HomeMy WebLinkAboutContract2022 – 2024
CONTRACT GROUNDSKEEPING
For
City of Renton Public Property
CITY OF RENTON
PARKS AND RECREATION DEPARTMENT
PARKS PLANNING & NATURAL RESOURCES DIVISION
1055 South Grady Way
RENTON, WASHINGTON 98057
CITY REPRESENTATIVE:
IAN GRAY
(425)430-6601 igray@rentonwa.gov
Parks and Recreation Department
1
CAG-22-008
SYNOPSIS OF CONTRACT SERVICES INFORMATION
A.Contract: 2022 through 2024 Contract Groundskeeping.
B.Contract Description:
The contractor will furnish all labor, materials, and equipment to
perform groundskeeping services for listed rights-of-way, park, open space
areas, trails, City facilities and all associated street frontages, parking lots, and
sidewalks. This contract covers a period of three years, provided funding is
available in any of the years.
C.Contract Locations: Rights-of-Way, Facilities, Parks, Trails, and Open Space
Groundskeeping (see maps)
1.Park Ave. N. Frontage. From North 1st Street to North 6th Street, both sides of street. Clean
sidewalks, curblines and tree grates. Remove litter, leaves, and weeds. Keep debris from entering
private property.
2.North 3rd Street Frontage. From Burnett Avenue North to Factory Avenue North, both sides of
street. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add
wood chip mulch to tree rings. Keep debris from entering private property. Protect homeowner
flower plantings.
3.Northeast Park Drive Frontage. From Logan Avenue North to 400 feet east of I-405, north side
of street only. Clean sidewalks and curblines. Remove litter, leaves and weeds. Mow turf north of
sidewalk. Lightly prune shrubs and groundcovers to keep within planting strips. Add wood chip
mulch. Keep debris from entering streets.
4.Boeing Frontage. Park Avenue North from North 6th Street to North 7th, only boulevards on
north and south side of Boeing pedestrian bridge. From North 7th Street to North 8th Street, both
sides of street and boulevards. North 8th Street, south side only, from Garden Avenue North to
Logan Avenue North. Logan Avenue North, east side only, from North 6th Street to North 8th Street.
Mow and edge planting strips, clean sidewalks and curblines, remove litter, leaves and weeds.
Lightly prune shrubs and groundcovers to keep within boulevards or to rejuvenate. Add fine pine
bark mulch to shrub beds and tree rings. Keep debris from entering private property.
5.Houser Way By-Pass Boulevard. Shrub bed north of 430 Sunset Boulevard Northeast (on
Sunset), at end of I-405 exit ramp. Clean curblines. Remove litter, leaves, and weeds. Lightly prune
shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch.
Keep debris from entering surrounding street areas.
6.Sunset Boulevard North Frontage. East side of Sunset Boulevard North from Bronson Way
North (SR 169) to Northeast 3rd Street, including beneath south side of I-405 overpass. Clean
sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune groundcovers to keep
within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering
surrounding street areas.
7.Factory Place North Triangle. Vacant lot east of 1526 N. 3rd Street. Mow and edge turf. Clean
sidewalks and curblines. Remove litter, leaves and weeds. Keep debris from entering private
property.
2
8.South Cedar Avenue. Between South 4th Street and Houser Way South, including beneath the
south side of I-405 overpass. Includes seating area, all shrub beds, and stairway. Clean staircase,
curblines and parking lots. Remove litter, leaves, and weeds. Lightly prune shrubs and
groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris
from entering surrounding street areas and private properties.
9.I-405 Wall at Cedar River Park. From Houser Way underpass to Maple Valley Highway (SR 169
off ramp). Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune shrubs
and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep
debris from entering surrounding park areas.
10.Cedar River Park Frontage. South side of SR 169 from I-405 to park’s east property line,
including the center boulevard and 180’ south along park entrance both sides of road. Operate and
maintain irrigation system. Mow and edge turf. Clean sidewalks and curblines. Remove litter,
leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to
rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park
areas.
11.Maple Valley Berm/Frontage. North side of SR 169 from 140th Place Southeast to 149th
Avenue Southeast. Mow turf. Clean pathway. Remove litter, leaves, and weeds. Add wood chip
mulch to tree rings. Keep debris from entering street, pathway and park areas.
12.Northeast Sunset Boulevard Triangle. Sunset Boulevard Northeast and Northeast Park Drive,
north of 1170 Sunset Boulevard Northeast. Mow and edge turf. Clean sidewalks and curblines.
Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering
surrounding streets and private property.
13.Northeast Sunset Boulevard Frontage. Edmonds Avenue Northeast to 2502 Northeast
Sunset Boulevard, first driveway on north side of Sunset; sidewalks only, both sides of street. From
2502 NE Sunset Boulevard to Harrington Ave. NE; sidewalks both sides of street and turf areas
(north side of street, north of sidewalk to fence). From Harrington Avenue Northeast to Northeast
12th Street, south side only up to but not including Walgreens, sidewalk and planting strips. Mow
and edge turf. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Keep debris from
entering streets and pivate property areas.
14.Harrington Avenue Northeast Boulevard. Harrington Avenue Northeast and Northeast 5th
Street (north of 2721 Harrington Avenue NE). Mow turf. Remove litter, leaves, and weeds. Keep
debris from entering surrounding streets and private property areas.
15.Northeast 2nd Street Frontage. North side of Northeast 2nd Street from Monroe Avenue
Northeast to Public Works gate at 3555 Northeast 2nd Street. Clean curblines. Remove litter,
leaves, and weeds. Lightly prune shrubs to keep within planting bed or to rejuvenate. Add wood
chip mulch. Keep debris from entering street.
16.Public Works Shops, Saturday Only Site. 3555 Northeast 2nd Street. Mow turf and edge.
Clean employee parking lots, sidewalks and curblines. Remove litter, leaves and weeds. Lightly
prune shrubs and groundcovers to keep within planting beds, clear building walls or to rejuvenate.
Add fine pine bark mulch to tree wells and shrub beds.
3
17. Northeast 4th Street Frontage. North side of street from Union Avenue Northeast to 4350
Northeast 4th Street and; south side of street from 4301 to 4405 Northeast 4th Street. Mow and
edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Add fine pine bark
mulch to tree wells. Keep debris from entering surrounding street and private property areas.
18.Harrington Avenue Northeast Frontage. West side of street from Northeast 16th Street, south
to Northeast 12th Street. East side of street, from Northeast 16th Street to Northeast 10th Street.
Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly
prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip
mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets and
private property areas.
19.Duvall Avenue Northeast Frontage. West side of street from 1827 Duvall Avenue Northeast
to 4626 Northeast 24th Street, then from 2501 Duvall Avenue Northeast at wall to Renton city
limits. East side of street from 1702 Duvall Avenue Northeast to 2322 Duvall Avenue Northeast,
then from driveway at 4702 Northeast 25th Street to Southeast 95th Way intersection. Clean
sidewalks and curbline. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers
to keep within beds, at or below 3 feet in height for visual clearance at intersections or to
rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding
streets and private property areas.
20.Creek Parkway Frontage. East side of street from NE 95th Way to Southeast May Valley Road.
Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune trees and shrubs to
keep within beds. Add wood chip mulch to tree and shrub beds.
21. Talbot Road Frontage. South of I-405 overpass to South Puget Drive, including beneath
overpass. Mow and edge turf. Remove litter, leaves and weeds. Add fine pine bark mulch to tree
rings. Keep debris from entering surrounding private property.
22.Lake Avenue Open Space. Vacant lot at 1511 Lake Avenue South. Mow turf. Remove litter,
leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding
private property.
23.Talbot Hill Reservoir Park. 1900 Talbot Road South. Mow and edge turf, including along
streets. Clean parking lot. Remove litter, leaves and weeds. Empty trash cans and replace with
new liners. Lightly prune groundcover and shrubs to keep within beds, clearance along walls, or to
rejuvenate. Add wood chip mulch to tree rings and shrub beds.
24.Shattuck Avenue South Frontage. Between Houser Way South and South 4th Place, both sides
of street and beneath railroad overpass. Remove litter, leaves and weeds. Lightly prune shrubs
and groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep
debris from entering surrounding streets and private property areas.
25.Rainier Avenue South Frontage. Between South Grady Way and 250 Rainier Avenue South,
both sides of street and boulevards. Clean sidewalks and curblines. Remove litter, leaves and
weeds. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual
clearance. Add wood chip mulch to boulevard tree and shrub beds; add fine pine bark mulch to
planting strips. Keep debris from entering surrounding private property.
