Loading...
HomeMy WebLinkAboutMFP21006116DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21006116 IVR Number: 21006116 Permit Information Permit Name: Century Link Permits Address/Location:12/22/2021Application Date:3343301105Parcel Number: 4800 LAKE WASHINGTON BLVD NE Permit Type:12/22/2021Issue Date:Franchise Permit Work Class:12/22/2022Expiration Date:Minor Utility Job Number: N.948351Franchise Type:Telephone Description: Century Link/Lumen to access HH UN26, place conduit in open trench and replace 1 ped. Restoration per City of Renton standard. Contacts Name Address PhoneTypeBilling Dena Overaa QWEST / Century Link 23315 66th Ave S KENT, WA 98032 B: (206) 345-0173 C: (425) 247-6248 Applicant Austin Sweeney Century Link Applicant Kim Parker QWest Corporation 931 14th St, Suite 1000A Denver, CO 80202 B: (303) 992-0752Contact Michael Smith Dycom Industries dba North Sky 11818 SE Mill Plain Blvd, SUITE 410 Vancouver, WA 98684 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 7850 S TRAFTON St TACOMA, WA 98409 Specialized Billing X General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date QWEST corp d/b/a CenturyLink QC Austin Sweeney 253 766 7549 Austin.sweeney@centurylink.com Northsky Communications 425 615 7121 NORTHSC857Q4 BL.028638 4800 Lake Washington Blvd NE N.948351 CenturyLink/lumen to access HH UN26, place conduit in open trench, and replace 1 ped. Please expedite if possible. X X X X 12/16/21Austin Sweeney Nathan Janders CED 12/22/2021 DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 11/25/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 11/25/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.☐ A copy of the Traffic Control Plan (TCP) Application form. 2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ☐Include map(s) showing the location of the project and work area. ☐Be legible lettering and clear, contrasting, symbols of viewing or printing. ☐Must indicate street names, and north arrow and scale. ☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ☐Types of plans required: ☐Work hour plan – show all mobility impacts during construction hours. ☐Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ☐Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ☐Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering N.948351 4800 Lake Washington Blvd NE 1/13 2/13 8:00 am 3:00 pm CenturyLink/Lumen to access HH UN-26, place conduit in open trench, and replace 1 pedestal. Northsky Communications LLC.425 615 7121 Austin Sweeney Austin.sweeney@centuryLink.com 23315 66th Ave S Kent 98032 12/22/2021 MFP21006116 Nathan Janders CED Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 11/25/2019 APPLICANT AGREES TO ALL THE FOLLOWING: •TCP must be approved prior to commencing the work, and all permit conditions shall be met. •Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. •Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Approved Temporary TCP must be at the work site during work hours. