Loading...
HomeMy WebLinkAboutSurety - Bond Quantity Worksheet Final.pdfPlanning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200 Date Prepared: Name: PE Registration No: Firm Name: Firm Address: Phone No. Email Address: Project Name: Project Owner: CED Plan # (LUA):Phone: CED Permit # (U):Address: Site Address: Street Intersection:Addt'l Project Owner: Parcel #(s):Phone: Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NO Water Service Provided by: If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: 1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal Engineer Stamp Required (all cost estimates must have original wet stamp and signature) Clearing and Grading Utility Providers N/A Project Location and Description Project Owner Information Swanson Gardner Meyer Office Remodel Todd and Polly Gardner SITE IMPROVEMENT BOND QUANTITY WORKSHEET PROJECT INFORMATION CITY OF RENTON CITY OF RENTON 12/9/2021 Prepared by: PROJECT CLOSEOUTProject Phase 1 Sheri Murata 41846 Core Design Inc. 12100 NE 195th St, Suite #300, Bothell, WA 98011 425.885.7877 Abbreviated Legal Description: 3123059069 LUA19-000169 4512 Talbot Rd 425-226-7920 Renton, WA 980554512 Talbot Rd Talbot Road S and S 45th Place C190005266 Page 1 of 13 Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Unit Reference #Price Unit Quantity Cost Backfill & compaction-embankment ESC-1 6.50$ CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each Catch Basin Protection ESC-3 35.50$ Each 2 71.00 Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)95.00$ CY Ditching ESC-5 9.00$ CY Excavation-bulk ESC-6 2.00$ CY Fence, silt ESC-7 SWDM 5.4.3.1 1.50$ LF 259 388.50 Fence, Temporary (NGPE)ESC-8 1.50$ LF Geotextile Fabric ESC-9 2.50$ SY Hay Bale Silt Trap ESC-10 0.50$ Each Hydroseeding ESC-11 SWDM 5.4.2.4 0.80$ SY Interceptor Swale / Dike ESC-12 1.00$ LF Jute Mesh ESC-13 SWDM 5.4.2.2 3.50$ SY Level Spreader ESC-14 1.75$ LF Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50$ SY Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00$ SY Piping, temporary, CPP, 6"ESC-17 12.00$ LF Piping, temporary, CPP, 8"ESC-18 14.00$ LF Piping, temporary, CPP, 12"ESC-19 18.00$ LF Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00$ SY Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 1,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,200.00$ Each Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00$ Each Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 19.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 70.00$ LF Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00$ SY Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00$ SY Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00$ SY TESC Supervisor ESC-30 110.00$ HR 4 440.00 Water truck, dust control ESC-31 SWDM 5.4.7 140.00$ HR Unit Reference #Price Unit Quantity Cost 8.00$ LF 347 2,776.00 EROSION/SEDIMENT SUBTOTAL:3,675.50 SALES TAX @ 10%367.55 EROSION/SEDIMENT TOTAL:4,043.05 (A) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR EROSION & SEDIMENT CONTROL Description No. (A) Tree