4
26.Southwest Grady Way Frontage. North side of Southwest Grady Way
fromOakesdale Avenue Southwest to Longacres Avenue Southwest at King County Metro
driveway, 1520 Southwest Grady Way. Mow and edge turf. Clean sidewalks and curblines.
Remove litter, leaves and weeds between street and fence, including gateway sign area. Lightly
prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add
wood chip mulch to boulevard tree and shrub beds. Keep debris from entering surrounding
streets.
27.Oakesdale Avenue Southwest/Black River Frontage. Between 602 Oakesdale
Avenue Southwest and 1,060 feet north to end of sidewalk on Monster Road Southwest, north
side of street, including the center boulevard. Mow turf and edge. Clean parking lot, sidewalks
(including bridge) and curblines. Remove litter, leaves and weeds. Empty trash containers
and replace liners. Keep debris from entering street.
28.Southwest 27th Street Frontage. From Oakesdale Avenue Southwest to Naches
Avenue Southwest, both sides of street, including center boulevard. Mow and edge turf. Clean
bike path, sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to
tree rings. Keep debris from entering surrounding streets and private property areas.
29.Springbrook Trail. Segment 1: From Black River Riparian Forest trailhead along
Oakesdale Avenue Southwest to Southwest 16th Street. Mow turf. Clean trail, sidewalks and
curblines. Remove litter, leaves, moss and weeds. Lightly prune trees/shrubs to keep out of trail
shoulders. Empty trash containers and replace liners. Segment 2: At 800 Southwest 27th Street
beginning 1,055 feet north of Southwest 27th Street to Southwest 43rd Street. Mow turf. Clean
trail, sidewalks and curblines. Remove litter, moss, leaves and weeds. Lightly prune shrubs to
keep out of trail shoulders. Pressure wash trail boardwalk segment south of Southwest 27th
Street. Empty trash containers and replace liners.
30.Springbrook Trail – Boeing-Longacres Segment (From SW 16th Street to the north property
line and parking lot at 1905 Raymond Avenue SW, a total distance of approximately 1,460 feet.
Clean trail, remove litter, control moss, and clean 2 interpretative signs.)
31.Edlund Farm Open Space. 17611 Southeast 103rd Avenue. Mow field, planting strip and
edge along street. Clean sidewalks and curblines. Remove litter. Exclude immediate areas
around houses maintained by residents.
32.Cleveland Farm Open Space. 19415 Talbot Road South. Mow fields. Remove litter.
Control blackberry shrubs at Southwest entrance. Exclude area around house maintained by
residents. Schedule field mowing during periods of dry soil conditions.
33.11017 SE 186th Place. Vacant lot. Mow field. Clean sidewalk and curbline. Remove
litter. Control blackberry.
5
34. Tiffany-Cascade Connector Trail and Frontage. East of 12130 Southeast 160th Street. Mow grass
north of sidewalk/street and two passes on trail from Southeast 160th Street to pipeline. Clean
sidewalks and curblines. Remove litter. Keep debris from entering surrounding streets.
35.Lake Washington Boulevard North Frontage. 4350 Lake Washington Boulevard North. Mow and
edge turf. Clean sidewalks and curblines, including east side of bridge. Remove litter, leaves and
weeds. Add wood chip mulch to tree rings. Empty trash container and replace liner. Keep debris from
entering street.
36.May Creek Trail. 4350 Lake Washington Boulevard North. Control invasive plants including
blackberry, knotweed, and horsetail in natural area. Clean area of litter.
37.Seahawks Sign. Southwest corner of Seahawks Way and Lake Washington Boulevard North. Clean
sidewalk and curblines. Lightly prune shrubs and groundcover to keep within beds, maintain sign
visibility or to rejuvenate. Remove litter, leaves and weeds. Add fine pine bark mulch.
38.Ripley Lane Trail. East of 5031 Ripley Lane North at trailhead, then 875 feet north to Renton city
limits. Mow and edge turf, including street frontage. Clean pathway and street of litter, stones/debris,
leaves and weeds. Prune vegetation away from fence or to keep trail open to both sides. Empty trash
can and replace with new liner.
39.New Sunset Park 2715 Block NE 10 Street: Two open fields between Sunset Lane NE and NE 10
Street; weed two detention ponds. Clean sidewalks and curblines. Mow turf and edge. Remove litter,
leaves and weeds. Add wood chip mulch to detention pond.
40.Logan Avenue North Frontage The east side of Logan Avenue North, including boulevards and east
side of sidewalks, from the Cedar River, north to North 6th Street. Boulevards, sidewalks, curblines,
and shrub beds.
41.Duvall Avenue Northeast Boulevard. Two boulevards north and south of NE 8th Street. Clean
curbline. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds,
at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood chip mulch
to tree and shrub beds. Keep debris from entering surrounding streets.
42.Heritage Park Shrub Bed. 233 Union Avenue NE: Large shrub bed between turf and asphalt
pathway. Remove litter, leaves and weeds. Add wood chip mulch. Added shrub bed area.
43.Harrington Avenue Northeast- South Unit Frontage. East side of street from Northeast 8th Place,
south to Northeast 7th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves
and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add
wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets
and private property areas.
44.Sunset Lane and NE 10 Street Frontages. 2680 Sunset Lane NE: Beginning at the intersection of NE
Sunset Boulevard and NE 10 Avenue moving counterclockwise: Newly created planting strips between
sidewalks and curbs along the north side of NE 10 Street from NE Sunset Boulevard to Glenwood
Avenue NE; also both sides of street adjacent to the Renton Highlands Library on NE 10 Avenue; along
the southerly and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th Avenue at
the library; along Harrington Avenue NE between NE Sunset Boulevard and Sunset Lane NE on both
sides of the street; along both sides of the street on Glenwood Avenue NE and along both sides of
Harrington Avenue NE north of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of
NE 10 Street. Sidewalks, curblines, and shrub beds containing shrubs, groundcovers, perennials and
mulch. Remove litter, leaves and weeds. Add wood chip mulch.
45.Sunset Park Phase Two. 2715 Block NE 10 Street: new park area south of New Sunset Park
between Sunset Lane NE and NE 10 Street; weed rain gardens. Clean sidewalks and curblines. Mow
turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to beds and gardens.
6
City of Renton
Contract Groundskeeping
The City of Renton has requested services for CONTRACT GROUNDSKEEPING.
The Contractor will provide three (3) years of complete groundskeeping services,
including materials and supplies, for at least 45 sites through December 31, 2024,
based upon available funding in any given year.
Questions and requests shall be addressed to:
Ian Gray - Project Manager, Urban Forestry & Natural Resources
City of Renton
Community Services Department
1055 South Grady Way, 6th Floor
Renton, WA 98057
Telephone (425) 430-6601
Email: igray@rentonwa.gov
7
PROPOSAL FORM FOR CONTRACT GROUNDSKEEPING
To: Ian Gray CITY OF RENTON
COMMUNITY SERVICES DEPARTMENT
CITY HALL -6TH FLOOR
1055 SOUTH GRADY WAY RENTON, WA 98057
The undersigned hereby certifies that they have carefully examined the Request for Proposal entitled "CONTRACT GROUNDSKEEPING" and they have examined the site of the work and the location where said work is to be performed, and fully understands the manner in which payment is proposed to be made for the cost thereof, hereby proposes to furnish all materials and to perform all labor which may be required to complete said work upon the terms
and conditions provided in the said Request for Proposal for consideration of the following amount:
A.PROPOSAL
For all work specified in the Request for Proposal for Contract Groundskeeping, the lump sum of:
Two hundred seven thousand, six hundred eighty two dollars and
Amount in writing
seventy-three cents dollars($ 207,682.73 l including tax, PER YEAR.Amount in number
The following breakdown of cost is requested for City of Renton budget purposes only. The lump sum cost per year provided above will be the only cost used in evaluating the proposal.
B.CONDITIONS OF PROPOSAL
1.Overhead and Profit:
The above Proposal Price shall include overhead and profit.
2.Sales Tax:The above p roposal shall include Washington State Sales Tax.
C.PERIOD OF PROPOSAL VALIDITY/ACCEPTAN CE OF PROPOSAL
1.Validity of ProposalThe undersigned hereby agrees that this PROPOSAL as described in paragraph "A" shall be a valid
and firm offering for the period of sixty (60) days from closing time for the "Receipt of Proposals."
