Loading...
HomeMy WebLinkAboutMFP21005732.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP21005732 IVR Number: 21005732 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:11/29/2021Application Date:7231501720Parcel Number: 801 HOUSER WAY S Permit Type:01/10/2022Issue Date:Franchise Permit Work Class:01/10/2023Expiration Date:Minor Utility Job Number: 101145003Franchise Type:Electric Description: Puget Sound Energy Electric AT J01 (317757 166057) CREW TO REPLACE EXISTING LID. AT HH01 CREW TO REPLACE EXISTING HANDHOLD AND LID. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Carli Bunkelman PSE/POTELCO - Billing 6905 S 228th St Kent, WA 98032 B: (253) 437-6708Contractor Business License Number: 5109Construction Contractor: POTELI*227PL SED REAL ESTATE LLC PO BOX 957 RENTON , WA 98057 Owner Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering 4 4 4 4 4 4 4 4 4 4 4 101129104 HOUSER WAY S AND WELLS AVE S Monday Friday 8:00am 3:00pm PLEASE SEE ATTACHED POTELCO, INC 425 892 0416 6905 S. 228TH ST KENT, WA 98032 MFP21005732 Scott Warlick CED 1/10/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date CORRIE RYDBERG RRRR18182020ONE WAY ONE WAY HOUSER WAY SONE WAYS 4TH ST2121 ONLY10101010BURNETT AVE SRRRR1212242222S 4TH STJ01M6-2CROSS HERESIDEWALK CLOSEDAHEADCROSS H E R E SIDEW A L K C L O S E D AHEAD CROSS HERESIDEWALK CLOSEDAHEADCROSS HERESIDEWALK CLOSEDAHEADW20-1ROADWORKAHEADRIGHTSHOULDERCLOSEDW21-5aRW1-4LUSE MAXIMUM AVAILABLESPACE FOR SIGNSW20-1ROAD WORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEAD W20-1ROADWORKAHEADWILLIAMS AVE S2020ONE WAY NPSEPUGETSOUNDENERGYJOB101129104Houser Way South, Renton, WA9/16/2020eduard.volianskyi@pse.comSHEET 1 of 2TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040WORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards in street manual.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Contact Metro @ 206-477-1150 for other restrictions.4. Channelizing devices are 28" traffic cones..Use traffic drums (barrels) with steady burningType C lights on all State Routes and Hwys.5. All signs are 30" x 30" B/O unless otherwise specified.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 3 p.m. unlessotherwise indicated.8. Staging areas are to be confined to limits of channeledwork space unless otherwise specified. All sidewalks andpassage areas are not to be infringed upon by materials, spoilpiles and equipment.9. Each page represents it's own traffic plan and stageof work. All spoil piles to be contained to limits of the trafficplan.MFP21005732 1212RRRR2020ONE WAY ONE WAY ONE WAY RRRR1818ONE WAY HOUSER WAY SHOUSER WAY S WELLS AVE SS 4TH ST1919S 4TH ST2121 2121 ONE WAY 1012HH01ONE WAYFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKCROSS HERESIDEWALK CLOSEDAHEADCROSS H E R E SIDEWA L K C L O S E D AHEADCROSS HERESIDEWALK CLOSEDAHEADCROSS HERESIDEWALK CLOSEDAHEADM6-2ROAD WORK AHEAD W20-1RIGHT SHOUL D E R CLOSE D W21-5aR100'100 '100 'W1-4L W20-1ROADWORKAHEADW20-1ROADWORKAHEADNPSEPUGETSOUNDENERGYJOB101129104Houser Way South, Renton, WA9/16/2020eduard.volianskyi@pse.comSHEET 2 of 2TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425SIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040WORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards in street manual.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Contact Metro @ 206-477-1150 for other restrictions.4. Channelizing devices are 28" traffic cones..Use traffic drums (barrels) with steady burningType C lights on all State Routes and Hwys.5. All signs are 30" x 30" B/O unless otherwise specified.