HomeMy WebLinkAboutMFP21005834.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP21005834
IVR Number: 21005834
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:12/06/2021Application Date:0423059142Parcel Number: 2611 UNION AVE NE
Permit Type:01/03/2022Issue Date:Franchise
Permit Work Class:01/03/2023Expiration Date:Major Utility
Job Number: 105090858Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO INSTALL NEW SINGLE PHASE UG LINE EXTENSION TO FEED NEW 25
LOT PLAT. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031ApplicantX
Carli Bunkelman
PSE/POTELCO - Billing
6905 S 228th St
Kent, WA 98032
B: (253) 437-6708Contractor
Business License Number: 5109Construction Contractor: POTELI*227PL
PULTE HOME OF WASHINGTON IN 3535 FACTORIA BLVD SE STE 110
BELLEVUE , WA 98006
Owner
Corrie Rydberg
Puget Sound Energy
6905 S 228TH St
KENT, WA 98032
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 1ϭ/Ϯϱ/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.܆ A copy of the Traffic Control Plan (TCP) Application form.
2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
܆ Include map(s) showing the location of the project and work area.
܆ Be legible lettering and clear, contrasting, symbols of viewing or printing.
܆ Must indicate street names, and north arrow and scale.
܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
܆ Types of plans required:
܆ Work hour plan – show all mobility impacts during construction hours.
܆ Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
܆ Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
܆ Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
4
4
4
4
4
4
4
4
4
4
4
105090858
2611 UNION AVE NE
Monday Friday 8:00am 3:00pm
PLEASE SEE ATTACHED
POTELCO, INC 425 892 0416
LEE BROWN LEE.BROWN@PSE.COM
6905 S. 228TH ST KENT, WA 98032
MFP21005834
Scott Warlick CED 1/3/2021
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
x TCP must be approved prior to commencing the work, and all permit conditions shall be met.
x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
x Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
x Approved Temporary TCP must be at the work site during work hours.
x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
x Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
CORRIE RYDBERG
NE 27TH PL
11 11
1616P02
P2A
1212
STOP
FLAGGER
STOP
FLAGGER
W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100'
RESIDENT(S) WILL BE INFORMED
OF POSSIBLE TEMPORARY
DRIVEWAY CLOSUREUNION AVE NEUNION AVE NECHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
N PSE PUGETSOUNDENERGY
JOB#105090858
2611 Union Ave NE, Renton, WA
December 8, 2020
ina.ustemchuk@pse.com
(425)398-6063
SHEET 1 of 1
TEMPORARY TRAFFIC CONTROL PLANPuget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
ROW ROW
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP21005834
N
Vicinity Map
47.5160, -122.1645
Owner / Developer Contact Info
officeATTN:
PULTE HOMES OF WASHINGTON
3535 FACTORIA BLVD SE, STE 600
BELLEVUE, WA 98006
LANCE ADAMS 206.406.6059
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
506775167 105090858
N/A 105098908
N/A N/A
N/A N/A
N/A N/A
N/A N/A
510466889 107060327
N/A 106373096
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Comm. L/E
Relocation
Removal
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105090858107060327DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.8620 .
E. PASAYE .9.20.21
E. PASAYE .9.20.21
E. PASAYE .9.20.21
REDT # ( RW-112327 )RENTON
FOREST TERRACE
1Ø PRIMARY U/G LINE EXTENSION - 25 S/F LOTS
2611 UNION AVE NE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107060327 105090858
N/A 1 OF 5
KING 088A CIKNC QCSOKE
04NE-T23N-R05E 204.080 204.085
2305E013 2305E040 2305E013 PRE-14
COMCAST
BILL WALKER
253.288.7538
LUMEN
KENNETH LUU
206.346.0144
RIGHT OF WAY
AMBER YANG
425.456.2774
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LEE BROWN
425.417.8620
Lee.Brown@pse.com
x
x
x
...
...
...
x
LANCE.ADAMS@PULTEGROUP.COM
Excavation - 11-1/4 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
4'-0"6'-0"
6"6'-7"
3'-6"
4'-0"
7'
10'
TOP VIEW
NOT TO SCALE
VAULT DETAIL @ V01
TYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
4'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
4'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H1A, H1C, H2B & H3A
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
VAULT DETAIL @ V02
NOT TO SCALE
EXCAVATION: _____ CUBIC YARDS
3'-6"
SIDE VIEW
2"
6"
CRUSHED
ROCK
TOP VIEW
7'
7'
6 1/3
SITE
VAULT DETAIL @ V03
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTMFP21005834
P
ABCN
336.4ACSRC4/OACSRABCN
#2ACSR
EX: 1-2"
N.O.