2.Acceptance of ProposalWithin sixty (60) days after the opening of FORM OF PROPOSAL, the City will act either to acceptthe Propo sal from the selected contractor or to reject the Propo sal. The City reserves the right to
request extensions of such Proposal acceptance period. The acceptance of a Proposal will be
evidenced by a written Notice of Intent to Award Contract to the Contractor whose Proposal is under
17
8
consideration for acceptance, together with a request to furnish evidence of insurance to execute the
agreement set forth in the Request for Proposal.
D.EXECUTION OF CONTRACT
If written "Notice of Intent to Award Contract" is mailed, emailed, telegraphed, facsimiled, or delivered to the
undersigned within the •period of Proposal Validity• noted above, or any time thereafter before this Proposal is
withdrawn, the undersigned will, within the (10) days after the date of such notification, execute a Contract in
the form provided in the Request for Proposal.
E.EXECUTION OF PROPOSAL
Name of Firm Canber Corps
Address PO Box 2668
City Renton State WA Zip Code 98056
Telephone _____ { ..... 4 .... 2 ..... 5___._}_2_7_1-_8_27_2 ____ FAX ( 425 ) 271-8316
The undersigned designates the above as the firm and address to which "NOTICE OF CONTRACT AWARD" may be
mailed, emailed, hand delivered, or delivered via facsimile.
NOTE: If a Contractor is a corporation. write state of incorporation; and if a partnership, give full names and addresses
of all partners below:
Washington state
The undersigned certifies that the above is a firm and valid PROPOSAL to accomplish all work and comply with all
requirements of the Request for Proposal.
Date 9/29/21
Signature�
Signed
Title President
Jeff Candler
Printed
18
9
COMBINED AFFIDAVIT AND CERTIFICATION FORM
Non-Collusion, Anti-Trust, and Minimum Wage
NON-C OLLUSION AFFIDAVIT
Being duly sworn, deposes and says, that he is the identical person who submitted the foregoing Proposal or
Proposal, and that such Proposal is genuine and not sham or collusive or made in the interest or on behalf of any
person not therein named, and further, that the deponent has not directly induced or solicited any other Proposer on
the foregoing work or equipment to put in a sham Proposal, or any other person or corporation to refrain from
proposing, and that deponent has not in any manner sought by collusion to secure to himself or to any other person
any advantage over other Proposer or Proposers.
AND
CERTIFICATION RE: ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER
Vendor and purchaser recognize that in actual economic practice overcharges resulting from anti-trust violations are in
fact usually borne by the purchaser. Therefore, vendor hereby assigns to purchaser any and all claims for such over
charges as to goods and materials purchased in connection with this order or contract, except as to overcharges
resulting from anti-trust violations commencing after the date of the Proposal. quotation, or other event establishing
the price under this order or contract. In addition, vendor warrants and represents that such of his suppliers and
subcontractors shall assign any and all such claims to purchaser, subject to the aforementioned exception. AND
MINIMUM WAGE AFFIDAVIT FORM
I, the undersigned, having been duly sworn, deposed, say, and certify that in connection with the performance of the
work of this project, I will pay each classification of laborer, workman, or mechanic employed in the performance of
such work; not less than the prevailing rate of wage or not less than the minimum rate of wages as specified in the
principal contract: that I have read the above and foregoing statement and certificate, know the contents thereof and
the substance as set forth therein is true to my knowledge and belief.
FOR: NON-COLLUSION AFFIDAVIT, ASSIGNMENT OF ANTI-TRUST CLAIMS TO PURCHASER AND MINIMUM
WAGE AFFIDAVIT.
Proposal for Groundskeeping
Name of Project
Canber Corps
Name of Proposefs Firm
�nature of Authort!ed Re presentative of Proposer
Notary Public in and for the State of Washington
Residing at Hobart, WA
23 10
Certification of Compliance with Wage Payment Statutes
The bidder hereby certifies that, within the three-year period immediately preceding the
proposal solicitation date, the proposer is no t a "willful" violator, as defined in RCW 49.48.082, of
any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation
and notice of assessment issued by the Department of Labor and Industries or through a civil
judgment entered by a court of limited or general jurisdiction.
I certify under penalty of perjury under the laws of the State of Washington that the foregoing is
true and corre ct.
Canber Corps
Proposer's Business Name
Signature of Authorized Official•
Jeff Candler
Printed Name
President
Title
9/30/21 Renton WA
Date City State
Check One:
Sole Proprietorship D Partnership □Joint Venture □Corporation � LLC □
State of Incorporation, or if not a corporation, State where business entity was formed:
Washington
If a co-partnership, give firm name under which business is tran sacted:
*If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate
officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.
Template updated 2-12-19
11
THIS AGREEMENT (“Agreement”) is made as of the_______day of_______, 2021, (the “Effective
Date”) by and between the City of Renton, a non-charter code city under RCW 35A,
and a municipal corporation under the laws of the State of Washington
(“City”), through its Parks and Recreation Department and Canber Corps, (“Contractor”), a
company, who are collectively referred to as the “Parties”, to provide
groundskeeping services, City and Contractor agree as set forth below.
1.Scope of Services: Contractor will provide all material and labor necessary to perform all
work described in the Proposal which is attached and fully incorporated into this
Agreement by reference as Attachment “A” - the “Frequency Schedule.” The Costs
associated with each site and service frequencies are referenced in this Agreement as
Attachment “B” “Section 8-B, 2022-2024 Cost Per Task”.
2.Changes in Scope of Services: City, without invalidating this Agreement, may order
changes to the Scope of Services consisting of additions, deletions or modifications, the
Agreement Sum being adjusted accordingly by Parties mutual agreement. Such changes
in the work shall be authorized by written Change Order signed by the Parties.
3.Time of Performance: Contractor shall commence performance of the Agreement no later
than 30 calendar days after the Agreement’s Effective Date.
4.Term of Agreement: The Term of this Agreement shall end at completion of the Scope of
Services, on December 31st, 2024. This Agreement may be extended to accomplish
change orders, if required, upon mutual written agreement of City and Contractor.
Termination:
A.The City reserves the right to terminate this Agreement at any time, with or
without cause by giving ten (10) calendar days’ notice to the Contractor in writing.
B.In the event this Agreement is terminated by the City, the Contractor shall be entitled
to payment for all hours worked to the effective date of termination, less all
payments previously made. If the Agreement is terminated by the City after partial
performance of Work for which the agreed compensation is a fixed fee, the City shall
2022-2024 Contract Groundskeeping Agreement
12
CAG-22-008
14th January
pay the Contractor an equitable share of the fixed fee. This provision shall not prevent
the City from seeking any legal remedies it may have for the violation or
nonperformance of any of the provisions of this Agreement or from withholding
payment for reasonably disputed charges. No payment shall be made by the City for
any expenses incurred or work done following the effective date of termination unless
authorized in advance in writing by the City.
5.Agreement Sum: The total amount of this Agreement is the sum of $207,682.73
which includes Washington State Sales Tax. This amount may be adjusted to a mutually
agreed amount based on changes to the Scope of Services.
6.Consideration: In exchange for Contractor’s performance of the items and responsibilities
identified in the Scope of Services, City agrees to make payment of the amount identified as
the Agreement Sum.
7.Prevailing Wage/ Method of Payment/ Retainage/ Bonding: Payment by the City for the
Work will only be made after the Work has been performed and a voucher or invoice is
submitted in a form acceptable to the City.
A.Prevailing Wage Rates:
Contractor must comply with the State of Washington prevailing wage requirements.
Contractor must file an Intent To Pay Prevailing Wage at the beginning of the project
and at the beginning of each calendar year and an Affidavit of Wages Paid at the end
of each calendar year and at the end of the project with the Washington State
Department of Labor and Industries. *Final payment will be held until Affidavit of
Wages Paid is submitted for each period/calendar year or end of project.
The State of Washington prevailing wage rates applicable for this project, which is
located in King County, may be found at the following website address of the
Department of Labor and Industries:
http://www.lni.wa.gov/TradesLicensing/PrevWage/default.asp
http://www.lni.wa.gov/TradesLicensing/PrevWage/WageRates/default.asp Pursuant
to WAC 296-127-011, the applicable effective date for prevailing wage rates paid for
the duration of this contract shall be the date the contract is executed as reflected in
the “Effective Date” identified at the top of the first page of this Agreement.
Upon request, the City will provide a copy of the applicable prevailing wages for this
project. Alternatively, the rates may be viewed at the City of Renton City Hall by
making an appointment with the contact person identified herein or prior to contract
award with the contact person identified as the City of Renton contact in Paragraph
13
p.a.