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. •The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date Austin Sweeney Austin Sweeney 12/16/21 MOT-61 SCALE IN FEET 0 50 100 S E 7 6 T H STSB I-405 NB I-405 LINE LW LANE 10'10' LANE PAVEMENT TEMP LW 13+00 LW 20+43 LINE LW LANE 11'11' LANE SHLD TURN SHLD 2' LANE 11' C. CAMERON J. DRAGO S. STUART 5' MIN NB405-NE44 LINE 690+00 TO LW LINE 23+00 STAGE 1, PHASE 2 TRAFFIC CONTROL PLAN - MG1-2-3 FENCE PEDESTRIAN EXIST LAKE WASHINGTON BLVD NE N E 44 T H S T WORK AREA 1.5:1 CURVE DATA P.I. STATION DELTA RADIUS TANGENT LENGTHNo. 19°01'01" LT 211.78 35.47'70.29' 11°18'01" RT 240.00'23.74'47.33' 60.26'30.38'18°01'13" RT 191.59' 19°10'59" RT 250.00'42.25'83.70' 1067.38'126.11'251.06' 1 2 3 4 5 LW 11+27.89 LW 11+93.08 LW 13+31.39 LW 15+36.63 LW 21+39.72 13°28'36" RT 5' MIN FENCE PEDESTRIAN WORK AREA TANGENTTAPER DEVICE SPACING (feet) MAXIMUM CHANNELIZATION MPH 25/30 35/45 20 40 30 60 SSREV 0 - RELEASED FOR CONSTRUCTION SEE NOTE 6 SHEET MOT-N02 1' MIN * *1 6/26/20 SS7/2/20REV 1 - ADD DIMENSION AND NOTE 7/22/20 SS 2 2 K-80.35-00 TO PEDESTRIAN ROUTE PER ANCHOR BARRIER ADJACENT K-80.35-00 TO PEDESTRIAN ROUTE PER ANCHOR BARRIER ADJACENT REV 2 - REV DIMENSION, ADD NOTE, PAGE NUMBER 2 FOR SECTION 76 1+59, SEE MOT-62 FOR TRAFFIC CONTROL NOTES, SEE SHEET MOT-N02 2 2 2NB405-NE44 LI NE 690+00MATCH LINE SEE SHEET MOT-27LW LINE 23+00MATCH LINE SEE SHEET MOT-622 2 1'1' 5710 7700 7695 7705 101 2 1 2 0 11 700 690 50 55 60 25 20GEOSYNTHETIC WALL 07.46R CIP WALL 07.65R CIP WALL 07.65IR (2) CIP WALL 07.52R CIP WALL 07.61R C IP WALL 07.60R CIP WALL 07.59R CI P WALL 0 7.5 7 R12 22 1 11 12 +UOBJCT ? UOBJCT UOBJCT ??? ??MB UOBJCT ??UOBJCT UOBJCT ???UOBJCT UOBJCT ????????U UUUUUUU UUUU UUUUU U U U UUUCCCC CPP PPPPP5' CLF 3' CLF WWWP S S DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM. FILE NAME TIME DATE 7/22/2020 c:\users\sstuart\documents\projectwise\workingdir\wsdot\dms08389\XL5467_PS_TC_28.dgn REVISION BY SHEET OF SHEETS LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH10PLOTTED BY DATE SStuart 12:30:12 PM Washington State Department of Transportation P.E. STAMP BOX DATE P.E. STAMP BOX DATE PLAN REF NO AND EXPRESS TOLL LANES PROJECT I-405; RENTON TO BELLEVUE WIDENING J. LEFOTU K. HENRY C9242 XL5467 TEMPORARY CONCRETE BARRIER WORK AREA (LONG TERM) WORK AREA (SHORT TERM) TEMPORARY PAVEMENT TRAFFIC SAFETY DRUM TEMPORARY IMPACT ATTENUATOR DIRECTION OF TRAFFIC LEGEND PORTABLE CHANGEABLE MESSAGE SIGN OR OR PCMS PEDESTRIAN FENCE SIGN SYMBOL (EXIST LOCATION) (PROPOSED LOCATION)10 PEDESTRIAN CHANNELIZING DEVICE TEMPORARY SIGN (BARRIER MOUNTED) TEMPORARY SIGN (POST MOUNTED) WITH OFFSET BRACKET) TEMPORARY SIGN (BARRIER MOUNTED 10 15 200 5 W20-1 48" 48" AHEAD WORK ROAD±2 0 0' ± 2 0 0' W20-1 48" 48" AHEAD WORK ROAD ± 25 0' 24" 12" R9-11A(L) CROSS HERE SIDEWALK CLOSED W20-1 48" 48" AHEAD WORK ROAD 24" R9-9 12"CLOSED SIDEWALK 24" R9-9 12"CLOSED SIDEWALK 24" R9-9 12"CLOSED SIDEWALK BEGIN WHITE EDGE LINE 10 + 92.41 P C 11+62.71PRC 12 +22.96 P T 1 2 3 41 3 +5 4. 