Loading...
HomeMy WebLinkAboutHarvard Ltr w/decision � Denis Law Mayor � City Clerk-Jason A.Seth,CMC April 10, 2017 Peter Harvard Gabbert Architects Planners 20011 Ballinger Way NE, #211 Shoreline, WA 98155 Subject: Hearing Examiner's Order on Reconsideration Request RE: Cedar Ridge Church Expansion (LUA-16-000128) Dear Mr. Harvard: Enclosed please find the Hearing Examiner's Order on Reconsideration Request dated April 10, 2017. I can be reached at (425) 430-6510 or jseth@rentonwa.gov. Thank you. Sincerely, ,� Jason A. Seth, CMC City Clerk cc: Hearing Examiner Jill Ding,Senior Planner Jennifer Henning, Planning Director Vanessa Dolbee, Current Planning Manager Brianne Bannwarth, Development Engineering Manager Craig Burnell, Building Official Jennifer Cisneros,Secretary, Planning Division Julia Medzegian,City Council Liaison Parties of Record(6) 1055 South Grady Way, Renton,WA 98057 • (425)430-6510/Fax (425)430-6516 • rentonwa.gov 1 2 3 4 5 6 7 8 BEFORE THE HEARING EXAMINER FOR THE CITY OF RENTON 9 � 10 RE: Cedar Ridge Church Expansion � ORDER ON RECONSIDERATION ) REQUEST 11 Conditional Uses and Variance � ) 12 ) LUA16-000128, ECF, CU-H, V-A ) 13 � 14 A Final Decision on the above-captioned matter was issued on January 25, 2017. By 15 letter dated February 8, 2017, the Applicant requested reconsideration on the basis that "We 16 request a S-year maximum approval period, rather than the standard 2 years, renewable for 2 17 more years." City staff reyuested that the hearing examiner delay issuance of a decision on the 18 reconsideration request to provide time to issue a formal interpretation on City development 19 standards that govern the expiration dates of conditional use permits. The examiner granted the 20 request. A formal interpretation was issued on March 9, 2017. The appeal period for the 21 interpretation request ends April 7, 2017. No appeals were filed. 22 Since the examiner may grant the reconsideration request, affected parties have a right to 23 comment on the request to extend the expiration period to five years. 24 25 26 ORDER ON RECONSIDERATION REQUEST - 1 1 2 3 4 ORDER 5 Any persons who testified or submitted written comments on the above-captioned 6 matter may submit a written response to the Applicant's request for reconsideration. Persons 7 wishing to comment should submit their written comment by 4:30 pm, April 20, 2017 to the 8 Renton City Clerk's Office by email (C�1,,�a��i��E����t.����ti��.���,��) or personal delivery or mail to 9 Cynthia Moya, Renton City Clerk's Office, Renton City Hall, 1055 S. Grady Way, Renton, WA 10 98057. All comments must be received by the due date. Should anyone write a response, the 11 Applicant shall have until 4:30 pm April 26, 2017 to submit a written reply to the City Clerk's 12 Office. 13 14 15 DATED this l Oth day of April, 2017. 16 _. , r-_ 17 �_ .:-...._:��`::�.�.�--'-�''�_—_..�__.�._.w. �... Ph� A. C)Ibc�cchts 18 City of Renton Hearing Examiner 19 20 21 22 23 24 25 26 ORDER ON RECONSIDERATION REQUEST- 2 � CITY �F 4 ♦ ,.�,.°� ��� �:.'x: ��� Department of Community and Economic Development Planning Division ADMINISTRATIVE POLICY/CODE INTERPRETATION ADMINISTRATIVE POLICY/CODE INTERPRETATION#: CI-113 MUNICIPAL CODE SECTIONS: RMC 4-9-030 Conditional Use Permits REFERENCE: N/A SUBJECT: Extended Approval for Conditional Use Permits (CUPs) BACKGROUND: RMC 4-9-030F.8 specifies that the Administrator or Hearing Examiner may "limit the term and duration of the Conditional Use Permit." RMC 4- 9-030F.9 specifies that the CUP is valid for a period of two (2) years with a possible two (2) year extension. Previously, the City had utilized RMC 4-9- 030F.8 to extend CUP approvals beyond the standard two (2) year approval. However, it has come to the City's attention that the use of the word "limit" in RMC 4-9-030F.8 implies that the decision maker only has the ability to reduce the duration of the CUP approval to less than the standard two (2) year approval and may not be used to extend the approval beyond the standard two (2)year time frame. JUSTIFICATION: There are certain land uses, which require a CUP, where an extended approval is practical (i.e. for projects that are anticipated to be constructed in phases). DECISION: Amend RMC 4-9-030F, as specified below, to allow the decision maker the flexibility to extend the period of validity for a CUP beyond the standard two (2) year time frame. ADMINISTRATOR APPROVAL: C. E. "Chip" Vincent EFFECTIVE DATE: March 24, 2017 H:\CED\Planning\Title IV\Docket\Administrative Policy Code Interpretation\CI-113\Code Interpretation.docx APPEAL PROCESS: To appeal this determination, a written appeal--accompanied by the required filing fee--must be filed with the City's Hearing Examiner(1055 South Grady Way, Renton, WA 98057, 425-430-6515) no more than 14 days from the date of this decision. Your submittal should explain the basis for the appeal. Section 4-8-110 of the Renton Municipal Code provides further information on the appeal process. CODE AMENDMENTS NEEDED TO IMPLEMENT DETERMINATIONS: 4-9-030 Conditional Use Permits F. Procedures 8. Decision and Conditions:The Administrator may grant a Conditional Use Permit, with or without conditions, or deny the requested Conditional Use Permit.The Administrator or Hearing Examiner shall have authority to grant the Conditional Use Permit upon making a determination, in writing, that the use is consistent with the applicable decision criteria in this Section. The Administrator or Hearing Examiner may require additional setbacks, fencing, screening, soundproofing, public improvements or any other appropriate measures necessary to ensure compatibility with the surrounding neighborhood, and may� specifv the term and duration of the Conditional Use Permit. Conditions imposed by the Administrator or Hearing Examiner shall reasonably assure that nuisance or hazard to life or property will not develop. 9. Timeline to Apply for Associated Permits: Building permits, licenses or land use permits required for the operation of a Conditional Use Permit shall be applied for within two (2) years of the date of Conditional Use Permit approval, unless an extended time frame is�ranted bv the Administrator or Hearin� Examiner. A single two (2) year extension may be granted for good cause by the Administrator. (Ord. 5675, 12-3-2012) STAFF CONTACT: Jill Ding x 6598 CI-113 Page 2 of 2