(for a 3-year total of $623,048.19)I.G.
J.C.
C.L.B
15 Notices of this agreement.
B.City shall have the right to withhold payment to Contractor for any work not
completed in a satisfactory manner until such time as Contractor modifies such work
so that the same is satisfactory.
C.Final Acceptance. Final Acceptance of the Project occurs when the Urban Forestry &
Natural Resources Manager has determined that the Project is one hundred percent
(100%) complete and has been constructed in accordance with the Plans and
Specifications.
D.Payment in the Event of Termination. In the event this Contract is terminated by the
either party, the Contractor shall not be entitled to receive any further amounts due
under this Contract until the work specified in the Scope of Work is satisfactorily
completed, as scheduled, up to the date of termination. At such time, if the unpaid
balance of the amount to be paid under the Contract exceeds the expense incurred by
the City in finishing the work, and all damages sustained by the City or which may be
sustained by the City or which may be sustained by the reason of such refusal, neglect,
failure or discontinuance of Contractor performing the work, such excess shall be paid
by the City to the Contractor. If the City’s expense and damages exceed the unpaid
balance, Contractor and his surety shall be jointly and severally liable therefore to the
City and shall pay such difference to the City. Such expense and damages shall include
all reasonable legal expenses and costs incurred by the City to protect the rights and
interests of the City under the Contract.
8.Hold Harmless: Contractor shall indemnify, defend and hold harmless City, its elected
officials, officers, agents, employees and volunteers, from and against any and all claims,
losses or liability, or any portion of the same, including but not limited to reasonable
attorneys’ fees, legal expenses and litigation costs, arising from injury or death to persons,
including injuries, sickness, disease or death of Contractor’s own employees, agents and
volunteers, or damage to property caused by Contractor’s negligent act or omission,
except for those acts caused by or resulting from a negligent act or omission by City and
its officers, agents, employees and volunteers.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction, alteration, improvement, etc., of structure or improvement attached to real
estate…) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
contractor and City, its officers, officials, employees and volunteers, Contractor’s
14
liability shall be only to the extent of Contractor’s negligence. It is further specifically and
expressly understood that the indemnification provided in this Agreement constitute
Contractor’s waiver of immunity under the Industrial Insurance Act, RCW Title 51, solely
for the purposes of this indemnification. The Parties have mutually negotiated and agreed
to this waiver. The provisions of this section shall survive the expiration or
termination of this Agreement.
9. Insurance: Contractor shall secure and maintain:
A. Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B.Professional liability insurance, in the minimum amount of $1,000,000 for each
occurrence, shall also be secured for any professional services being provided to City
that are excluded in the commercial general liability insurance.
C.Workers’ compensation coverage, as required by the Industrial Insurance laws of the
State of Washington, shall also be secured.
D.It is agreed that on Contractor’s commercial general liability policy, the City will be
named as an Additional Insured on a non-contributory primary basis. City’s insurance
policies shall not be a source for payment of any Contractor liability.
E.Subject to City’s review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to City before executing the work of this
Agreement.
F.Contractor shall provide City with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
10.Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification, the Contractor agrees as follows:
A. Contractor, and Contractor’s agents, employees, representatives, and volunteers
with regard to the services performed or to be performed under this Agreement,
shall not discriminate on the basis of race, color, sex, religion, nationality, creed,
marital status, sexual orientation or preference, age (except minimum age and
retirement provisions), honorably discharged veteran or military status, or the
presence of any sensory, mental or physical handicap, unless based upon a bona fide
occupational qualification in relationship to hiring and employment, in employment
or application for employment, the administration of the delivery of services or any
other benefits under this Agreement, or procurement of materials or supplies.
15
B.The Contractor will take affirmative action to ensure that applicants are employed
and that employees are treated during employment without regard to their race,
creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental
handicaps, or marital status. Such action shall include, but not be limited to the
following employment, upgrading, demotion or transfer, recruitment or
recruitment advertising, layoff or termination, rates of pay or other forms of
compensation and selection for training.
C.If Contractor fails to comply with any of this Agreement’s non-discrimination
provisions, City shall have the right, at its option, to cancel the Agreement in whole or
in part.
D.Contractor is responsible to be aware of and in compliance with all federal, state and
local laws and regulations that may affect the satisfactory completion of the project,
which includes but is not limited to fair labor laws and worker's compensation.
11.Independent Contractor: Contractor’s employees, while engaged in the performance of any
of Contractor’s services under this Agreement, shall be considered employees of the
Contractor and not employees, agents, representatives of City and as a result, shall not be
entitled to any coverage or benefits from the City of City. Contractor’s relation to City shall
be at all times as an independent contractor. Any and all Workman’s Compensation Act
claims on behalf of Contractor employees, and any and all claims made by a third-party as a
consequence of any negligent act or omission on the part of Contractor’s employees, while
engaged in services provided to be rendered under this Agreement, shall be the solely
Contractor’s obligation and responsibility.
12.City of Renton Business License: Unless exempted by the Renton Municipal Code,
Contractor shall obtain a City of Renton Business License prior to performing any Work and
maintain the business license in good standing throughout the term of this agreement with
the City.
Information regarding acquiring a city business license can be found at:
https://www.rentonwa.gov/Tax
Information regarding State business licensing requirements can be found at:
https://dor.wa.gov/doing-business/register-my-business
13.Record Keeping and Reporting: Contractor shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Services provided in the
performance of this Agreement. The Contractor agrees to provide access to and copies of
any records related to this Agreement as required by the City to audit expenditures and
charges and/or to comply with the Washington State Public Records Act (Chapter 42.56
16
RCW).
14.Public Records Compliance. To the full extent the City determines necessary to comply with
the Washington State Public Records Act, Contractor shall make a due diligent search of all
records in its possession, including, but not limited to, e-mail, correspondence, notes, saved
telephone messages, recordings, photos, or drawings and provide them to the City for
production. In the event Contractor believes said records need to be protected from
disclosure, it shall, at Contractor’s own expense, seek judicial protection. Contractor shall
indemnify, defend, and hold harmless the City for all costs, including attorneys’ fees,
attendant to any claim or litigation related to a Public Records Act request for which
Contractor has responsive records and for which Contractor has withheld records or
information contained therein, or not provided them to the City in a timely manner.
Contractor shall produce for distribution any and all records responsive to the Public
Records Act request in a timely manner, unless those records are protected by court order.
15. Other Provisions:
A.Administration and Notices. Each individual executing this Agreement on behalf of
City and Contractor represents and warrants that such individuals are duly
authorized to execute and deliver this Agreement on behalf of City or Contractor.
Any notices required to be given by the Parties shall be delivered at the addresses
set forth below. Any notices may be delivered personally to the addressee of the
notice or may be deposited in the United States mail, postage prepaid, to the address
set forth below. Any notice so posted in the United States mail shall be deemed
received three (3) calendar days after the date of mailing. This Agreement shall be
administered by and any notices should be sent to the undersigned individuals or
their designees.
CITY OF RENTON
Ian Gray
1055 South Grady Way
Renton, WA 98057
Phone: (425) 430-6601
E-mail Address:
igray@rentonwa.gov
CONTRACTOR
Jeff Candler
PO Box 2668
Renton, WA 98056
Phone: (425)-271-8272
E-mail :
jeff@canberlandscaping.com
B.Amendment and Modification. This Agreement may be amended only by an
instrument in writing, duly executed by both Parties.
C.Assignment and Subcontract. Contractor shall not assign or subcontract any portion
of this Agreement without the City of Renton’s prior express written consent.
17
D.Compliance with Laws. Contractor and all of the Contractor’s employees shall perform
the services in accordance with all applicable federal, state, county and city laws,
codes and ordinances. A copy of this language must be made a part of any contractor
or subcontractor agreement.
E.Conflicts. In the event of any inconsistencies between contractor proposals and this
contract, the terms of this contract shall prevail.
F.Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington.
G.Joint Drafting Effort. This Agreement shall be considered for all purposes as
prepared by the joint efforts of the Parties and shall not be construed against one
party or the other as a result of the preparation, substitution, submission or other
event of negotiation, drafting or execution.
H.Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce
or interpret this Agreement or any of its terms or covenants shall be brought in the
King County Superior Court for the State of Washington at the Maleng Regional
Justice Center in Kent, King County, Washington, or its replacement or successor.
I.Severability. A court of competent jurisdiction’s determination that any provision or
part of this Agreement is illegal or unenforceable shall not cancel or invalidate the
remainder of this Agreement, which shall remain in full force and effect.