FUT: 1-2"
FUT: 1-2"
R55'53'53'53'70'
'A'
'B'FEEDPRE
14
ST. LIGHT
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
HH TO METER LOCATION
(TYPICAL)
EX: 1-3"
MON.
2616
IRR.115kV55kVPROP.
IRRIG.
1" = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.8620 .
E. PASAYE .9.20.21
E. PASAYE .9.20.21
E. PASAYE .9.20.21
REDT # ( RW-112327 )RENTON
FOREST TERRACE
1Ø PRIMARY U/G LINE EXTENSION - 25 S/F LOTS
2611 UNION AVE NE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107060327 105090858
1" = 50'2 OF 5
KING 088A CIKNC QCSOKE
04NE-T23N-R05E 204.080 204.085
2305E013 2305E040 2305E013 PRE-14
COMCAST
BILL WALKER
253.288.7538
LUMEN
KENNETH LUU
206.346.0144
RIGHT OF WAY
AMBER YANG
425.456.2774
.
.
.
SITE PLAN CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
PRE-14
6.11.21
384 418 415
13 0 0
397 418 415
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 1430 FT.
27 3900
140 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Developer Note:
The following Fault Current information MUST BE conveyed
to the builder of the units:
All units may require upgraded house electrical equipment as the
fault current at the meter base may exceed 10,000 amps.
FAULT CURRENT TABLE
3075$16)250(569
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 & V02 75kVA 0.5 2.30 36,200 AMPS 1.80 23,100 AMPS
CROSSING CONDUIT TABLE
X-ING
#
LOCATION GAS POWER
XING
LENGTH
ASBUILT
LOCATION
TYPE OF CROSSING
(Feeder, Primary, Secondary, etc.)FROM TO
SIZE
(IN)TYPE QTY LOCATION
SIZE
(IN)TYPE QTY
X01 TR. A LOT 24
4 40 1 W 2 80 1 65 ( )' WCL GAS MAIN, PRIMARY
----3 80 1 65 ( )' WCL GAS MAIN, PRIMARY
X02 LOT 24 LOT 1 2 40 1 W 3 80 1 65 ( )' ECL GAS SVC, SECONDARY
X03 LOT 23 LOT 2 2 40 1 W 3 80 1 65 ( )' ECL GAS SVC, SECONDARY
X04 LOT 22 LOT 3 2 40 1 W 3 80 1 65 ( )' ECL GAS SVC, SECONDARY
X05 LOT 20 LOT 3 4 40 1 W 2 80 1 75 ( )' ECL GAS MAIN, FUTURE PRIMARY
----3 80 1 75 ( )' ECL SECONDARY
X06 LOT 18 LOT 4 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY
X07 LOT 17 LOT 5 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY
X08 LOT 16 LOT 6 2 40 1 W 3 80 2 65 ( )' WCL GAS SVC, SECONDARY
X09 LOT 15 LOT 8 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY
X10 TR. E LOT 9 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY
X11 'A''B'4 40 1 N 2 80 1 110 ( )' SCL GAS MAIN, PRIMARY
X12 TR. E LOT 10 4 40 1 W 2 80 1 65 ( )' WCL GAS MAIN, FUTURE PRIMARY
----3 80 1 65 ( )' WCL SECONDARY
2" PVC PLUG /CAPS = 16 2" YELLOW SCH 40 PVC = 520 FT 2" SCH80 GREY PVC = 315 FT 2" PVC PLUG /CAPS = 8
4" PVC PLUG /CAPS = 8 4" YELLOW SCH 40 PVC = 315 FT 3" SCH80 GREY PVC = 790 FT 3" PVC PLUG /CAPS = 24
COORDINATE WITH PSE ON
PLAT CONSTRUCTION WITHIN PSE