Protection Fence WRITE-IN-ITEMS Page 2 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost GENERAL ITEMS Backfill & Compaction- embankment GI-1 6.00$ CY Backfill & Compaction- trench GI-2 9.00$ CY Clear/Remove Brush, by hand (SY)GI-3 1.00$ SY Bollards - fixed GI-4 240.74$ Each Bollards - removable GI-5 452.34$ Each Clearing/Grubbing/Tree Removal GI-6 10,000.00$ Acre Excavation - bulk GI-7 2.00$ CY Excavation - Trench GI-8 5.00$ CY Fencing, cedar, 6' high GI-9 20.00$ LF Fencing, chain link, 4'GI-10 38.31$ LF Fencing, chain link, vinyl coated, 6' high GI-11 20.00$ LF Fencing, chain link, gate, vinyl coated, 20' GI-12 1,400.00$ Each Fill & compact - common barrow GI-13 25.00$ CY Fill & compact - gravel base GI-14 27.00$ CY Fill & compact - screened topsoil GI-15 39.00$ CY Gabion, 12" deep, stone filled mesh GI-16 65.00$ SY Gabion, 18" deep, stone filled mesh GI-17 90.00$ SY Gabion, 36" deep, stone filled mesh GI-18 150.00$ SY Grading, fine, by hand GI-19 2.50$ SY Grading, fine, with grader GI-20 2.00$ SY Monuments, 3' Long GI-21 250.00$ Each Sensitive Areas Sign GI-22 7.00$ Each Sodding, 1" deep, sloped ground GI-23 8.00$ SY Surveying, line & grade GI-24 850.00$ Day Surveying, lot location/lines GI-25 1,800.00$ Acre Topsoil Type A (imported)GI-26 28.50$ CY Traffic control crew ( 2 flaggers )GI-27 120.00$ HR Trail, 4" chipped wood GI-28 8.00$ SY Trail, 4" crushed cinder GI-29 9.00$ SY Trail, 4" top course GI-30 12.00$ SY Conduit, 2"GI-31 5.00$ LF Wall, retaining, concrete GI-32 55.00$ SF Wall, rockery GI-33 15.00$ SF 440 6,600.00 440 6,600.00 SUBTOTAL THIS PAGE:6,600.00 6,600.00 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) Page 3 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) ROAD IMPROVEMENT/PAVEMENT/SURFACING AC Grinding, 4' wide machine < 1000sy RI-1 30.00$ SY AC Grinding, 4' wide machine 1000-2000sy RI-2 16.00$ SY AC Grinding, 4' wide machine > 2000sy RI-3 10.00$ SY AC Removal/Disposal RI-4 35.00$ SY 40 1,400.00 40 1,400.00 Barricade, Type III ( Permanent )RI-5 56.00$ LF Guard Rail RI-6 30.00$ LF Curb & Gutter, rolled RI-7 17.00$ LF Curb & Gutter, vertical RI-8 12.50$ LF 44 550.00 44 550.00 Curb and Gutter, demolition and disposal RI-9 18.00$ LF Curb, extruded asphalt RI-10 5.50$ LF Curb, extruded concrete RI-11 7.00$ LF Sawcut, asphalt, 3" depth RI-12 1.85$ LF Sawcut, concrete, per 1" depth RI-13 3.00$ LF Sealant, asphalt RI-14 2.00$ LF Shoulder, gravel, 4" thick RI-15 15.00$ SY Sidewalk, 4" thick RI-16 38.00$ SY 155 5,890.00 155 5,890.00 Sidewalk, 4" thick, demolition and disposal RI-17 32.00$ SY 61 1,952.00 61 1,952.00 Sidewalk, 5" thick RI-18 41.00$ SY 22 902.00 22 902.00 Sidewalk, 5" thick, demolition and disposal RI-19 40.00$ SY 22 880.00 22 880.00 Sign, Handicap RI-20 85.00$ Each Striping, per stall RI-21 7.00$ Each Striping, thermoplastic, ( for crosswalk )RI-22 3.00$ SF Striping, 4" reflectorized line RI-23 0.50$ LF Additional 2.5" Crushed Surfacing RI-24 3.60$ SY HMA 1/2" Overlay 1.5" RI-25 14.00$ SY HMA 1/2" Overlay 2"RI-26 18.00$ SY HMA Road, 2", 4" rock, First 2500 SY