J.Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
K.Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement
will be for the sole and exclusive benefit of the Parties and no one else.
L.Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s
failure to enforce any provision of this Agreement shall not be a waiver and shall not
prevent either City or Contractor from enforcing that provision or any other provision
of this Agreement in the future. Waiver of breach of any provision of this Agreement
shall not be deemed to be a waiver of any prior or subsequent breach unless it is
expressly waived in writing.
18
(approved via email from Cheryl Beyer)
1/14/2022
Canber Corps.
PO Box 2668
Renton, WA 98056
425-271-8272
Sales tax
Site #Name Sub-total 10.10%Total
1 Park Ave N Frontage 2510.00 253.51 2763.51
2 North 3rd Street Frontage 4588.00 463.39 5051.39
3 Northeast Park Drive Frontage 2978.00 300.78 3278.78
4 Boeing Frontage 7318.00 739.12 8057.12
5 Houser Way Bypass Boulevard 1448.00 146.25 1594.25
6 Sunset Boulevards North Frontage 1568.00 158.37 1726.37
7 Factory Place North Triangle 468.00 47.27 515.27
8 South Cedar Avenue 2626.00 265.23 2891.23
9 I-405 Wall to Cedar River park 2478.00 250.28 2728.28
10 Cedar River Park Frontage 4016.00 405.62 4421.62
11 Maple Valley Highway Berm/Frontage 3610.00 364.61 3974.61
12 Northeast Sunset Blvd Triangle 1307.00 132.01 1439.01
13 Northeast Sunset Blvd Frontage 4890.00 493.89 5383.89
14 Harrington Ave Northeast Blvd 324.00 32.72 356.72
15 Northeast 2nd Street Frontage 1838.00 185.64 2023.64
16 Public Works Shops (Saturday only site)10762.00 1086.96 11848.96
17 Northeast 4th Street Frontage 3412.00 344.61 3756.61
18 Harrington Ave Northeast 8284.00 836.68 9120.68
19 Duvall Ave Northeast Frontage 9988.00 1008.79 10996.79
20 Coal Creed Parkway Frontage 2032.00 205.23 2237.23
21 Talbot Road Frontage 4968.00 501.77 5469.77
22 Lake Avenue Open Space 1362.00 137.56 1499.56
23 Talbot Hill Reservoir park 7464.00 753.86 8217.86
24 Shattuck Ave South Frontage 1916.00 193.52 2109.52
25 Rainier Avenue South 15770.00 1592.77 17362.77
26 Southwest Grady Way Frontage 6108.00 616.91 6724.91
27 Oakesdale Ave S.W./Black River Fontage 5102.00 515.30 5617.30
28 Southwest 27th Street Frontage 4946.00 499.55 5445.55
29 Springbrook Trail 10122.00 1022.32 11144.32
30 Springbrook Trail - Boeing-Longacres Segment 1200.00 121.20 1321.20
31 Edlund Farm Open Space 6500.00 656.50 7156.50
32 Cleveland Farm Open Space 3600.00 363.60 3963.60
33 Southeast 186th Place Open Space 1926.00 194.53 2120.53
34 Tiffany-Cascade Connector Frontage 2000.00 202.00 2202.00
35 Lake Washington Boulevard north Frontage 3038.00 306.84 3344.84
36 May Creek Trail 820.00 82.82 902.82
37 Seahawks Sign Frontage 545.00 55.05 600.05
38 Ripley Lane Trail and Frontage 1504.00 151.90 1655.90
39 New Sunset Park 4064.00 410.46 4474.46
40 Logan Avenue North Frontage 7780.00 785.78 8565.78
41 Duvall Boulevards 3000.00 303.00 3303.00
42 Heritage Park 7318.00 739.12 8057.12
43 Harrington Ave NE - South Unit Frontage 4937.00 498.64 5435.64
44 Sunset Lane and NE 10 Street Frontages 4612.00 465.81 5077.81
45 Sunset Park Phase 2 1584.00 159.98 1743.98
TOTAL 188,631.00$ 19,051.73$ 207,682.73$
City of Renton ~ cost per Task Summary per site ~ 2022 bid
20
Tree Wells Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding 176.00
Trunk or root sprouts
Herbicide pre-emerge 72.00 72.00 72.00
Herbicide post-emerg 60.00 60.00 60.00
Fertilize
Mulch 200.00
Leaf removal 88.00 176.00 352.00
Prune groundcover 66.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00 66.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 154.00 168.00 96.00 96.00 356.00 344.00 156.00 96.00 156.00 168.00 272.00 448.00
GRAND TOTAL $2,763.51
SITE: #1: Park Ave N Frontage
From N 1st St to N 6th St both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves & weeds. Private property
Keep debris from entering private property
2022 ~ COST PER TASK
TOTAL $2,510.00
SST $253.51
21
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Fertilize 120.00 120.00 120.00 120.00
Herbicide 48.00 48.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 48.00 48.00 48.00
Herbicide post-emerg 48.00 48.00
Fertilize
Mulch 200.00
Leaf removal 44.00 176.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 250.00 506.00 386.00 706.00 338.00 386.00 506.00 386.00 502.00 474.00 118.00
GRAND TOTAL $5,051.39
SITE: #2: North 3rd Street Frontage
From Burnett Ave North to Factory Ave North, both sides of street. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves& weeds.
Add wood chip mulch to tree rings. Keep debris from entereing private property. Protect homeowner flower plantings.
2022 ~ COST PER TASK
TOTAL $4,588.00
SST $463.39
22
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 176 176
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 45.00 45.00
Fertilize
Mulch 352.00
Leaf removal 264.00 132.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
Litter 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00 15.00
Monthly Costs 0.00 70.00 248.00 158.00 555.00 158.00 424.00 158.00 158.00 203.00 688.00 158.00
GRAND TOTAL $3,278.78
SITE: #3: Northeast park Drive Frontage
From Loagan Ave North to 400 feet east of I-405, North side of street only. Clean sidewalks & curblines. Remove litter, leaves & weeds. Mow turf North of sidewalk. Lightly prune shrubs and
groundcovers to keep within planting strips. Add wood chip mulch. Keep debris from entering streets.
2022 ~ COST PER TASK
TOTAL $2,978.00
SST $300.78
23
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 66.00 132.00 396.00 396.00 396.00 132.00 132.00 396.00 132.00 132.00
Trim/edge 66.00 66.00 132.00 132.00 132.00 66.00 66.00 132.00 66.00 66.00
Fertilize 150.00 150.00
Herbicide 150.00 150.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 132
Bed Weeding 44.00 88.00 44.00 88.00 44.00 88.00 44.00 88.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 454.00
Leaf removal 88.00 352.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 22.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 44.00
Litter 22.00 22.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00 44.00
Monthly Costs 132.00 176.00 420.00 1092.00 1262.00 924.00 420.00 434.00 748.00 674.00 772.00 264.00
GRAND TOTAL $8,057.12
SITE: #4: Boeing Frontage
Park Ave N from N 6th St to N 7th, only boulevards on north & south side of Boeing pedestrian bridge. From North 7th St to North 8th St, both sides of street
and boulevards. North 8th St, south side only, from Garden Ave North to Logan Ave N. Logan Ave N, east side only, from North 6th St to North 8th St.
Mow and edge planting strips, clean sidewalks and curblines, remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within
boulevards or to rejuvenate. Add fine bark mulch to shrub beds and tree rings. Keep debris from entering private property area.
