HomeMy WebLinkAboutMFP21005827.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP21005827
IVR Number: 21005827
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:12/06/2021Application Date:7227801075Parcel Number: 2715 SUNSET LN NE
Permit Type:12/09/2021Issue Date:Franchise
Permit Work Class:12/09/2022Expiration Date:Minor Utility
Job Number: 105098695Franchise Type:Electric
Description: Puget Sound Energy Electric AT EXISTING J01 (318512 166685) CREW TO INSTALL 3PHASE LINE EXTENSION
ACROSS HARRINGTON AVE NE TO NEW PV1 (318504 166700). CREW WILL THEN INSTALL 3PHASE LINE EXT
ALONG NE SUNSET BLVD. RESTORATION PER CITY OF RENTON STANDARDS.
APPROVED WITH COMMENTS OR REDLINES.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
COLPITTS SUNSET LLC 2256 38TH PL E
SEATTLE , WA 98112
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
105098695
2715 SUNSET LN NE
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
TIN NGUYEN TIN.NGUYEN@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21005827
Scott Warlick CED 12/9/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
2020NE SUNSET BLVDN
E
S
U
N
S
E
T
B
L
V
DHARRINGTON AVE NE1011121110BUSSTOP10111211101111SUNSE
T
LN
NEHARRINGTON AVE NETHE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREAJ01STOP
FLAGGER
STO
P
FLAGGER
STOP
FLAGGER W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-410
0
'
10
0
'
10
0
'
W20-7A100'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-435
0
'
35
0
'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'ROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'PV1 SUNSET LN NEV0
1
10
10
99DETOURM4-9bDETOURM4-9b R9-11
S
IDEWALKCLOSEDAHEAD TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV11/09/2021 10509869502715 Sunset Lane NE, Renton, WA 98056 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com1 OF 4Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077MFP21005827
2020NE SUNSET BLVDN
E
S
U
N
S
E
T
B
L
V
DHARRINGTON AVE NE1011121110BUSSTOP10111211101111SUNSET
LN
NEHARRINGTON AVE NETHE CREW SHALL CEASEWORK FOR A FLAGGER/SPOTTERTO ESCORT PEDESTRIANSAROUND THE WORK AREAJ01STOP
FLAGGER
STOPFLAGGER
STOP
FLAGGER W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-410
0
'
10
0
'
10
0
'
W20-7A
ROADWORKAHEAD W20-1BEPREPAREDTOSTOPW3-435
0
'
35
0
'ROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4350'350'ROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD100'100'P
V
1 SUNSET LN NEV0
1 1010
99DETOURM4-9bDE
TO
UR
M4-9
b
R9-11
SI
D
EW
A
L
K
C
L
O
S
E
D
A
H
E
A
D Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV11/09/2021 10509869502715 Sunset Lane NE, Renton, WA 98056 Safaa Al Neema (425) 398-6077 safaa.alneema@pse.com2 OF 4Puget Sound EnergyTraffic Control Supervisor:Safaa Al NeemaCard No. 012611Card Exp. 10/31/2024Safaa.alneema@pse.com(425)398-6077TEMPORARY TRAFFIC CONTROL PLAN28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040MFP21005827
2020
NE SUNSET B
L
V
D
NE SU
N
S
E
T
B
L
V
D
HARRINGTON
AVE
NE171710
11
12
11
10
10
11
12
11
10
BUS
STOP NE
1
0
TH
S
T
NE SUNSET BLVD10
11
12
11
10
BU
S
ST
O
PBUS
STOP
1111 HARRING
TON
AVE
NE1111J01
ROADWORKAHEADW20-1
350'
ROAD
WORK
AHEAD W20-1100'
PV1
SUNSE
T
L
N
N
E
V011010ROADWORKAHEADW20-1100'ARRW-BRD
NE
1
0
TH
S
T
1111111212DETOURM4-9bDETOURM4-9b R9-11
SIDEWA
LKCLOSEDAHEAD R9-11SIDEWALKCLOSEDAHEADS/WCLOSEDR9-9RIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1350'350'350'ROADWORKAHEADW20-1100
'ROADWORKAHEADW
2
0
-
1
10
0
'
28" TRAFFIC CONE
TRAFFIC FLOW
SIGN LOCATION
LEGEND
VAULTVault
CHEVRON
ARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
TEMPORARY TRAFFIC CONTROL PLAN
N