TRANSMISSION CORRIDOR EASEMENT
DEVELOPER TO COORDINATE WITH PSE
PROJECT MANGER & SERVICE PROVIDER
PRIOR TO EXCAVATING WITHIN 3' OF LOCATE
MARKS OF PSE ENERGIZED FACILITIES
DEDICATED FACILITIES (105090858) for Dedicated Stub Locations
SITE SPAN ADDITIONAL REMARKS LABOR UNITS
#FROM TO FOOTAGE
-V01 LOT 20 60 DED. CONDUIT & WIRE 2-36, 2-54A
-V01 LOT 21 60 DED. CONDUIT & WIRE 2-36, 2-54A
-H1B LOT 1 85 DED. CONDUIT & WIRE 2-36, 2-54A
-V01 LOT 3 55 DED. CONDUIT & WIRE 2-36, 2-54A
-V02 LOT 7 50 DED. CONDUIT & WIRE 2-36, 2-54A
-H2A LOT 9 30 DED. CONDUIT & WIRE 2-36, 2-54A
-V03 LOT 13 100 DED. CONDUIT & WIRE 2-36, 2-54A
-V04 LOT 25 65 DED. CONDUIT & WIRE 2-36, 2-54A
TOTAL FT=505
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #ST LIGHT
N/A
N/A
UNK
N/A
1KW
65A
1.1 @ H1C
3.8 @ H1C
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
-1 H1C TBD TBD STREET LIGHTS
-1 H2A 1 #12 IRRIGATION
-1 V04 1 #12 MONUMENT
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #IRRIGATION
N/A
N/A
TBD
N/A
1KW
N/A
1.0 @ H2A
1.6 @ H2A
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
Units:
BUILDING #MONUMENT
N/A
N/A
TBD
N/A
1KW
N/A
0.4 @ V04
1.0 @ V04
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
MFP21005834
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.8620 .
E. PASAYE .9.20.21
E. PASAYE .9.20.21
E. PASAYE .9.20.21
REDT # ( RW-112327 )RENTON
FOREST TERRACE
1Ø PRIMARY U/G LINE EXTENSION - 25 S/F LOTS
2611 UNION AVE NE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107060327 105090858
AS SHOWN 3 OF 5
KING 088A CIKNC QCSOKE
04NE-T23N-R05E 204.080 204.085
2305E013 2305E040 2305E013 PRE-14
COMCAST
BILL WALKER
253.288.7538
LUMEN
KENNETH LUU
206.346.0144
RIGHT OF WAY
AMBER YANG
425.456.2774
.
.
.
...
...
...
EX OVERHEAD CIRCUIT MAP 2305E040
SCALE: 6" = 1 MILE
EX UNDERGROUND CIRCUIT MAP 2305E013
NOT TO SCALE
SITE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SITE
MFP21005834
ABCN
336.4ACSRCABCN
#2ACSR
'A'
'B'FEEDPRE
14
4/OACSRNEW 1/O AL
(,<$NEW 1/O AL
(,<$
NEW 1/O AL
(,<$
NEW 1/O AL
(,<$
NEW 1/O AL
(,<$
AØEIV132
BØEIV133
AØEIV129
BØEIV130
CØEIV131
AØEIV134
BØEIV135
CØEIV136
AØTBD
BØTBD
CØTBD
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.8620 .
E. PASAYE .9.20.21
E. PASAYE .9.20.21
E. PASAYE .9.20.21
REDT # ( RW-112327 )RENTON
FOREST TERRACE
1Ø PRIMARY U/G LINE EXTENSION - 25 S/F LOTS
2611 UNION AVE NE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107060327 105090858
N/A 4 OF 5
KING 088A CIKNC QCSOKE
04NE-T23N-R05E 204.080 204.085
2305E013 2305E040 2305E013 PRE-14
COMCAST
BILL WALKER
253.288.7538
LUMEN
KENNETH LUU
206.346.0144
RIGHT OF WAY
AMBER YANG
425.456.2774
.
.
.
...
...
...