2022 ~ COST PER TASK
TOTAL $7,318.00
SST $739.12
24
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 176
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 60.00 60.00
Herbicide post-emerg 60.00
Fertilize
Mulch 200.00 220.00
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 124.00 64.00 264.00 320.00 84.00 84.00 84.00 64.00 300.00 20.00
GRAND TOTAL $1,594.25
SITE: #5: Houser Way Bypass Boulevard
Shrub bed North of 430 Sunset Blvd NE (on Sunset), at end of K-405 exti ramp. Clean curlines. Remove litter, leaves & weeds. Ligthly prune shrubs
& groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entereing surrounding street areas
2022 ~ COST PER TASK
TOTAL $1,448.00
SST $146.25
25
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Herbicide pre-emerge 60.00 60.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 392.00
Leaf removal 88.00 88.00
Prune Groundcover 88.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 31.00 53.00 113.00 53.00 505.00 73.00 73.00 133.00 73.00 53.00 289.00 119.00
GRAND TOTAL $1,726.37
SITE: #6: Sunset Boulevards North Frontage
East side of Sunset Blvcd N from Bronson Way N (SR169) to NE 3rd St, including beneath S side of I-405 overpass. Clean sidewalks &
curblines. Remove Litter, leaves & weeds. Lightly prune groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris
from entering surrounding street areas
2022 ~ COST PER TASK
TOTAL $1,568.00
SST $158.37
26
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 22.00 44.00 44.00 44.00 44.00 44.00
Trim/edge 22.00 22.00 22.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 0.00 0.00 64.00 64.00 64.00 86.00 20.00 64.00 86.00 20.00 0.00 0.00
GRAND TOTAL $515.27
SITE: #7: Factory Place North Triangle
Vacant lot E of 1526 N 3rd St. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves & weeds. Keep debris from entering private property
2022 ~ COST PER TASK
TOTAL $468.00
SST $47.27
27
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 88.00 88.00 88.00 88.00 88.00
Herbicide pre-emerge 150.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 1000.00
Leaf removal 88.00 88.00
Prune Groundcover 176.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Litter 20.00 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 280.00 114.00 1130.00 150.00 62.00 134.00 150.00 42.00 394.00 130.00
GRAND TOTAL $2,891.23
SITE: #8: South Cedar Avenue
Between S 4th St and Houser Way S, including beneath the S side of I-405 overpass. Including seating area, all shrub beds, and stairway. Clean
staircase, curblines, and parking lots. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within plating bed or to rejuvenate.
Add wood chip mulch. Keep debris from entereing surrounding street
2022 ~ COST PER TASK
TOTAL $2,626.00
SST $265.23
28
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 120.00 120.00 120.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 1118.00
Leaf removal 88.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 64.00 184.00 64.00 1254.00 64.00 184.00 64.00 136.00 64.00 272.00 108.00
GRAND TOTAL $2,728.28
SITE: #9: I-405 Wall to Cedar River Park
From Houser Way underpass to Maple Valley Hwy (SR169 off ramp). Clean sidewalks and curblines. Remove litter, leaves & weeds. Lightly prune shrubs
& groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding park areas.
2022 ~ COST PER TASK
TOTAL $2,478.00
SST $250.28
29
Irrigation System Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Start-up 150.00
Winterize 150.00
Monitor/Adjust 60.00 60.00 60.00 60.00 60.00 60.00
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 22.00 44.00 44.00 44.00 88.00 44.00 44.00 88.00 44.00 22.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide 90.00 90.00
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 166.00
Leaf removal 176.00 176.00
Prune Groundcover 176.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 52.00 162.00 274.00 274.00 650.00 288.00 334.00 244.00 468.00 394.00 428.00 448.00
GRAND TOTAL $4,421.62
SITE: #10: Cedar River Park Frontage
South side of SR169 from I-405 to park's E property line, including the center boulevard and 190' South along park entrance both sides of road.
rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park areas.
Operate and maintain irrigation system.
Mow & edge turf. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to
2022 ~ COST PER TASK
TOTAL $4,016.00
SST $405.62
30
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 396.00 396.00 396.00 396.00 396.00 396.00 396.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 148.00
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 110.00 416.00 416.00 506.00 654.00 20.00 20.00 506.00 416.00 506.00 20.00
GRAND TOTAL $3,974.61
SITE: #11: Maple Valley Highway Berm/Frontage
N side of SR 169 from 140th Pl SE to 149th Ave SE. Mow turf. Clean pathway. Remove litter, leaves & weeds. Add wood chip mulch to tree
rings. Keep debris from entering street, pathway and parking areas.
2022 ~ COST PER TASK
TOTAL $3,610.00
SST $364.61
31
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 88.00 88.00 88.00 44.00 44.00 88.00 88.00 44.00
Trim/edge 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 84.00
Leaf removal 88.00 44.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 15.00 15.00 15.00 15.00 30.00 30.00 30.00 30.00 30.00 15.00 15.00 15.00
Monthly Costs 15.00 15.00 103.00 103.00 246.00 118.00 118.00 74.00 162.00 103.00 191.00 59.00
GRAND TOTAL $1,439.01
SITE: #12: Northeast Sunset Boulevard Triangle
Sunset Blvd NE & NE Park Dr, N of 1170 Sunset Blvd NE. Mowe & edge turf. Clean sidewalks and curblines. Remove litter, leaves & weeds.
Add wood chip mulch to tree rings. Keep debris from entering surrounding streets and private property
2022 ~ COST PER TASK
TOTAL $1,307.00
SST $132.01
32
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 176.00 176.00 352.00 352.00 352.00 176.00 176.00 176.00 176.00 176.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize 90.00
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 54.00 54.00
Herbicide post-emerg 42.00 42.00
Fertilize
Mulch
Leaf removal 220.00 440.00 440.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 40.00 40.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 284.00 428.00 460.00 522.00 480.00 304.00 304.00 346.00 504.00 778.00 460.00
GRAND TOTAL $5,383.89
SITE: #13: Northeast Sunset Boulevard Frontage
Edmonds Ave NE to 2502 NE Sunset Blvd, first driveway on N side of Sunset; sidewalks only, both sides of street. From 2502 NE sunset Blvd to
Harrington Ave NE; sidewalks both sides of street and turf areas (North side of street, North of sidwalk to fence). From Harrington Ave NE to NE 12th
St, South side only up to but including Walreens, sidewalk & palnting strips. Mow & edge turf. Clean sidwalks and curblines. Remove litter,
leaves & weeds. Keep debris from entering streets and private property areas.
2022 ~ COST PER TASK
TOTAL $4,890.00
SST $493.89
33
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 44.00 44.00 44.00 44.00 44.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 10.00 10.00 10.00 10.00
Monthly Costs 0.00 0.00 54.00 54.00 54.00 54.00 0.00 0.00 54.00 54.00 0.00 0.00
GRAND TOTAL $356.72
SITE: #14: Harrington Ave Northeast Boulevard
Harrington Ave NE and NE 5th St (North of 2721 Harrington Ave NE). Mow turf. Remove litter, leaves and weeds. Keep debris
from entering surrounding streets and private proerpty areas.
2022 ~ COST PER TASK
TOTAL $324.00
SST $32.72
34
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 150.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 800.00
Leaf removal 154.00 154.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 214.00 20.00 924.00 20.00 64.00 80.00 64.00 20.00 218.00 174.00
GRAND TOTAL $2,023.64
SITE: #15: Northeast 2nd Street Frontage
North side of NE 2nd St fro mMonroe Ave NE to Public Works gate @ 3555 NE 2nd St. Clean curlines. Remove litter, leaves & weeds.
Lightly prune shtrubs to keep within palnting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering street.
2022 ~ COST PER TASK
TOTAL $1,838.00
SST $185.64
35
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 352.00 528.00 704.00 704.00 704.00 704.00 528.00 704.00 704.00 352.00
Trim/edge 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 120.00 120.00 120.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 1650.00
Leaf removal 132.00 264.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 492.00 854.00 910.00 2620.00 910.00 1030.00 734.00 970.00 1042.00 876.00 294.00
GRAND TOTAL $11,848.96
SITE: #16: Public Works Shops (Saturday ONLY site)
3555 NE 2nd St. Mow turf and edge. Clean employee parking lots, sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs &
goundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine bark mulch to tree wells and shrub beds.
2022 ~ COST PER TASK
TOTAL $10,762.00
SST $1,086.96
36
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 55.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 55.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize 120.00 120.00 120.00
Herbicide 90.00 90.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 114.00
Leaf removal 352.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 74.00 173.00 348.00 318.00 342.00 228.00 348.00 228.00 318.00 348.00 525.00 162.00
2022 ~ COST PER TASK
TOTAL $3,412.00
SST $344.61
GRAND TOTAL $3,756.61
SITE: #17: Northeast 4th Street Frontage
North side of street from Union Ave NE to 4350 NE 4th St and; South side of street from 4301 to 4405 NE 4th St. Mow & edge turf.
Remove sidewalks U curblines. Remove litter, leaves & weeds. Add fine pine bark mulch to tree wells. Keep debris from entering surrounding street
and private property areas.
