Loading...
HomeMy WebLinkAboutMFP21005865.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21005865 IVR Number: 21005865 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:12/07/2021Application Date:0423059142Parcel Number: 2611 UNION AVE NE Permit Type:01/04/2022Issue Date:Franchise Permit Work Class:01/04/2023Expiration Date:Minor Utility Job Number: 107060327Franchise Type:Natural Gas Description: PSE Gas GAS TIE IN OFF OF UNION AVE TO FEED NEW 25 LOT PLAT. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 107060327 2611 UNION AVE NE Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 LEE BROWN LEE.BROWN@PSE.COM 6905 S. 228TH ST KENT, WA 98032 MFP21005865 Scott Warlick CED 1/4/2021 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG NE 27TH PL UNION AVE NE161610 10 1111 STOP FLAGGER STOP FLAGGER STOP FLAGGERW20-7AW20-4ONE LANEROADAHEAD200'200'200'ROADWORKAHEADW20-1W20-7AW20-4ONE LANEROADAHEAD200'200'200'ROADWORK AHEAD W20-1W20-7AROADWORKAHEADW20-1BEPREPAREDTOSTOPW3-4100'100'100' FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK 'X' SIGNS TO BE USED AFTER HOURS PRECEDING AREAS (LANES) THAT HAVE PLATES ON ROADWAY CAUTIONSTEEL PLATE ON ROADWAY T78-A MOTORCYCLESUSE EXTREMECAUTION W21-1701 'X' TRENCH 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN 0'70'35' PRINT ON 11X17" SHEETS ONLY N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 8. Work area will be 29' NCL of NE 27th PL & 7' WCL of Union Ave NE to West Property Line.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 11/02/2021 107060327 0 2611 UNION AVE NE, RENTON, WA 98059. Jason Bisenius 425-424-7316 jason.bisenius@pse.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP21005865 P 2'' MPE IP 7'E107010419-2010150'S 5/8'' MPE 2008 2'' MPE IP 25'S 107010419-20102'' MPE IP 7'W107052382-201692'E5/8'' MPEI20025/8'' MPEI20025/8'' MPEI200362'EFLOWFLOW FLOW FLOW53'53'70' 4100 4101 4107 2616 Owner / Developer Contact Info officeATTN: PULTE HOMES OF WASHINGTON 3535 FACTORIA BLVD SE, STE 600 BELLEVUE, WA 98006 KYLE LUBLIN 425.216.3466 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) GENERAL NOTES - GAS (JOINT TRENCH): 1" = 50'105090858 107060327 Excavator to contact Utilities Underground Location Center (One-Call) 48 hours prior to construction, to two working days prior to construction. 1-800-424-5555 Notify appropriate permitting agency prior to job start (see permit requirements). Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sediment Control and any additional local jurisdiction requirements. Any change in route, pipe size/type, tie-in method or additional main footage must be approved by the appropriate Engineer/Project Manager. Complete "Exposed Pipe Condition Report" on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropriate Engineer/Project Manager. System MAOP denoted by System MAOP = 60 PSIG Install Main Valves out of traffic where possible. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. Install one pound Anode for every 1000' of locating wire. Install Anode and Test Lead Wires per PSE Gas Operating Standards 2525.1200 and 2525.2300. If STW pipe involved, coordinate installation with CP Tech. ____________ Cell # ___________ . Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manual 0812 and 0813. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. Unless otherwise noted: All pipes installed in plat to be 2" MPE-___. All crossings to be Yellow 4" PVC. All Services to be 1-1/8" PE. / denotes service stub location. (________') denotes footage between fittings. Customer to dig and backfill on private property or easement only. Trenches must conform to PSE Gas Operating Standards 2525.1500, 2525.1600 and 2525.1700. Note all recordable footages, locations and material changes on the as-built in red. Upon completion of the project send the print copy, along with the completed work order, listing crew & actual materials used to the appropriate design group. On site pre-con required before start of job. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). Inclement weather conditions may cause delays in construction times and dates. 19. 20. 18. 16. 17. 15. 14. 13. 6. 9. 11. 12. 10. 8. 7. 3. 5. 4. 2. 1. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL L. BROWN 425.417.8620 . E. ARCIAGA . 10.18.21 E. PASAYE . 9.20.21 REDT # ( RW-112327 )RENTON FOREST TERRACE 2" MPE-___ GAS MAIN EXT. & (1) SCAT STUB - 25 S/F LOTS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY 107060327 105090858 1" = 50' 1 OF 3 KING 088A CIKNC 04NE-T23N-R05E 204.080 204.085 COMCAST JAMES COHN 253.569.0636 LUMEN KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . N/A N/A N/A ... 21. Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 510466889 107060327 N/A 106373096 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service Stubs Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter 4680 06/11 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 INSTALL 2" MPE-___ 23 FT JOINT 2" MPE-___ 1746 FT .. .. .. .. .. .. .. .. Cell Phone: Project Manager Contact Information: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager:LEE BROWN 425.417.8620 Lee.Brown@pse.com 60 IP 088-60 N/A N/A SITE PLAN xx INSTALL 2" = 23 FT JOINT 2" = 1746 FT ... ... ... KYLE.LUBLIN@PULTEGROUP.COM IP 088-60 STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / STOP TIME START TIME TESTED BY SOAP AIR NITROGEN WATER P F TYPE TEST / / DATE OFF PRESSURE DATE ON TEST RESULTS / / GASSED UP PIPELINE PIPE SEGMENT FOREMAN'S DATENAME 60 Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 CFH / HOME = 450 2" HVTT TIE-IN 29'N C/L & 7'W C/L ______'N C/L & _____'W C/L INSTALL 2" MPE-___ 23' @ 29'N C/L (______)' @ _____'N C/L BEGIN JOINT MAIN 29'N C/L & 30'W C/L ______'N C/L & _____'W C/L JOINT 2" MPE-___ 162' @ 29'N C/L (______)' @ _____'N C/L 2" 90° ELBOW 29'N C/L & 217'W C/L ______'N C/L & _____'W C/L JOINT 2" MPE-___ 58' @ 217'W C/L (______)' @ _____'W C/L 2" 90° ELBOW 29'S C/L & 217'W C/L ______'S C/L & _____'W C/L JOINT 2" MPE-___ 309' @ 29'S C/L (______)' @ _____'S C/L 2" INLINE TEE 29'S C/L & 29'E C/L ______'S C/L & _____'E C/L JOINT 2" MPE-___ 214' @ 29'E C/L (______)' @ _____'E C/L 2" CAP EOM/WIREBOX 193'N C/L & 29'E C/L ______'N C/L & _____'E C/L JOINT 2" MPE-___ 657' @ 29'S C/L (______)' @ _____'S C/L JOINT 2" MPE-___ 25' @ 29'N C/L (______)' @ _____'N C/L 2" POLYVALVE/OPEN W/ BOX & SUPPORT 29'N C/L & 55'W C/L ______'N C/L & _____'W C/L N Vicinity Map 47.5160, -122.1645 SITEMATCHLINE A-A (SEE PAGE 2)CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY LOCATION SIZE (IN)TYPE QTY X01 TR. A LOT 24 4 40 1 W 2 80 1 65 ( )' WCL GAS MAIN, PRIMARY - - - -3 80 1 65 ( )' WCL GAS MAIN, PRIMARY X02 LOT 24 LOT 1 2 40 1 W 3 80 1 65 ( )' ECL GAS SVC, SECONDARY X03 LOT 23 LOT 2 2 40 1 W 3 80 1 65 ( )' ECL GAS SVC, SECONDARY X04 LOT 22 LOT 3 2 40 1 W 3 80 1 65 ( )' ECL GAS SVC, SECONDARY X05 LOT 20 LOT 3 4 40 1 W 2 80 1 75 ( )' ECL GAS MAIN, FUTURE PRIMARY - - - -3 80 1 75 ( )' ECL SECONDARY X06 LOT 18 LOT 4 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY X07 LOT 17 LOT 5 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY X08 LOT 16 LOT 6 2 40 1 W 3 80 2 65 ( )' WCL GAS SVC, SECONDARY X09 LOT 15 LOT 8 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY X10 TR. E LOT 9 2 40 1 E 3 80 1 65 ( )' WCL GAS SVC, SECONDARY X11 'A' 'B' 4 40 1 N 2 80 1 110 ( )' SCL GAS MAIN, PRIMARY X12 TR. E LOT 10 4 40 1 W 2 80 1 65 ( )' WCL GAS MAIN, FUTURE PRIMARY - - - -3 80 1 65 ( )' WCL SECONDARY 2" PVC PLUG /CAPS = 16 2" YELLOW SCH 40 PVC = 520 FT 2" SCH80 GREY PVC = 315 FT 2" PVC PLUG /CAPS = 8 4" PVC PLUG /CAPS = 8 4" YELLOW SCH 40 PVC = 315 FT 3" SCH80 GREY PVC = 790 FT 3" PVC PLUG /CAPS = 24 INSTALL 1-1/8" MPE SCAT STUB 340'SCL & 7'ECL ______'S C/L & _____'W C/L 11.24.21 RESTORATION PER CITY OF RENTON STANDARDS MFP21005865 FLOW FLOW R55'53''A' 'B' THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL L. BROWN 425.417.8620 . E. ARCIAGA . 