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 319109
167086
4'x6'x3'6"
Combo Vault
Matid: 7664000
Cover: 7665800
75KVA MP TRF
120/240
Matid: 6247150
4 2 CMBO15LS 6045.1050 AØ
ELB10J 6041.1000
CAP (7630600)
V02 319109
167051
54"x54"x38"
Unistrut HH
Matid: 7663002
75KVA MP TRF
120/240
Matid: 6247150
2 -
MINU1LL 6045.1010 AØ
V03 319115
167021
42"x48"x38"
Unistrut HH
Matid: 7663001
50KVA MP TRF
120/240
Matid: 6247100
1 1
MINU1SR 6045.1010 AØ
PV1 319110
167116
4'8"x4'8"x3'6"
w/3' Sq Door
Matid: 7663900
Cover: 7656400
1Ø PRIMARY
PULL VAULT --SVSB20 6051.1500
SPL10J 6041.2000
Existing
J01
319095
167130
4'8"x7'x5'
w/2-3' Sq Doors
Matid: Existing
J-Box Below Grade
w/4-Pos J-Bus x3
Matid: Existing
1 -
ELB10J 6041.1000 TAP AØ INSTALLED ON SC.73 CONVERSION JO#: 101140385
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED LUBRICANT (Gal.)
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE EST.ACTUAL
E01 PV1 2 1 145 1 ---CONDUIT ONLY -----
J01 PV1 -------166 142 1/0 AL JKT 460 EIY545 ---1.8
PV1 V01 2 1 295 -2 --72 72 1/0 AL JKT 310 EIY545 ---1.2
V01 JMPR CABLE ONLY --1/0 AL JKT 15 EIY546 ---0.1
V01 E03 2 1 155 1 ---CONDUIT ONLY ---(2-36)-
V01 V02 2 1 355 ----115 90 1/0 AL JKT 365 EIY547 ---1.4
V02 V03 2 1 200 ----124 124 1/0 AL JKT 320 EIY548 ---1.3
V03 E04 2 1 165 1 ---CONDUIT ONLY ---(2-36)-
2" SCH80 (FT) & BENDS =1315 3 2 0 0 1/0 AL JKT TOTAL (FT) =1470 TTL(Gal.)5.9
CLEAR WORKING SPACE FOR VAULTS
NOT TO SCALE
FIELD SIDE (PREFERRED)
ROAD SIDE (PREFERRED)
6' MIN
3'
MIN
3'
MIN
3' MIN
21" Min. bend radius
LSG317
on 750 cable
Mark each cable withcable numbers
Nylon cable tie
J-BOX CABLE ENTRY DETAIL
NOT TO SCALE
PULL VAULT CABLE ENTRY DETAIL
NOT TO SCALE12kV CABLE ROUTING 5'x7' VAULT DETAIL
Cables should enter the vault so that all of
the cables will lay in the same direction.
TOP VIEW
Cables must enter the vault so that
they will lay in the opposite direction.
TOP VIEW
TOP VIEW
Excavation - 10-1/3 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
8'
8'
4'-8"
3'-6"
4'-8"
6"
VAULT DETAIL @ PV1
NOT TO SCALE
MFP21005834
EX: 1-2"
FUT: 1-2"
FUT: 1-2"
'A'
'B'
ST. LIGHT
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
HH TO METER LOCATION
(TYPICAL)
EX: 1-3"
MON.
IRR.
PROP.IRRIG.
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.8620 .
E. PASAYE .9.20.21
E. PASAYE .9.20.21
E. PASAYE .9.20.21
REDT # ( RW-112327 )RENTON
FOREST TERRACE
1Ø PRIMARY U/G LINE EXTENSION - 25 S/F LOTS
2611 UNION AVE NE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107060327 105090858
N/A 5 OF 5
KING 088A CIKNC QCSOKE
04NE-T23N-R05E 204.080 204.085
2305E013 2305E040 2305E013 PRE-14
COMCAST
BILL WALKER
253.288.7538
LUMEN
KENNETH LUU
206.346.0144
RIGHT OF WAY
AMBER YANG
425.456.2774
.
.
.
...
...
...