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
11/09/2021
105098695
0
2715 Sunset Lane NE, Renton, WA 98056
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
3 OF 4
Puget Sound Energy
Traffic Control Supervisor:
Safaa Al Neema
Card No. 012611
Card Exp. 10/31/2024
Safaa.alneema@pse.com
(425)398-6077
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP21005827
2020
NE SUNSET B
L
V
D
NE SU
N
S
E
T
B
L
V
D
HARRINGTON
AVE
NE171710
11
12
11
10
10
11
12
11
10
BUS
STOP NE 1
0T
H
S
T
NE SUNSET BLVD10
11
12
11
10
BU
S
ST
O
PBUSSTOP
1111 HARRINGTON
AVE
NE1111J01ROADWORKAHEADW20-1
350'
ROAD
WORK
AHEAD W20-1100'
PV1
SUNSE
T
L
N
N
E
V011010ROADWORKAHEADW20-1100'
ARRW-BRD NE 1
0
TH
S
T
1111111212DETOURM4-9bDETOURM4-9b R9-11
SIDEWA
LKCLOSEDAHEAD R9-11SIDEWALKCLOSEDAHEADRIGHT LANECLOSEDAHEADW20-5RW4-2LROADWORKAHEADW20-1350'350'350'ROADWORKAHEADW20-110
0
'ROADWORKAHEADW
2
0
-
1
10
0
'S/WCLOSEDR9-9S/
W
CL
O
S
E
DR9-9TEMPORARY TRAFFIC CONTROL PLAN
N
28" TRAFFIC CONE
TRAFFIC FLOW
SIGN LOCATION
LEGEND
VAULTVault
CHEVRON
ARROW BOARD
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
11/09/2021
105098695
0
2715 Sunset Lane NE, Renton, WA 98056
Safaa Al Neema
(425) 398-6077
safaa.alneema@pse.com
4 OF 4
Puget Sound Energy
Traffic Control Supervisor:
Safaa Al Neema
Card No. 012611
Card Exp. 10/31/2024
Safaa.alneema@pse.com
(425)398-6077
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP21005827
2801
SUNSET LN NENE SUNSET BLVDHARRINGTON
AVE
NEROW60'ROW
60'
R
O
W
60
'
318503-130695
25 kVA 120/240V (A)
318512-166685
318508-166701
750 kVA 120/208V (ABC)
318527-166698
318503-166714
50 kVA 120/240V (A)
318496-166681
50 kVA 120/240V (A)
318488-166687
37.5 kVA 120/240V (A)
PROPOSED EASEMENT
INSIDE VAULT ROOM
318504-166700
J
J
J
J
318508-166701
750 kVA 120/208V (ABC)
FIELD
BEND
90°
R=48"
90°
R=48"±135'±180'±3
0
'
PSE INST.1-4" DB120
DISCONTINUOUS PVC CONDUIT
±230' IN CUST. PROVIDED TRENCH
PSE INST.1-4" DB120
DISCONTINUOUS PVC CONDUIT
±250' IN CUST. PROVIDED TRENCH
318512-166685 J
±75'
318508-166701
750 kVA 120/208V (ABC)
318512-166685
318504-166700
J
PSE INST. 1-RUN 3Ø PRI. 12KV
1/0 UG JKT CABLE ±230'
(AØEJA831)
(BØEJA832)
(CØEJA833)
PSE INST. 1-RUN 3Ø PRI. 12KV
1/0 UG JKT CABLE ±220'
(AØEJA834)
(BØEJA835)
(CØEJA836)
±75'±135'±180'±3
0
'HARRINGTON
AVE
NE
ROW
63'
37'
28'
5'S/WS/WEOPEOP5'
SUN
S
E
T
L
N
N
E
J
318512-166685
SITE PLAN
SCALE: 1" = 50'
JOB SITE
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE
WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET
SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
CROSSING/BORING.
-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT
REQUIREMENTS.
-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO
CONSTRUCTION.
-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION
WORK IN RIGHT OF WAY.
-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.
VAULTS & WORK PITS.
-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT J01
-REQUIRED TO PROVIDE 8' X 8' WORK PIT 10-1/3 CUBIC YARDS OF 6” CRUSHED ROCK AT PV1
-REQUIRED TO PROVIDE 11' X 11' WORK PIT 20 CUBIC YARDS OF 6” CRUSHED ROCK AT V01
TRENCHING & CONDUIT.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &
TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE
BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND
SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .
N
Vicinity Map
N/A
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
JOB SITE
ASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYER
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
POWER GENERAL NOTES - MULTIFAMILY PROJECT
11.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
10.