10.18.21 E. PASAYE . 9.20.21 REDT # ( RW-112327 )RENTON FOREST TERRACE 2" MPE-___ GAS MAIN EXT. & (1) SCAT STUB - 25 S/F LOTS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY 107060327 105090858 1" = 50' 2 OF 3 KING 088A CIKNC 04NE-T23N-R05E 204.080 204.085 COMCAST JAMES COHN 253.569.0636 LUMEN KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . N/A N/A N/A ... ... ... ... Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 42" 45°42" 1' 45°Property LineRoad Side Top View of Mainline Trench for Single Stubout Location 4'Property LineRoad Side Top View of Mainline Trench for Pedestal or Double Stubout Location 42"45° 4' 45° STUBOUT EXCAVATION DIMENSIONS NOT TO SCALE 1" = 50' SITE PLAN 2" INLINE TEE 29'S C/L & 628'W C/L ______'S C/L & _____'W C/L 2" CAP EOM/WIREBOX 29'N C/L & 779'W C/L ______'N C/L & _____'W C/L JOINT 2" MPE-___ 112' @ 29'S C/L TO 58'R (______)' @____'S C/L TO _____'R JOINT 2" MPE-___ 58' @ 628'W C/L (______)' _____'W C/L 2" 90° ELBOW 29'N C/L & 628'W C/L ______'N C/L & _____'W C/L JOINT 2" MPE-___ 151' @ 29'N C/L (______)' _____'N C/L NOT TO SCALE CROSS SECTION - NE 27TH PL LOOKING EAST S 53' ROW PROP. 2" MPE IP - 29'SCL N PROP. 2" MPE IP - 29'NCL GG NOT TO SCALE CROSS SECTION - SHELTON AVE NE LOOKING NORTH E 53' ROW PROP. 2" MPE IP - 29'ECL W G TYPICAL GAS SERVICE LINE TRENCH DETAIL RESIDENTIAL Excavated Dirt Pile 24" Min NOTE: Install 30" shading if the backfill contains rocks greater than 6" dia. 36" Min Cover Gas Service Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 30" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. 2" CAP EOM/WIREBOX 57'R & 740'W C/L ______'R & _____'W C/L MATCHLINE A-A (SEE PAGE 1)MFP21005865 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE ELEC Order Number SAP Sup Order Nbr PC APPROVAL L. BROWN 425.417.8620 . E. ARCIAGA . 10.18.21 E. PASAYE . 9.20.21 REDT # ( RW-112327 )RENTON FOREST TERRACE 2" MPE-___ GAS MAIN EXT. & (1) SCAT STUB - 25 S/F LOTS 2611 UNION AVE NE, RENTON, WA 98059 PUGET SOUND ENERGY 107060327 105090858 N/A 3 OF 3 KING 088A CIKNC 04NE-T23N-R05E 204.080 204.085 COMCAST JAMES COHN 253.569.0636 LUMEN KENNETH LUU 206.346.0144 RIGHT OF WAY AMBER YANG 425.456.2774 . . . N/A N/A N/A ... ... ... ... GAS SERVICE PIPE TABLE DESCRIPTION OF ACTIVITIES LOCATION PIPE DESIGN AS-BUILT FROM TO LOT SIZE (IN)TYPE LENGTH (FT)LOCATION LENGTH (FT) EFV SIZE LOCATION REMARKS LS SINGLE 2" MAIN 1 1 1/8 MPE-___65 ( )' ECL 2600 LS SINGLE 2" MAIN 2 1 1/8 MPE-___65 ( )' ECL 2600 LS SINGLE 2" MAIN 3 1 1/8 MPE-___65 ( )' ECL 2600 LS SINGLE 2" MAIN 4 1 1/8 MPE-___65 ( )' WCL 2600 LS SINGLE 2" MAIN 5 1 1/8 MPE-___65 ( )' WCL 2600 LS TWIN 2" MAIN 6 & 7 1 1/8 MPE-___65 ( )' WCL 2600 LS SINGLE 2" MAIN 8 1 1/8 MPE-___65 ( )' WCL 2600 LS SINGLE 2" MAIN 9 1 1/8 MPE-___65 ( )' WCL 2600 SS SINGLE 2" MAIN 10 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 11 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 12 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 13 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 14 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 15 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 16 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 17 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 18 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 19 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 20 1 1/8 MPE-___10 ( )' WCL 2600 SS SINGLE 2" MAIN 21 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 22 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 23 1 1/8 MPE-___10 ( )' ECL 2600 SS SINGLE 2" MAIN 24 1 1/8 MPE-___10 ( )' ECL 2600 LS SINGLE 2" MAIN 25 1 1/8 MPE-___65 ( )' SCL 2600 SCAT STUB SS SINGLES =15 735 FT 1 1/8" PE PIPE LS SINGLES =8 LS TWIN = 1 EX PLAT MAP 204.085 NOT TO SCALE Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) SITE MFP21005865