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 3 p.m. unlessotherwise indicated.8. Staging areas are to be confined to limits of channeledwork space unless otherwise specified. All sidewalks andpassage areas are not to be infringed upon by materials, spoilpiles and equipment.9. Each page represents it's own traffic plan and stageof work. All spoil piles to be contained to limits of the trafficplan.MFP21005732 ••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••REPLACEGRA-17REPLACE GRA-17HOUS E R W A Y S WILLIAMS AVE SWELLS AVE S101145003ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. SCALE: NONE UNIVERSAL CIRCUIT MAP (2305E067, 072) No No No Yes Yes Yes "Flagging Required" "Outages Required" "Locates Required" HOUSER WAY BNSF IMPROVEMENTS PI RELOCATION PSE CAPITAL PROJECT Owner / Developer Contact Info officeATTN: Jordan Howe jordan.howe@perteet.com Construction Manager 206-436-0515PHONE CABLE TV 11796824 101145003 108133585 PROJECT PHASE PWR NOTIF#ORDER# Superior Removal UG Expense 594147531 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) LEGEND CONDUIT RISER OVERHEAD TRANSFORMER JUNCTION VAULT/JUNCTION BOX NEW CONDUCTOR AND OR TRENCH LINE DISCONNECT - FUSED PULL VAULT OR SPLICE VAULT EXISTING POLE DOWN GUY DISCONNECT - UNFUSED NEW POLE PADMOUNT TRANSFORMER SECONDARY HANDHOLE EXISTING CONDUCTOR TO BE REMOVED OR ABANDONED STREET LIGHT TOTAL UNDERGROUND TRANSFORMER ENERGY CUSTOMER DEMAND POINT OR OR OR OVERHEAD JUMPER CONNECTION JOB SITE UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP GARY BRADLEY 253-343-3754 11-9-21 ALICIA PAULSEN 253-259-1740 11-9-21 N/A N/A N/A ALICIA PAULSEN 253-259-1740 11-9-21 N/A CITY OF RENTON HOUSER WAY BNSF IMPROVEMENTS VAULT LID AND HH REPLACEMENT HOUSER WAY S AND WELLS AVE S RENTON, WA 98057 N/A N/A N/A 101145003 AS NOTED 1/1 King N/A N/A CSPSKEPI N/A N/A N/A 2305E067, 072 2305E076, 088 N/A GRA-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A E-Mail: Cell Phone: Project Manager Contact Information: Manager:GARY BRADLEY (253) 343-3754 GARY.BRADLEY@pse.com JOB SITE SITE PLAN SCALE: 1" = 20' Vault & Equipment Table Site Working Space Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Material Information Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete (Include Transformer Phase Tapped and Test Secondary Voltage)LB DC J01 REPLACE 317757 166057 4'8" SQ SEC JBOX MID:9996161 -- SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks HH01 HANDHOLE 4 HH14350AS SITE SPECIFIC NOTES: J01 REPLACE WITH NON-SKID LID AND RAISE 1" HIGHER TO MATCH FINAL GRADE HH01 EXCAVATE TO REPLACE EXISTING HANDHOLE WITH NON-SKID LID RAISE HH 1" TO MATCH FINAL GRADE SINGLE PHASE SECONDARY CONCRETE HANDHOLE Not to scale 6050.2020-1 TOP VIEW SIDE VIEW 2'-4" EXCAVATION: 5-1/3 CUBIC YARDS 7'-0" 6'-0" 2" 2'-6" Install PVC bell endsand grout into wall 2'-6" Handhole 820 lbs Conduits and conductors shall enter fromends of handhole through knockouts provided Typical customer runservice conductors in duct Steel Door Seal conduitwith foam Customer-installed grounding wires ( the "4th" wire on the single-phase systems and the "5th" wire on the three-phase systems) shall not be connected to PSE's ground or neutral bus. They shall be removed by customer or cut off at the vault wall. 6" Crushed rock Scope of Work RAISING VAULT LID ON JBOX TO BE FLUSH WITH NEW GRADE AND REPLACING EXISTING HH 2-60 1-1a MFP21005732 RESTORATION PER CITY OF RENTON STANDARDS