00 1"2"
00 50'100'
CIRCUIT FEET ADDED: 230'
SQ. FOOTAGE: 750 SQ FT
PANEL SIZE: 100A
HEAT TYPE: ELECTRIC
EST. DEMAND: 143kW
LRC: 65A
% V. DROP: 4.2% @ V01
% FLICKER: 0.8% @ V01
SITE SPECIFIC NOTES
AT J01: 318504-166700
- EXISTING VAULT & J-BOX TO REMAIN
- INSTALL (1) 200A, 4-POS JBOX (CU ID JBX15) MID: 7625900
- NOTE: THIS WILL BE A 4TH JBOX IN THE EXISTING
- TRANSFER EXISTING ELBOW, CBL TAG AØ-G704, TO NEW JBOX
- JUMPER FROM EXISTING AØ JBOX TO NEW JBOX
-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
AT PV1: 318505-166696
-INSTALL (1) HH 4'8" X 4'8" X 3'6" HH W/ GROUNDS PER STD 6045.5000 (SVSB20)
-INSTALL (1) COVER 4'8" SQ W/ 3' DOOR (7656400)
-INSTALL (3) 12kV 1/0 SOL. JACKETED STR SPLICE PER STD. 6041.2000 (SPL10J)
-INSTALL GRID #318505-166696
AT V01: 318508-166701
-CUSTOMER RESPONIBLE FOR TO MOVE XFMR INTO VAULT ROOM
-INSTALL (1) 750KVA 120/208v PADMOUNT TRF (MID: 6258300)
-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)
-INSTALL (12) 501 TO 750 KCMIL CONNECTOR LUGS (MID 7651003)
-INSTALL (48) MOUNTING BOLT KITS (MID 7651008)
-INSTALL GRID #318505-166696
-CONNECT 12-RUNS OF CUSTOMER OWNED, INSTALLED, & MAINTAINED 600kCMIL SVC
SPAN SPECIFIC NOTES
- SEE SITE PLAN, ONE-LINE DIAGRAMS, & TABLES FOR INSTALL
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
J01 PV1 4 1 250'1 --1/0AL JKT 230'EJA831 EJA832 EJA833 -
PV1 V01 4 1 230'1 --1/0AL JKT 220'EJA834 EJA835 EJA836
4" PVC (FT) & BENDS =480'2 0 0 0 1/0 AL JKT TOTAL (FT) =450'
Owner / Developer Contact Info
officeATTN:
ICAP EQUITY
3535 FACTORIA BLVD SE, STE 500
BELELVUE, WA 98006
JAMI STEVENSON 417-283-1076 105098695PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:TIN NGUYEN
253-437-6703
TIN.NGUYEN@PSE.COM
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. NGUYEN 253-437-6703 6/11/21
D. BRINKMANN 206-794-8599 11/7/21
S. FOX 714-893-2405 11/8/21
REQUIRED RENTON
SUNSET TERRACE
3Ø PRI LINE EXTENSION W/ NEW XFMR
2715 SUNSET LN NE, RENTON, WA 98056
N/A N/A
N/A 105098695
AS NOTED 1 OF 2
KING N/A N/A CSPSKEPM
NW 9-23N-05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
105098695511324286
OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
NEW CONDUIT DIAGRAM
NOT TO SCALE
NEW CABLE DIAGRAM
NOT TO SCALE
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
V01
318508-166701
750kVA
6258300
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-11
12/2020
224.00 231.00 260.33
6.98 6.98 6.98
230.98 237.98 267.31
UNDERGROUND CIRCUIT MAP
SCALE: NONEPARTIAL PLAN DETAIL
SCALE: 1" = 20'
FAULT CURRENT TABLE
3Ø PM TRANSFORMERS (208Y/120V)
120V WINDINGS 208V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 750kVA 0.1 --5.30 39,300 AMPS
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
2715 113 V01 12 600KCMIL
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
104339507511805822
3001644611511805826
3001644668511805891
3001644681511805893
3001644669511805896
Perm Service
"HSE" Meter
"Elevator" Meter
"105" Meter
"106" Meter
Conduit shall be installed
at a depth of 48" and
outside of the drip line of
the future street trees
MFP21005827
New HH to be
installed outside of
the drip line of the
future street trees.
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)105098695UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
T. NGUYEN 253-437-6703 6/11/21
D. BRINKMANN 206-794-8599 6/11/21
S. FOX 714-893-2405 6/11/21
REQUIRED RENTON
SUNSET TERRACE
3Ø PRI LINE EXTENSION W/ NEW XFMR
2715 SUNSET LN NE, RENTON, WA 98056
N/A N/A
N/A 105098695
AS NOTED 2 OF 2
KING N/A N/A CSPSKEPM
NW 9-23N-05E N/A N/A
2305E034 2305E040 2305E034 PRE-11
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'
8'
4'-8"
3'-6"
4'-8"
6"
VAULT & EXCAVATION DETAIL
Not to scale 6051.1500
3,600 lbs
1,300 - 1,365 lbs
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
J- BOX CABLE ENTRY DETAIL
Not to scale
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN
3'
MIN
Communications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS.
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
2"
Excavation - 20 cubic yards
10'-0"
7'-0"
8'-0"
8"
4'-2"
SIDE VIEW
4'-6"Crushed
6"
Rock
11'
11'
TOP VIEW
3'-6"
7'-0"
6045.5000Not to scale
VAULT & EXCAVATION DETAIL
MFP21005827