RI-27 28.00$ SY 40 1,120.00 40 1,120.00 HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 21.00$ SY HMA Road, 4", 6" rock, First 2500 SY RI-29 45.00$ SY HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 37.00$ SY HMA Road, 4", 4.5" ATB RI-31 38.00$ SY Gravel Road, 4" rock, First 2500 SY RI-32 15.00$ SY Gravel Road, 4" rock, Qty. over 2500 SY RI-33 10.00$ SY Thickened Edge RI-34 8.60$ LF SUBTOTAL THIS PAGE:12,694.00 12,694.00 (B)(C)(D)(E) Page 4 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR STREET AND SITE IMPROVEMENTS Quantity Remaining (Bond Reduction) (B)(C) PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL-1 21.00$ SY 2" AC, 1.5" top course & 2.5" base course PL-2 28.00$ SY 4" select borrow PL-3 5.00$ SY 1.5" top course rock & 2.5" base course PL-4 14.00$ SY SUBTOTAL PARKING LOT SURFACING: (B)(C)(D)(E) LANDSCAPING & VEGETATION No. Street Trees LA-1 Median Landscaping LA-2 Right-of-Way Landscaping LA-3 Wetland Landscaping LA-4 SUBTOTAL LANDSCAPING & VEGETATION: (B)(C)(D)(E) TRAFFIC & LIGHTING No. Signs TR-1 Street Light System ( # of Poles)TR-2 Traffic Signal TR-3 Traffic Signal Modification TR-4 SUBTOTAL TRAFFIC & LIGHTING: (B)(C)(D)(E) WRITE-IN-ITEMS SUBTOTAL WRITE-IN ITEMS: STREET AND SITE IMPROVEMENTS SUBTOTAL:12,694.00 6,600.00 19,294.00 SALES TAX @ 10%1,269.40 660.00 1,929.40 STREET AND SITE IMPROVEMENTS TOTAL:13,963.40 7,260.00 21,223.40 (B)(C)(D)(E) Page 5 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D-1 26.00$ SY * (CBs include frame and lid) Beehive D-2 90.00$ Each Through-curb Inlet Framework D-3 400.00$ Each CB Type I D-4 1,500.00$ Each 1 1,500.00 1 1,500.00 CB Type IL D-5 1,750.00$ Each CB Type II, 48" diameter D-6 2,300.00$ Each 1 2,300.00 1 2,300.00 for additional depth over 4' D-7 480.00$ FT 3.58 1,718.40 3.58 1,718.40 CB Type II, 54" diameter D-8 2,500.00$ Each for additional depth over 4'D-9 495.00$ FT CB Type II, 60" diameter D-10 2,800.00$ Each for additional depth over 4'D-11 600.00$ FT CB Type II, 72" diameter D-12 6,000.00$ Each for additional depth over 4'D-13 850.00$ FT CB Type II, 96" diameter D-14 14,000.00$ Each for additional depth over 4'D-15 925.00$ FT Trash Rack, 12"D-16 350.00$ Each Trash Rack, 15"D-17 410.00$ Each Trash Rack, 18"D-18 480.00$ Each Trash Rack, 21"D-19 550.00$ Each Cleanout, PVC, 4"D-20 150.00$ Each 3 450.00 3 450.00 Cleanout, PVC, 6"D-21 170.00$ Each 1 170.00 1 170.00 Cleanout, PVC, 8"D-22 200.00$ Each Culvert, PVC, 4" D-23 10.00$ LF Culvert, PVC, 6" D-24 13.00$ LF 49 637.00 56 728.00 105 1,365.00 Culvert, PVC, 8" D-25 15.00$ LF Culvert, PVC, 12" D-26 23.00$ LF Culvert, PVC, 15" D-27 35.00$ LF Culvert, PVC, 18" D-28 41.00$ LF Culvert, PVC, 24"D-29 56.00$ LF Culvert, PVC, 30" D-30 78.00$ LF Culvert, PVC, 36" D-31 130.00$ LF Culvert, CMP, 8"D-32 19.00$ LF Culvert, CMP, 12"D-33 29.00$ LF SUBTOTAL THIS PAGE:4,655.40 2,848.00 7,503.40 (B)(C)(D)(E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Page 6 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, CMP, 15"D-34 35.00$ LF Culvert, CMP, 18"D-35 41.00$ LF Culvert, CMP, 24"D-36 