37
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 110.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00 110.00
Trim/edge 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00
Fertilize 90.00 90.00 90.00
Herbicide 66.00 66.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 396.00
Bed Weeding 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 296.00
Leaf removal 396.00 396.00 396.00
Prune Groundcover 220.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 20.00 10.00
Monthly Costs 0.00 790.00 702.00 678.00 908.00 832.00 702.00 612.00 678.00 1098.00 878.00 406.00
2022 ~ COST PER TASK
TOTAL $8,284.00
SST $836.68
GRAND TOTAL $9,120.68
SITE: #18: Harrington Ave Northeast
West side of street from NE 16th St, South to NE 12th St. East side of street, from NE 16th St to NE 10th St. Mow & edge turf. Clean
sidewalks & curblines. Remove litter, leaves & weeds. Lightly prune shrubs and groundcovers in swales to keep withing beds or to rejuvenate. Add wood chip mulch
to tree rings & to swale shrub beds. Keep debris from entering surrounding streets and private property areas.
38
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 528
Bed Weeding 264.00 264.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 264.00 264.00
Herbicide pre-emerge 110.00 110.00
Herbicide post-emerg 120.00 120.00
Fertilize
Mulch 1952.00
Leaf removal 264.00 528.00 528.00
Prune Groundcover 88.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 294.00 294.00 668.00 558.00 3158.00 558.00 668.00 558.00 678.00 822.00 822.00 910.00
2022 ~ COST PER TASK
TOTAL $9,988.00
SST $1,008.79
GRAND TOTAL $10,996.79
SITE: #19: Duvall Ave Northeast Frontage
West side of street from 1827 Duvall Ave NE to 4626 NE 24th St, then from 2501 duvall Ave NE at wall to Renton city limits. East side of street from 1702
Duvall Ave NE to 2322 Duvall Ave NE, then from driveway at 4702 NE 25th St to SE 95th Way intersection. Clean sidewalks & curbline. Remove litter, leaves & weeds. Lightly
prune shrubs & groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate.
Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streetrs or private property areas.
39
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 132.00 132.00
Bed Weeding 44.00 44.00 44.00 44.00 88.00 88.00 88.00 88.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 60.00 60.00 60.00
Herbicide post-emerg 60.00 60.00
Fertilize
Mulch 380.00
Leaf removal 88.00 88.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Monthly Costs 54.00 54.00 246.00 54.00 538.00 230.00 158.00 98.00 114.00 142.00 202.00 142.00
2022 ~ COST PER TASK
TOTAL $2,032.00
SST $205.23
GRAND TOTAL $2,237.23
SITE: #20: Coal Creek Parkway Frontage
East side of street from NE 95th Way to SE May Valley Rd. Clean sidewalks and curblines. Remove litter, leaves & weeds.
Light prune trees and schrubs to keep within beds. Add wood chip mulch to tree and shrub beds
40
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Fertilize 90.00 90.00 90.00
Herbicide 120.00 120.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 75.00 75.00 75.00
Herbicide post-emerg
Fertilize
Mulch 177.00
Leaf removal 176.00 352.00 352.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 206.00 503.00 458.00 590.00 338.00 428.00 338.00 533.00 604.00 558.00 382.00
2022 ~ COST PER TASK
TOTAL $4,968.00
SST $501.77
GRAND TOTAL $5,469.77
SITE: #21: Talbot Road Frontage
South of I-405 overpass to Sought Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves & weeds. Add fine pine bark mulch
to tree rings. Keep debris from entering surrounding private property.
41
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 66.00 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 86.00 86.00 152.00 152.00 152.00 152.00 152.00 152.00 152.00 86.00 20.00
2022 ~ COST PER TASK
TOTAL $1,362.00
SST $137.56
GRAND TOTAL $1,499.56
SITE: #22: Lake Avenue Open Space
Vacant lot at 1511 Lake Ave S. Mow turf. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding
private property
42
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 176.00 352.00 704.00 704.00 704.00 352.00 352.00 352.00 352.00 176.00
Trim/edge 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 132
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 66.00 66.00
Herbicide post-emerg
Fertilize
Mulch 592.00
Leaf removal 352.00 352.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 338.00 580.00 866.00 1458.00 866.00 646.00 514.00 580.00 514.00 690.00 382.00
2022 ~ COST PER TASK
TOTAL $7,464.00
SST $753.86
GRAND TOTAL $8,217.86
SITE: #23: Talbot Hill Reservoir Park
1900 Tablot Road South. Mow & edge turf, including along streets. Clean parking lot. Remove litter, leaves & weeds. Empty trash cans and reaplce with new
liners. Lightly prune gourndcover and shrubs to keep within beds, clearance along walls, or to rejuvenate. Add wood chip mulch to tree rings & shrub beds.
43
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 88.00
Bed Weeding 55.00 55.00 110.00 110.00 110.00 110.00 55.00 55.00 55.00 55.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 120.00
Fertilize
Mulch 296.00
Leaf removal 88.00 44.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 75.00 165.00 130.00 426.00 220.00 250.00 75.00 75.00 75.00 341.00 64.00
2022 ~ COST PER TASK
TOTAL $1,916.00
SST $193.52
GRAND TOTAL $2,109.52
SITE: #24: Shattuck Ave South Frontage
Between Houser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves & weeds. Lightly prune shrubs &
groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris from entering surrounding streets & private property areas.
44
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 286.00 286.00 286.00 286.00
Bed Weeding 132.00 132.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 528.00 132.00 132.00
Herbicide pre-emerge 255.00 255.00
Herbicide post-emerg 168.00 168.00 168.00
Fertilize
Mulch 1564.00
Leaf removal
Prune Groundcover 132.00 132.00 132.00 132.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00 264.00
Litter 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00 300.00
255
Monthly Costs 696.00 951.00 1510.00 1092.00 3242.00 1347.00 1510.00 1260.00 1092.00 1678.00 696.00 696.00
2022 ~ COST PER TASK
TOTAL $15,770.00
SST $1,592.77
GRAND TOTAL $17,362.77
SITE: #25: Rainier Avenue South
Between South Grady Way and 250 Rainier Ave S, both sides of street and boulevards. Clean sidewalks & curblines. Remove litter, leaves & weeds. Lightly
prune shrubs and groundcovers to keep within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fin
pine bark mulch to planting strips. Keep debris from entering surrounding private property.
45
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 352.00 352.00 352.00 176.00 176.00 176.00 176.00 176.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide 72.00 72.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 150.00 150.00 150.00
Herbicide post-emerg 66.00 66.00 66.00
Fertilize
Mulch 1160.00
Leaf removal 88.00 352.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 40.00 40.00 80.00 80.00 40.00 40.00 40.00 20.00 20.00 20.00
Monthly Costs 20.00 196.00 454.00 552.00 1746.00 520.00 454.00 370.00 376.00 438.00 786.00 196.00
2022 ~ COST PER TASK
TOTAL $6,108.00
SST $616.91
GRAND TOTAL $6,724.91
SITE: #26: southwest Grady Way Frontage
North side of SW Grady Way from Oaksdale Ave SW to Longacres Ave SW at King County metro driveway, 1520 SW Grady Way. Mow & edge turf.
Clean sidwalks & curlines. Remove litter, leaves & weeds between street and fence, including gateway sign area. Lighly prune shrubs & groundcovers to keep within beds to
rejuveante, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keed debris from
46
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 352.00 352.00 352.00 176.00 176.00 352.00 176.00 88.00
Trim/edge 44.00 44.00 88.00 88.00 88.00 44.00 44.00 88.00 44.00 44.00
Fertilize
Herbicide 105.00 105.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 308
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal 264.00 528.00 528.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 162.00 250.00 575.00 470.00 778.00 250.00 250.00 575.00 514.00 690.00 558.00
2022 ~ COST PER TASK
TOTAL $5,102.00
SST $515.30
GRAND TOTAL $5,617.30
SITE: #27: Oakesdale Ave S.W. / Black River Frontage
Between 602 Oaksdale Ave SW and 1,060 feet N to end of sidewalk on Monster Road SW, N side of street, including the center Blvd
Mow turf & edge. Clean parking lot, sidewalks (including bridge) & curblines. Remove litter, leaves & weeds. Empty trach containers and replace liners.
keep debris from entering street.
47
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 110.00 220.00 440.00 440.00 440.00 220.00 220.00 220.00 220.00 110.00
Trim/edge 88.00 88.00 176.00 176.00
Fertilize
Herbicide 105.00 105.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge 90.00 90.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 192.00
Leaf removal 176.00 176.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 20.00 40.00 40.00 40.00 20.00 20.00 20.00 20.00 10.00 10.00
Monthly Costs 10.00 252.00 462.00 805.00 964.00 524.00 284.00 284.00 461.00 284.00 430.00 186.00
2022 ~ COST PER TASK
TOTAL $4,946.00
SST $499.55
GRAND TOTAL $5,445.55
SITE: #28: Southwest 27th Street Frontage
From Oakesdale Ave SW to Naches Ave SW, both sides of street, including center blvd. Mow & edge turf. Clean bike path, sidewalks &
curblines. Remove litter, leaves & weeds. Add wood chip mulch to tree rings. Keep debris from entering surrounding streets & private property areas.
