
CLOSED
AHEAD W20-3100'100'ROAD
WORK
AHEAD W20-1CREW SHALL SHIFT CONES ANDEQUIPMENT FOR EMERGENCYVEHICLES ACCESSRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROM TO
TOW AWAY AREA
PHONE 888-9999
INFRASOURCE LLC 000 0000000
NO PARKING
NO-PARKNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV10/28/2021 101144241018005 110th Ave SE, Renton, WAKali-Jamal Collins425-424-6425Kali-Jamal.Collins@pse.com2 OF 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21005825Maintain access forproperty owners
11005
18004
10925
10850
18001
10851
18012
18020
11012
10920
10930
10842
10834
10843
1083510827
10910
10902
10830
10803
10811
10819
10820
10810 110TH AVE SESE 180TH ST
SE 181ST ST
316381-166344
25 kVA (A)
316381-166328
SLAK4684 316380-166362
SLAK4685
316381-166308
15 kVA (A)
SLAT4863
316358-166344
25 kVA (A)
316358-166362
UNK (65T)
SLAK4680
316359-166313
25 kVA (A)
316359-166301
SLAK4682
316359-166328
25 kVA (A)
SLAK4681
316394-166362
SLAK4686
ROW
60'
ROW
30'
ROW
60'
TREE TRIMMING
18005
110TH AVE SEROW
60'
ROW
60'18005
SE 180TH ST
20'30'
10'
30'18'
12'
316380-166362
SLAK4685
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
47.4409, -122.1944
Owner / Developer Contact Info
officeATTN:
SCOTT FERRY
18005 110TH AVE SE
RENTON WA 98055
LARISSA EMERSON 206-376-2913
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
Wire Removal
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
108132924
101144242 512009351
108132923
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:JENNY CHAU
253-208-9480
JENNY.CHAU@PSE.COM
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
SCALE: 1" = 50'101144241 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
101144241
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
J. CHAU 253-208-9480 10/13/21
N. HARVILL 425-923-8944 10/13/21
N.HARVILL 425-923-8944 10/13/21
N/A RENTON
FERRY
RMV OH OPEN SEC, INSTALL NEW OH SEC AND NEW OH SVC
18005 110TH AVE SE RENTON WA 98055
N/A N/A
N/A 101144241
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
NE-32-23-5 N/A N/A
2305E125 2305E136 2305E125 PAN-15
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
511697255
UNDERGROUND CIRCUIT MAP
SCALE: N/A
SITE SPECIFIC NOTES
AT P01: 316380-166362
-EXISTING 40' 1959 UNK POLE TO REMAIN
-REMOVE SPOOL RACK
-INSTALL (1) INS 4" RIGID CLEVIS PER STD 6015.1000 (INDNRC)
-TRANSFER OH SVC TO NEW RIGID CLEVIS
AT P02: 316381-166344
-EXISTING 40' 1959 UNK POLE TO REMAIN
-REMOVE SPOOL RACK
-INSTALL (1) INS 4" RIGID CLEVIS PER STD 6015.1000 (INDNRC)
-TRANSFER OH SVC TO NEW RIGID CLEVIS
AT P03: 316381-166328
-EXISTING 40' 1959 UNK POLE TO REMAIN
-REMOVE SPOOL RACK
-INSTALL (1) INS 4" RIGID CLEVIS PER STD 6015.1000 (INDNRC)
-TRANSFER OH SVC TO NEW RIGID CLEVIS
AT P04: 316381-166308
-EXISTING 40' 1959 UNK POLE TO REMAIN
-REMOVE SPOOL RACK
-INSTALL (1) INS 4" RIGID CLEVIS PER STD 6015.1000 (INDNRC)
-TRANSFER OH SVC TO NEW RIGID CLEVIS
AT M01: EXISITNG METER BASE
-REMOVE 125A METER
AT M02: NEW METER BASE
-INSTALL 200A METER
SPAN SPECIFIC NOTES
P01 TO M01:
-REMOVE 1-RUN 1/0 OH TPX, ± 95’ ___' ACTUAL
P01 TO M02:
-INSTALL 1-RUN 4/0 OH TPX, ± 60’ ___' ACTUAL
P01 TO P02:
-REMOVE EXISTING OPEN WIRE SECONDARY ± 180', ACTUAL ___'
-INSTALL 2 PARALLEL RUNS 1/0 OH TPX, ± 180’ ___' ACTUAL
P02 TO P03:
-REMOVE EXISTING OPEN WIRE SECONDARY ± 170', ACTUAL ___'
P03 TO P04:
-REMOVE EXISTING OPEN WIRE SECONDARY ± 195', ACTUAL ___'
-INSTALL 1-RUN 1/0 OH TPX, ± 195’ ___' ACTUAL
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
PAN
15
JOB SITE
JOB SITE
JOB SITE
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PAN-15
9/3/21
239.00 212.00 207.00
1.07 0.00 0.00
240.07 212.00 207.00
00 1"2"
00 50'100'
CIRCUIT FEET ADDED:
SQ. FOOTAGE:
PANEL SIZE:
HEAT TYPE:
EST. DEMAND:
LRC:
% V. DROP:
% FLICKER:
0'
1240 SQ FT
200A
GAS
7.3kW
65A
2.5%
2.8%
SERVICE LINE
(UTILITY OWNED)
SERVICE MASTCONNECTION POINT
26' MIN
18' MIN
12' MIN 13'
STATE HIGHWAYS
COUNTY ROADS
OVERHEAD SERVICE CLEARANCE DETAIL
SCALE: NONE
STREETS, ALLEYS,
16' MIN
PARKING AREAS
DRIVEWAYS, AND
PROPERTY
NON-TRAFFIC
PROJECT SCOPE
REMOVE OPEN WIRE SECONDARY BETWEEN P01, P02, P03, AND P04. INSTALL NEW
SECONDARY WIRE FROM P02 TO P01 AND P04 TO P03. INSTALL NEW OH SVC FROM P01 AND
M02. TRIM BACK TREES WHERE REQUIRED
SVC Replacement
SVC Retirement
SITE PLAN
SCALE: 1" = 50'
MFP21005825RESTORATION PER CITY OF RENTON STANDARDS