56.00$ LF Culvert, CMP, 30"D-37 78.00$ LF Culvert, CMP, 36"D-38 130.00$ LF Culvert, CMP, 48"D-39 190.00$ LF Culvert, CMP, 60"D-40 270.00$ LF Culvert, CMP, 72"D-41 350.00$ LF Culvert, Concrete, 8"D-42 42.00$ LF Culvert, Concrete, 12"D-43 48.00$ LF Culvert, Concrete, 15"D-44 78.00$ LF Culvert, Concrete, 18"D-45 48.00$ LF Culvert, Concrete, 24"D-46 78.00$ LF Culvert, Concrete, 30"D-47 125.00$ LF Culvert, Concrete, 36"D-48 150.00$ LF Culvert, Concrete, 42"D-49 175.00$ LF Culvert, Concrete, 48"D-50 205.00$ LF Culvert, CPE Triple Wall, 6" D-51 14.00$ LF Culvert, CPE Triple Wall, 8" D-52 16.00$ LF Culvert, CPE Triple Wall, 12" D-53 24.00$ LF Culvert, CPE Triple Wall, 15" D-54 35.00$ LF Culvert, CPE Triple Wall, 18" D-55 41.00$ LF Culvert, CPE Triple Wall, 24" D-56 56.00$ LF Culvert, CPE Triple Wall, 30" D-57 78.00$ LF Culvert, CPE Triple Wall, 36" D-58 130.00$ LF Culvert, LCPE, 6"D-59 60.00$ LF Culvert, LCPE, 8"D-60 72.00$ LF Culvert, LCPE, 12"D-61 84.00$ LF Culvert, LCPE, 15"D-62 96.00$ LF Culvert, LCPE, 18"D-63 108.00$ LF Culvert, LCPE, 24"D-64 120.00$ LF Culvert, LCPE, 30"D-65 132.00$ LF Culvert, LCPE, 36"D-66 144.00$ LF Culvert, LCPE, 48"D-67 156.00$ LF Culvert, LCPE, 54"D-68 168.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 7 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) DRAINAGE (Continued) Culvert, LCPE, 60"D-69 180.00$ LF Culvert, LCPE, 72"D-70 192.00$ LF Culvert, HDPE, 6"D-71 42.00$ LF Culvert, HDPE, 8"D-72 42.00$ LF Culvert, HDPE, 12"D-73 74.00$ LF Culvert, HDPE, 15"D-74 106.00$ LF Culvert, HDPE, 18"D-75 138.00$ LF Culvert, HDPE, 24"D-76 221.00$ LF Culvert, HDPE, 30"D-77 276.00$ LF Culvert, HDPE, 36"D-78 331.00$ LF Culvert, HDPE, 48"D-79 386.00$ LF Culvert, HDPE, 54"D-80 441.00$ LF Culvert, HDPE, 60"D-81 496.00$ LF Culvert, HDPE, 72"D-82 551.00$ LF Pipe, Polypropylene, 6"D-83 84.00$ LF Pipe, Polypropylene, 8"D-84 89.00$ LF Pipe, Polypropylene, 12"D-85 95.00$ LF Pipe, Polypropylene, 15"D-86 100.00$ LF Pipe, Polypropylene, 18"D-87 106.00$ LF Pipe, Polypropylene, 24"D-88 111.00$ LF Pipe, Polypropylene, 30"D-89 119.00$ LF Pipe, Polypropylene, 36"D-90 154.00$ LF Pipe, Polypropylene, 48"D-91 226.00$ LF Pipe, Polypropylene, 54"D-92 332.00$ LF Pipe, Polypropylene, 60"D-93 439.00$ LF Pipe, Polypropylene, 72"D-94 545.00$ LF Culvert, DI, 6"D-95 61.00$ LF Culvert, DI, 8"D-96 84.00$ LF Culvert, DI, 12"D-97 106.00$ LF Culvert, DI, 15"D-98 129.00$ LF Culvert, DI, 18"D-99 152.00$ LF Culvert, DI, 24"D-100 175.00$ LF Culvert, DI, 30"D-101 198.00$ LF Culvert, DI, 36"D-102 220.00$ LF Culvert, DI, 48"D-103 243.00$ LF Culvert, DI, 54"D-104 266.00$ LF Culvert, DI, 60"D-105 289.00$ LF Culvert, DI, 72"D-106 311.00$ LF SUBTOTAL THIS PAGE: (B)(C)(D)(E) Page 8 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) Specialty Drainage Items Ditching SD-1 9.50$ CY Flow Dispersal Trench (1,436 base+)SD-3 28.00$ LF French Drain (3' depth)SD-4 26.00$ LF Geotextile, laid in trench, polypropylene SD-5 3.00$ SY Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,000.00$ Each Pond Overflow Spillway SD-7 16.00$ SY Restrictor/Oil