Loading...
HomeMy WebLinkAboutMFP21005868.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21005868 IVR Number: 21005868 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:12/07/2021Application Date:1823059215Parcel Number: 365 RENTON CENTER WAY SW Permit Type:01/03/2022Issue Date:Franchise Permit Work Class:01/03/2023Expiration Date:Minor Utility Job Number: 105097188Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW TO WORK ON J BOX ON THE EDGE OF ROW AND PRIVATE PROPERTY. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL FRED MEYER STORES INC 1014 VINE ST 7TH FLOOR CINCINNATI , OH 45202 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 105097188 365 SW RENTON CENTER WAY Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 DAN RIZZO DAN.RIZZO@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21005868 Scott Warlick CED 1/3/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG S 3RD P L RAIN IER AVE S J01111311 11 11 11 1111 1111111111192313 11 11 11 11 11 11 ONLYONLY1111 11 11 11RAIN IER AVE S SW SUNSET BLVD 1111 ONLYONLY1111 ONE WAY14 22111112 ONLY 13 1111 13 ONLYONLY161416O N L Y O N L Y13 1 3 13 V01 ARRW-BRDRIGHT LANECLOSEDAHEADW20-5RW4-2RROADWORKAHEADW20-1350'350'350'ROADWORKAHEADW20-1100' 100'ROADWORKAHEADW20-1 S 3RD P L13 SW SUNSET BLVD X'X'PLACE W20-1 SIGNS ON ALL ADJACENT STREETS WITHIN FEET OF WORK AREA ROADWORK AHEAD W20-1ROADWORKAHEADW20-1500 PROTECTIVE VEHICLE THE CREW SHALL CEASE WORK FOR A FLAGGER/SPOTTER TO ESCORT PEDESTRIANS AROUND THE WORK AREA WORK PIT 28" TRAFFIC CONE TRAFFIC FLOW SIGN LOCATION LEGEND CHEVRONARROW BOARD WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN 0'70'35' PRINT ON 11X17" SHEETS ONLYN Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 10/26/2021 105097188 0 365 SW RENTON CENTER WAY, RENTON, WA 98057. Jason Bisenius 425-424-7316 jason.bisenius@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 65 - - 780 70 - - 840 MFP21005868 361368RAINIER AVE SRENTON CENTER WAY SW317754-165835317755-16583425 kVA 120/240V (A)317732-165842225 kVA 120/208V (ABC)317730-165843317749-129837750 kVA 277/480VEAR17317769-165839SL1022897CUSTOMER OWNED, INSTALLED& MAINTAINED SVC317776-16582337.5 kVA 120/240V (A)317774-165814ROW431365EV(PARKING LOT)J J J317749-129837750 kVA 277/480V317754-1658351-4" DB-120 CONTINUOUS PVC CONDUIT ± 35'11' X 11' WORK PITCUSTOMER SUPPLIED20 CUBIC YARD 6" CRUSHED ROCKCUSTOMER SUPPLIEDCUSTOMER SUPPLIED4' X 4' WORK PITJ317749-129837750 kVA 277/480VPSE INST. 1-RUN 1/0 UG JKT CABLE ± 55'(AØXXXXXX)(BØXXXXXX)(CØXXXXXX)317754-165835POWER GENERAL NOTES - COMMERCIAL PROJECT8.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction andrestoration per this sketch and per PSE standards. A minimum protective cover of 36" is required overPSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customerwill provide any and all shoring or they will side slope the trench to 1:1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation fromthis work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.All switching arrangements and/or outage arrangements are to be made with the Project Manager at leastthree (3) working days in advance.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencingwork to get the underground facilities located.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or constructionmaterials which would restrict construction and/or equipment access, before work can begin.Roads shall be paved or have a compacted , crushed rock base in place.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet fromcombustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guardposts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, oras required by your local municipality.All work is to be done in accordance with local municipal and county permit requirements as applicable.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduitsand crossings from the individual unit's meter base to the designated connection point on private property.Inclement weather conditions may cause delays in construction times and dates.1.2.3.4.5.6.7.9.11.10.SITE PLANSCALE: 1" = 50'JOB SITECUSTOMER DEVELOPMENT NOTES:A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITEWORK.CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGETSOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:CROSSING/BORING.-OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMITREQUIREMENTS.-CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TOCONSTRUCTION.-PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTIONWORK IN RIGHT OF WAY.-EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY.VAULTS & WORK PITS.-REQUIRED TO PROVIDE 4' X 4' WORK PIT AT J01-REQUIRED TO PROVIDE 11' X 11' WORK PIT 20 CUBIC YARDS OF 6” CRUSHED ROCK AT V01JOB SITE READINESS.-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE.-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY.-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BECOMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS &TRENCH AT ALL TIMES.-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING.- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP ANDSCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS .NVicinity MapN/AARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.JOB SITEASPLUNDH CONSTRUCTION CORP. - QA/QC T. MYERPSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)001"2"0050'100'CIRCUIT FEET ADDED: 35'SQ. FOOTAGE: N/APANEL SIZE: 2000AHEAT TYPE: ELECTRICEST. DEMAND: 417.96kWLRC: 0A% V. DROP: 2.4%% FLICKER: 2.9%SITE SPECIFIC NOTESAT J01: 317754-165835-INSTALL (3) 12kV ELBOW KIT PER STD. 6041.1000 (ELB10J)AT V01: 317749-129837-INSTALL (1) HH 7' X 7' X 4' W/ GROUNDS PER STD 6045.5000 (PM3P15M)-INSTALL (1) COVER HH 8' X 10' X 8" W/ 60" X 24" ACCESS (MID: 7917900)-INSTALL (1) 750KVA PADMOUNT TRF (MID: ______)-INSTALL (3) 12kV ELBOW KIT PER STD 6041.1000 (ELB10J)-INSTALL (4) #2 TO 500 KCMIL CONNECTOR LUGS (MID 7651002)-INSTALL (12) MOUNTING BOLT KITS (MID 7651008)-INSTALL GRID #317749-129837-CONNECT CUSTOMER OWNED, INSTALLED, & MAINTAINED SVCAT M01: (EV STATIONS)-INSTALL 2000A METERInstalled at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER INSTALLATIONCompany ID#:Primary phase connected to:Tested Secondary VoltageMaterial ID#:V01317749-129837750kVAUNDERGROUND CIRCUIT MAPSCALE: 6" = 1 MILENEW CABLE DIAGRAMNOT TO SCALENEW CONDUIT DIAGRAMNOT TO SCALEOVERHEAD CIRCUIT MAP 2305E076SCALE: 6" = 1 MILESPAN SPECIFIC NOTESJ01 TO V01:-INSTALL 1-4" DB-120 CONTINUOUS PVC CONDUIT, ±35' ___' ACTUAL-INSTALL 1-RUN 3Ø 1/0 UG JKT CABLE, ± 55' ___' ACTUALPRIMARY CABLE & CONDUIT TABLELOCATIONCONDUITCABLEASBUILT INFORMATION - FOREMAN COMPLETEFROMTOSIZE(IN)QTY.DESIGNLENGTH(FT)BENDSPULL(LBS)PULLREV(LBS)CABLESIZEDESIGNLENGTH(FT)PHASE - ID TAGRECORDRECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED90°45°22°11°ABCMANUFACTURERCOMPOUNDYEARNOTESCONDUITCABLEJ01V014135'--1/0AL JKT55'XXX###XXX###XXX###-2" PVC (FT) & BENDS =35'00001/0 AL JKT TOTAL (FT) =55'Owner / Developer Contact InfoofficeATTN:TESLA INC C/O ENGIE IMPACT MS9107PO BOX 2440 SPOKANE, WA 99210BRETT COURNOYER503-706-5566105097188GASPHONECABLE TVN/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorServiceE-Mail:Cell Phone:Project Manager Contact Information:Manager:DAN RIZZO206-960-1740DAN.RIZZO@PSE.COMUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPD. RIZZO206-960-17403/30/21T. PAULSEN253-318-68973/30/21S. FOX714-893-24053/30/21N/AN/ATESLA CAR CHARGERS3Ø UG PRI L/E365 SW RENTON CENTER WAY, RENTON, WA 98057N/AN/AN/A105097188AS NOTED1 OF 2KINGN/AN/ACSPSKEPMSE 18-23N-05EN/AN/A2305E0722305E0762035E072NWEAR-17N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A105097188510486223CIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEEAR-1706/2020189.00156.00191.0025.3625.3625.36214.36181.36216.36POTHOLE ALL EXISTING UTILITIESRESTORATION PER CITY OF RENTON STANDARDSMFP21005868 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 TWO BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)105097188UTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPD. RIZZO206-960-17403/30/21T. PAULSEN253-318-68973/30/21S. FOX714-893-24053/30/21N/AN/ATESLA CAR CHARGERS3Ø UG PRI L/E365 SW RENTON CENTER WAY, RENTON, WA 98057N/AN/AN/A105097188AS NOTED2 OF 2KINGN/AN/ACSPSKEPMSE 18-23N-05EN/AN/A2305E0722305E0762035E072NWEAR-17N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A2"Excavation - 20 cubic yards10'-0"7'-0"8'-0"8"6'-2"SIDE VIEW6'-6"Crushed6"Rock11'11'TOP VIEW5'-6"7'-0"6045.5000Not to scaleVAULT & EXCAVATION DETAILCables should enter the vault so that all ofthe cables will lay in the same direction.TOP VIEWJ- BOX CABLE ENTRY DETAILNot to scaleCommunicationsPrimary PowerCables or ConduitExcavated Dirt PileROADSIDEFinal Grade24" Min12" MinSeparation36"MinCover48"MaxBackfill(No rocks over 10" diameter)Separation12" MinGas4" Sand Bedding32" Typical(Power, Gas, andCommunications)JOINT TRENCH DETAILPrimary-Mainline Gas & Communications (NTS)Separation12" Min6" or 12" Min Sand Shading after Compaction- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.Trench and backfill requirements for primary electric line extension trenches (No PSE gas)- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.FLOW DIRECTIONLAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,SECURE WITH PEA GRAVEL BAGS.6'3'8"TECHNIQUES FOR EROSION AND SEDIMENT CONTROLSILT FENCE DETAILNot to Scale0150.3200COOLING5' MIN5' MIN10' MIN5'MINFINSACCESSCONCRETE PADMINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULTCURB OR EDGE OF PAVEMENTCURB OR EDGE OF PAVEMENT5' MINROAD ORPARKING AREATYP. PAD& TRANS-FORMER1.5' MINDOORACCESSDOORREQUIREDWORK SPACEAREANot to scale1.5' MIN3'MIN3' MIN3' MIN10' MIN3'MIN