9 8PT 24" R9-9 12"CLOSED SIDEWALK 9+99.59 LW 22+29.59 NE44 =1 4 +9 4. 3 9PCFLARE12:1 END YELLOW DOUBLE CENTERLINE (10.6' RT) 14+89 LW POT R=56 'FLARE12:1 13+07.64 P C 14+31 LW POT (17.6' RT) END WHITE EDGE LINE (21.6' RT)15+78.09PT10+99 LW POC MATCH EXISTING 12+46 LW POT 10' 10' R=700' 11' BEGIN WIDE LANE LINE (0.0' RT) BEGIN YELLOW DOUBLE CENTERLINE (11.0' RT) 19+68 LW POT 11' 20+43 LW POC (0.0' LT) END WIDE LANE LINE 21+25 LW POC (0.0' RT)20+13.60PC22+64.66PTBEGIN YELLOW DOUBLE CENTERLINE CENTERLINE PT YELLOW DOUBLE 5 22+64.66 LW PT (0.0' RT) 20+93 LW POC PC YELLOW DOUBLE CENTERLINE (7.4' RT) PC WHITE EDGE LINE 18+99 LW POT (22.9'À RT) 19+07 LW POT (22.9' RT) 0+56 76 POT AS REQUIRED TO MAINTAIN DRIVEWAY ACCESS PROVIDE 2' CLEARENCE FROM EDGE LINE AND FIELD LOCATE TRAFFIC SAFETY DRUMS TO PT WHITE EDGE LINE 20+41 LW POC (25.0' RT) 20+24 LW POC (22.0' RT) 0+82 76 POT (13.0' LT) PC WHITE EDGE LINE 1+19 76 POT (13.0' LT) BEGIN WHITE EDGE LINE DOUBLE CENTERLINE BEGIN YELLOW 2+38 76 POT WHITE EDGE LINE (13.0' RT) YELLOW DOUBLE CENTERLINE (0.0' RT) 3+38 76 POT END WHITE EDGE LINE (25.2' RT) YELLOW DOUBLE CENTERLINE (0.0' RT, 11.6 RT) 10' DOUBLE CENTERLINE BEGIN YELLOW 13+55 LW (0.0' RT) CONCRETE BARRIER END TEMP TEMP CONCRETE BARRIER (12.0' RT) WHITE EDGE LINE (10.0' RT) 1+59 76 POT (17' RT) ROUTE PEDESTRIAN TEMP ROUTE PEDESTRIAN TEMP BEGIN TEMP CONCRETE BARRIER BEGIN TEMP CONCRETE BARRIER (17' LT) PT WHITE EDGE LINE (13' RT) END TEMP CONCRETE BARRIER BEGIN TEMP CONCRETE BARRIER ROUTE PEDESTRIAN TEMP 11'2' 11+38 LW POC 15.8' RT BEGIN WHITE EDGE LINE (15.1' RT) BEGIN YELLOW DOUBLE CENTERLINE (0.0' RT) 10+78 LW POT 0+69 76 POT (0.0' LT) 15+05 LW POC TEMP CONCRETE BARRIER (12.0' LT) WHITE EDGE LINE (10.0' LT) 14+31 LW POT R=40' END TEMP CONCRETE BARRIER (14.8' LT) END WHITE EDGELINE (10.0' LT) MATCH EXIST BEGIN WHITE EDGE LINE MATCH EXIST END DOUBLE CENTERLINE MATCH EXIST 4+38 76 POT (11.6' RT) 14+77 LW POT PC YELLOW DOUBLE CENTERLINE (0.0' RT) BEGIN TEMP CONCRETE BARRIER (16.5' LT) WHITE EDGE LINE (12.8' LT) 10+35 LW POT (32.3' LT) MATCH EXIST RENTON STD PLAN 128 CROSSWALK PER CITY OF PLACE PAINTED 26 25 27 28 BARRIER (12.0' LT) TEMP CONCRETE WHITE EDGE LINE (10.0' LT) 12+22.96 LW PT 30 29 TEMPORARY RAMP DETAIL, SHEET MOT-D01 CONSTRUCT TEMP PEDESTRIAN RAMP PER 0+00 76 LINE19+47.91 LW = 7 6 LI NE TYP CLEAR 5' MIN DETAIL, SHEET MOT-D01 TEMPORARY RAMP PEDESTRIAN RAMP PER CONSTRUCT TEMP MFP21006116 \ \ \ \ \ \ \ \ \ CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 \ \ \ \ \ "/ ' ,r ,_ (.' I \ ' I \ ' \ \ ' ' ' " l '< I I AND \ \ ; FILE NAME c:luserslmatlldocumentslprojectwiselworkingdirlwsdotldms09049141_XLS467 _PS_RNW0S_UI 1559A.dgn TIME DATE PLOTTED BY 2:40:11 PM 6/30/2020 MF DESIGNED BY TDW ENTERED BY MF CHECKED BY JMS PROJ. ENGR. J. LEFOTU REGIONAL ADM. K. HENRY REVISION DATE BY WORK ZONE MG2-MG3 -cur-cur -_CUT --cu -BT --BT --B-7"7-,fl ---ar-�ar--ar--ar--ar-- 1--w--w--w--w--w--w--w--w -�::_/::_ ___ �----n,7n�-:-__:.�...;.,;�...,;;;c.=;..1i,,1;;;.,a..