Separator, 12"SD-8 1,150.00$ Each Restrictor/Oil Separator, 15"SD-9 1,350.00$ Each Restrictor/Oil Separator, 18"SD-10 1,700.00$ Each Riprap, placed SD-11 42.00$ CY Tank End Reducer (36" diameter)SD-12 1,200.00$ Each Infiltration pond testing SD-13 125.00$ HR Permeable Pavement SD-14 Permeable Concrete Sidewalk SD-15 Culvert, Box __ ft x __ ft SD-16 SUBTOTAL SPECIALTY DRAINAGE ITEMS: (B)(C)(D)(E) STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch) Detention Pond SF-1 Each Detention Tank SF-2 Each Detention Vault SF-3 Each Infiltration Pond SF-4 Each Infiltration Tank SF-5 Each Infiltration Vault SF-6 Each Infiltration Trenches SF-7 Each Basic Biofiltration Swale SF-8 Each Wet Biofiltration Swale SF-9 Each Wetpond SF-10 Each Wetvault SF-11 Each Sand Filter SF-12 Each Sand Filter Vault SF-13 Each Linear Sand Filter SF-14 Each Proprietary Facility SF-15 Each Bioretention Facility SF-16 Each SUBTOTAL STORMWATER FACILITIES: (B)(C)(D)(E) Page 9 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR DRAINAGE AND STORMWATER FACILITIES Quantity Remaining (Bond Reduction) (B)(C) WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs) Splash Block WI-1 150.00$ each 2 300.00 2 300.00 WI-2 WI-3 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 WI-10 WI-11 WI-12 WI-13 WI-14 WI-15 SUBTOTAL WRITE-IN ITEMS:300.00 300.00 DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:4,655.40 3,148.00 7,803.40 SALES TAX @ 10%465.54 314.80 780.34 DRAINAGE AND STORMWATER FACILITIES TOTAL:5,120.94 3,462.80 8,583.74 (B) (C) (D) (E) Page 10 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Connection to Existing Watermain W-1 2,000.00$ Each Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 50.00$ LF 26 1,300.00 26 1,300.00 Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 56.00$ LF Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 60.00$ LF Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 70.00$ LF Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 80.00$ LF Gate Valve, 4 inch Diameter W-7 500.00$ Each Gate Valve, 6 inch Diameter W-8 700.00$ Each Gate Valve, 8 Inch Diameter W-9 800.00$ Each Gate Valve, 10 Inch Diameter W-10 1,000.00$ Each Gate Valve, 12 Inch Diameter W-11 1,200.00$ Each Fire Hydrant Assembly W-12 4,000.00$ Each Permanent Blow-Off Assembly W-13 1,800.00$ Each Air-Vac Assembly, 2-Inch Diameter W-14 2,000.00$ Each Air-Vac Assembly, 1-Inch Diameter W-15 1,500.00$ Each Compound Meter Assembly 3-inch Diameter W-16 8,000.00$ Each Compound Meter Assembly 4-inch Diameter W-17 9,000.00$ Each Compound Meter Assembly 6-inch Diameter W-18 10,000.00$ Each Pressure Reducing Valve Station 8-inch to 10-inch W-19 20,000.00$ Each WATER SUBTOTAL:1,300.00 1,300.00 SALES TAX @ 10%130.00 130.00 WATER TOTAL:1,430.00 1,430.00 (B) (C) (D) (E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR WATER Quantity Remaining (Bond Reduction) (B)(C) Page 11 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.d WATER Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 CED Permit #:C190005266 Existing Future Public Private