NOT TO SCALE
NEW CONDUIT DIAGRAM
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
SECONDARY 2"
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND
CUST. OWNED
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A PEDESTAL 3 - SEPS3 6050.1000
H1B HANDHOLE 5 - 1730 HH16350 6050.2000
H1C HANDHOLE 2 - 1324 HH13350 6050.2000 WO#105098908 (3-22)
H1D HANDHOLE 2 - 1324 HH13350 6050.2000 WO#105098908 (3-22)
H1E HANDHOLE 2 - 1324 HH13350 6050.2000 WO#105098908 (3-22)
H2A HANDHOLE 5 - 1730 HH16350 6050.2000
H2B PEDESTAL 3 - SEPS3 6050.1000
H3A PEDESTAL 3 - SEPS3 6050.1000
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in)Design (ft)(Percent)(Percent)Actual Amount Installed Cable Conduit
V01 H1A 350 145 3 145 1 1.8 2.1
V01 H1B 350 145 3 145 1 2.1 2.1
V01 H1C 1/O 170 3 95 3 1.1 3.8 COMM HH (3-6) WO#105098908
V01 H1D 4/O 220 3 155 3 1.9 0.3 COMM HH (3-6) WO#105098908
V01 H1E 4/O 140 3 140 2 1.9 0.4 COMM HH (3-6) WO#105098908
V01 LOT 3 4/O 145 60 3 80 1 2.2 3.4 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V01 LOT 20 4/O 75 60 2 75 2.1 3.2
V01 LOT 21 4/O 75 60 2 75 2.1 3.2
V01 LOT 22 4/O 80 60 3 80 2.1 3.2
H1A LOT 4 4/O 90 60 3 25 2 2.6 3.8 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H1A LOT 19 1/O 60 2 2.4 3.4
H1B LOT 1 350 160 60 3 95 2 2.8 3.8 LABEL YELLOW TAG "MUST BE 350 TO MTR"
H1B LOT 2 4/O 70 60 3 5 2 2.8 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H1B LOT 23 1/O 60 2 2.7 3.4
H1B LOT 24 4/O 75 60 2 75 1 2.8 3.7 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V02 H2A 350 80 3 80 2 1.6 1.6
V02 H2B 350 150 3 150 2 1.8 2.1
V02 LOT 6 4/O 140 60 3 75 2 2.1 3.3 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V02 LOT 7 4/O 140 60 3 75 3 2.1 3.3 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V02 LOT 8 4/O 95 60 3 30 2 2.2 3.4
V02 LOT 16 1/O 20 60 2 20 1 1.9 2.7
V02 LOT 17 4/O 90 60 3 90 1 2.2 3.3
H2A LOT 9 350 185 60 3 120 2 2.1 3.7 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H2A LOT 14 1/O 60 2 2.2 2.9
H2A LOT 15 1/O 10 60 2 10 1 2.3 3.1
H2B LOT 5 4/O 80 60 3 15 2 2.5 3.8 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H2B LOT 18 1/O 10 60 2 10 1 2.6 3.7
V03 H3A 350 145 3 80 3 1.7 2.7
V03 LOT 12 4/O 120 60 3 120 1 2 1.9 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
V03 LOT 13 4/O 115 60 3 115 1 2 1.9 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H3A LOT 10 4/O 60 2 2.0 3.4 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
H3A LOT 11 4/O 60 2 2.0 3.4 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
E02 LOT 25 CONDUIT ONLY 3 70
V04 LOT 25 4/O 140 60 CABLE ONLY 1.3 3.3 LABEL YELLOW TAG "MUST BE 4/0 TO MTR"
1/O UG Triplex (ft) =210 2" SCH80 & BENDS (ft)=265 4 0 0 0 0.4
4/O UG Triplex (ft) =1890 3" SCH80 & BENDS (ft)=1985 33 0 4 0 4.6
350 UG Triplex (ft) =1010 TOTAL QTS OF GLUE 5.0
Customer's
service
conductors
Captive L-Bolt
27-1/4"
2"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"
Conductors enter from
beneath and shall be
folded back with handhole
SIDE VIEW
Lock Cover
30"
Approx
Approx
17"
Set handhole flush
to final grade
SINGLE PHASE SECONDARY HANDHOLE
NOT TO SCALE
SIDE VIEW
18"
23-1/4"32-3/4"
2"
Captive L-Bolt
Lock Cover, 10 lbs
24"
Approx
Approx
13"
Customer's
service
conductors
4-3/4" X 4-3/4"
KNOCKOUT IN 2 PLACES
Conductors enter from
beneath and shall be
folded back with handhole
Set handhole flush
to final grade
Captive L-Bolt
Lock Cover
1Ø SECONDARY HANDHOLE @ H1C, H1D, H1E
Not to scale
@ H1A & H1B
MFP21005834