--.....BT -- 8 T _ -KE w, -�-'ASHtNGTON � I -BT --BT - w_ REGION NO. STATE 10 WAS JOB NUMBER XL5467 CONTRACT NO. Btvo NE t -er_ �sT_ ---a l, ·� 2 .� .r-1 CONSTRUCTION PHASING FOR WATERLINE RELOCATION: 1.COORDINATE WITH CITY OF RENTON FOR CUT-IN INSTALLATION OF NEW 12-INCH IN-LINE VALVE ON NE 48TH ST (SE 76TH ST) APPROXIMATELY 150 FEET EAST OF INTERSECTION WITH LAKE WASH. BLVD NE 2.CONTRACTOR TO PROVIDE ALL MATERIALS, EXCAVATION, BACKFILL, STREET RESTORATION, FOR VALVE INSTALLATION BY CITY FORCES 3. COORDINATE WITH CITY OF RENTON TO SHUT DOWN 12-INCH WATER MAIN IN LAKE WASH BLVD NE FOR INSTALLATION OF 12-INCH TEMPORARY END CAP ON EXISTING 12-INCH WATER MAIN APPROXIMATELY 50 FEET NORTH OF EXISTING FIRE HYDRANT 5.COORDINATE WITH CITY OF RENTON TO PERFORM FINAL CONNECTIONS TO EXISTING WATER MAIN ON NORTH SIDE AND ON SOUTH SIDE CONTRACTOR TO EXCAVATE, INSTALL CONCRETE BLOCK, BACKFILL AND STREET RESTORATION ON SOUTH SIDE (NE 48TH ST) CITY FORCES TO CUT-IN NEW 12-INCH 90°BEND AND 12-INCH GATE VALVE ON EXISTING 12-INCH MAIN AND CONNECT NEW 12-INCH WATER MAIN TO EXISTING 12-INCH WATER WITH 12-INCH SLEEVES. 6. ON NORTH SIDE, LAKE WASH BLVD NE, CITY CREW TO REMOVE TEMPORARY END CAP AND CONNECT TO NEW 12-INCH WATER MAIN WITH 12-INCH SLEEVE 0 NOTES: 12.5 SCALE IN FEET 1.SEE SHEET UT-00 FOR LEGEND AND OWNER CONTACT INFORMATION. 2. CONTRACTOR CAN DEFLECT DUCTILE IRON PIPE JOINTS BY HALF THE MANUFACTURERS MAXIMUM ALLOWED DEFLECTION. 3. SEE RNW10,11,12,13,AND 14 FOR STANDARD PLANS. 25 4. ALL WATERMAIN TIE-IN SHALL BE COORDINATED WITH THE CITY OF RENTON. 5. ALL WATER LINES SHALL BE DI CLASS 52 WITH RETRAINED JOINTS (RJ) AND FITTINGS FLANGED BY MECHANICAL JOINTS (FLXMJ MEGALUG® SERIES 1100 OR APPROVAL EQUAL) 6. ALL FINISHED GRADE OR SUB-GRADE SHALL BE IN PLACE PRIOR TO ANY WATER MAIN INSTALLATION. 7. CONTRACTOR SHALL COVER BOTH ENDS OF NEW PIPE DURING INSTALLATION, UNTIL CONNECTION TO EXISTING LINE IS READY. FED.AID PROJ.NO. ..ai,. Washington State 1-405; RENTON TO BELLEVUE WIDENINGw PLAN REF NO Department of Transportation AND EXPRESS TOLL LANES PROJECT RNW05A FL�TIRON LANE� UI# 1559 CITY OF RENTON -WATER SHE.ET PLAN LOCATION NO. DATE P.E. STAMP BOX wood. ■ OF STA. 7695+65 TO STA. 7710+47 DATE SHEETS P.E. STAMP BOX Direct bury ANMW-50 & (2) 1.25" HDPE HH UN-26 *Install new ANMW-50 & (2) 1.25" HDPE into vault Place 4" Schd 40 Conduit under driveway Place ANMW-50 & (2) 1.25" HDPE in casing After placing, set locate ball at end of conduit & seal Remove existing pedestal & overset with new 25-TA w/ non-skid ADA cover Case up existing splice & remove terminal TEA to be removed : 4900 Lake Washington BV NE Remove/abandon existing direct buried cable after cut-over N.948351 WSDOT I-405 HOV Express Toll Lanes - UI 1296.1 4800 Lake Washington Blvd NE, Renton, WA 98056 ENG : Jesse Patjens CPA : Mark Evaul All work to be performed withing Flatiron Lane JV existing traffic control. Coordinate site access with Grady Stidham (206) 573-8382 Base mapping provided by others MFP21006116 City review comment: restoration per city of renton standard