Right-of-Way Improvements Improvements (D) (E) Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost Clean Outs SS-1 1,000.00$ Each Grease Interceptor, 500 gallon SS-2 8,000.00$ Each Grease Interceptor, 1000 gallon SS-3 10,000.00$ Each Grease Interceptor, 1500 gallon SS-4 15,000.00$ Each Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 80.00$ LF Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 95.00$ LF Sewer Pipe, PVC, 8 inch Diameter SS-7 105.00$ LF Sewer Pipe, PVC, 12 Inch Diameter SS-8 120.00$ LF Sewer Pipe, DI, 8 inch Diameter SS-9 115.00$ LF Sewer Pipe, DI, 12 Inch Diameter SS-10 130.00$ LF Manhole, 48 Inch Diameter SS-11 6,000.00$ Each Manhole, 54 Inch Diameter SS-13 6,500.00$ Each Manhole, 60 Inch Diameter SS-15 7,500.00$ Each Manhole, 72 Inch Diameter SS-17 8,500.00$ Each Manhole, 96 Inch Diameter SS-19 14,000.00$ Each Pipe, C-900, 12 Inch Diameter SS-21 180.00$ LF Outside Drop SS-24 1,500.00$ LS Inside Drop SS-25 1,000.00$ LS Sewer Pipe, PVC, ____ Inch Diameter SS-26 Lift Station (Entire System)SS-27 LS SANITARY SEWER SUBTOTAL: SALES TAX @ 10% SANITARY SEWER TOTAL: (B) (C) (D) (E) SITE IMPROVEMENT BOND QUANTITY WORKSHEET FOR SANITARY SEWER Quantity Remaining (Bond Reduction) (B)(C) Page 12 of 13 Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021 Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200 Date: Name:Project Name: PE Registration No:CED Plan # (LUA): Firm Name:CED Permit # (U): Firm Address:Site Address: Phone No.Parcel #(s): Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a) Existing Right-of-Way Improvements Subtotal (b)(b)13,963.40$ Future Public Improvements Subtotal (c)-$ Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)8,583.74$ (e) (f) Site Restoration Civil Construction Permit Maintenance Bond 4,509.43$ Bond Reduction 2 Construction Permit Bond Amount 3 Minimum Bond Amount is $10,000.00 1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering. 2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will cover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering. * Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton. ** Note: All prices include labor, equipment, materials, overhead and profit. 425.885.7877 Swanson Gardner Meyer Office Remodel LUA19-000169 4512 Talbot Rd 3123059069 PROJECT CLOSEOUT C190005266 12100 NE 195th St, Suite #300, Bothell, WA 98011 10,000.00$ P (a) x 100% SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS 12/9/2021 Sheri Murata 41846 Core Design Inc. R ((b x 150%) + (d x 100%)) S (e) x 150% + (f) x 100% Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2 Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2 T (P +R - S) Prepared by:Project Information CONSTRUCTION BOND AMOUNT */** (prior to permit issuance) EST1 ((b) + (c) + (d)) x 20% 33,980.10$ MAINTENANCE BOND */** (after final acceptance of construction) 4,043.05$ 13,963.40$ 38,112.58$ 4,043.05$ 22,653.40$ 17,167.48$ -$ Page 13 of 13 Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET Unit Prices Updated: 06/14/2016 Version: 04/26/2017 Printed 12/9/2021