48
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00
Trim/edge 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00 110.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Blackberry 55.00 55.00
Prune Tree Branches 44.00 44.00
Herbicide pre-emerge
Herbicide post-emerg 120.00
Moss Removal 220.00
Mulch
Leaf removal 572.00 1144.00 286.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Pressure wash boardwalk 3000.00
Litter 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Monthly Costs 50.00 50.00 732.00 512.00 731.00 3512.00 512.00 512.00 512.00 1183.00 1480.00 336.00
2022 ~ COST PER TASK
TOTAL $10,122.00
SST $1,022.32
GRAND TOTAL $11,144.32
SITE: #29: Springbrook Trail
Segment 1: From Black River riparian Forest trailhead along Oakesdale Ave SW to SW 16th St. Mow turf. Clean trail, sidewalks & curblines.
Rove litter, leaves, moss & weeds. Lightly prune trees/shrubs to keep out of trail shoulders. Empty trash containers & replace liners. Segment 2: At 800
SW 27th St Beginning, 1,055 feet north of SW 27th St to SW 43rd St. Mow turf. Clean trail, sidewalks & curblines. Remove litter, moss
and weeds. Lightly prune shrubs to keep out of trail shoulders. Empty trash containers and replace liners.
49
Hards Services Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Clean pathway & signs 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
Monthly Costs 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
2022 ~ COST PER TASK
TOTAL $1,200.00
SST $121.20
GRAND TOTAL $1,321.20
SITE: #30: Springbrook Trail - Boeing-Longacres Segment
(from SW 16th Street to the N property line and parking lot @ 1905 Raymond Ave SW, a total distance of approx 1,460 feet. Clean trail, remove litter, control
moss and clean 2 interpretative signs)
50
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1500.00 1500.00 1500.00 1500.00
Trim/edge 75.00 75.00 75.00 75.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 50.00 50.00 50.00 50.00
Monthly Costs 0.00 0.00 1625.00 0.00 1625.00 0.00 1625.00 0.00 0.00 1625.00 0.00 0.00
2022 ~ COST PER TASK
TOTAL $6,500.00
SST $656.50
GRAND TOTAL $7,156.50
SITE: #31: Edlund Farm Open Space
51
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1200.00 1200.00 1200.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter
Monthly Costs 0.00 0.00 0.00 0.00 1200.00 0.00 1200.00 0.00 0.00 1200.00 0.00 0.00
2022 ~ COST PER TASK
TOTAL $3,600.00
SST $363.60
GRAND TOTAL $3,963.60
SITE: #32: Cleveland Farm Open Space
19415 Talbot Rd S. Mow fields. Remove litter. Control blackberry shrubs at SW entrance. Exclude areas around house maintainted by residents.
Scheudle field mowing during periods of dry soil conditions
52
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 539.00 539.00 539.00
Trim/edge 88.00 88.00 88.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 15.00 15.00 15.00
Monthly Costs 0.00 0.00 0.00 0.00 642.00 0.00 642.00 0.00 642.00 0.00 0.00 0.00
2022 ~ COST PER TASK
TOTAL $1,926.00
SST $194.53
GRAND TOTAL $2,120.53
SITE: #33: 11017 Southeasst 186th Place Open Space
Vacant lot. Mow field. Clean sidewalk and curbline. Control blackberry
53
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 220.00 220.00 220.00 220.00 220.00 220.00 220.00 220.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 20.00 20.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 240.00 20.00 20.00
2022 ~ COST PER TASK
TOTAL $2,000.00
SST $202.00
GRAND TOTAL $2,202.00
SITE: #34: Tiffany-Cascade Connector Frontage
East of 12130 SE 160th st. Mow grass North of sidewalk/street & two passes on trail from SE 160th St to pipeline. Clean sidewalks & curblines.
Remove litter. Keep debris from entering surrounding streets.
54
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
Herbicide pre-emerge 72.00
Herbicide post-emerg 72.00 72.00
Fertilize
Mulch 64.00
Leaf removal 88.00 88.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 162.00 344.00 272.00 408.00 272.00 272.00 272.00 344.00 360.00 272.00 30.00
2022 ~ COST PER TASK
TOTAL $3,038.00
SST $306.84
GRAND TOTAL $3,344.84
SITE: #35: lake Washingtopn Boulevard North Frontage
4350 Lake Washington Boulevard nroth. Mow & edge turf. Clean sidewalks, & curblines, including East side of bridge. Remove litter, leaves & weeds. Add wood
chip mulch to tree rings. Empty trash container and replace liner. Keep debris from entering street
55
Knotweek Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Herbicide-post emerge 300.00
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 100.00 100.00 100.00 100.00
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00
Monthly Costs 0.00 0.00 130.00 0.00 130.00 0.00 130.00 300.00 130.00 0.00 0.00 0.00
2022 ~ COST PER TASK
TOTAL $820.00
SST $82.82
GRAND TOTAL $902.82
SITE: #36: May Creek Trail
4350 Lake Washington boulevard North. Contraol invasive palnts including blackberry, knotweek, & horsetail in natural area. Clean are of litter.
56
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 125.00
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 10.00 10.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 10.00 10.00
Monthly Costs 10.00 54.00 20.00 64.00 145.00 64.00 20.00 64.00 20.00 64.00 10.00 10.00
2022 ~ COST PER TASK
TOTAL $545.00
SST $55.05
GRAND TOTAL $600.05
SITE: #37: Seahawks Sign Frontage
Southwest corner of Seahawk Way and Lake Washington Blvd. North. Clean sidewalks & curblines. Lightly prune shrubs & groundcover to keep
within beds, maintain sign visibiltiy of to rejuvenate. Remove litter, leaves & weeds. Add fine pine bark mulch
57
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 44.00
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 88.00 88.00 88.00 88.00
Bed Weeding
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch
Leaf removal
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 30.00 74.00 118.00 206.00 118.00 206.00 118.00 206.00 118.00 206.00 74.00 30.00
2022 ~ COST PER TASK
TOTAL $1,504.00
SST $151.90
GRAND TOTAL $1,655.90
SITE: #38: Ripley Lane Trail and Frontage
East of 5031 ripley Lane North at trailhead, then 872 feet north to RentonCity limits. Mow & edge turf, including street frontage. Clean pathway & street of litter
stones/debri, leaves & weeds. Prune vegetation away from fence or to keep trail open to both sides. Empty trash can and reaplce with new liner
58
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 88.00 88.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 88.00 88.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 900.00
Leaf removal 132.00 528.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
Monthly Costs 128.00 128.00 216.00 216.00 1116.00 216.00 216.00 216.00 216.00 348.00 656.00 392.00
2022 ~ COST PER TASK
TOTAL $4,064.00
SST $410.46
GRAND TOTAL $4,474.46
SITE: #39: New Sunset Park
(2715 Black NE 10th St: Two open fields between Sunset Lane NE and NE10th St; weed two detention ponds
Clean sidewalks, and curlines. Mow truf and edge. Remove litter, leaves and weeds. Add wood chip mulch to detention pond.)
59
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 176.00 176.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 352.00 176.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00 90.00
Fertilize
Mulch 1600.00
Leaf removal 88.00 264.00 352.00
Prune Groundcover 88.00 88.00 88.00 88.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Litter 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00
Monthly Costs 250.00 340.00 514.00 516.00 2114.00 516.00 604.00 426.00 514.00 604.00 780.00 602.00
2022 ~ COST PER TASK
TOTAL $7,780.00
SST $785.78
GRAND TOTAL $8,565.78
SITE: #40: Logan Avenue North Frontage
of Logan Ave North, including boulevards, and East side of sidewalks, from the Cedar River, North to North 6th St. Boulevards, sidewalks,
curblines shrub bed
60
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 132
Bed Weeding 66.00 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00 66.00
Herbicide pre-emerge 96.00 96.00 96.00
Herbicide post-emerg 96.00 96.00
Fertilize
Mulch 596.00
Leaf removal 44.00 88.00 88.00
Prune Groundcover 132.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Litter 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
Monthly Costs 76.00 76.00 238.00 142.00 966.00 142.00 238.00 142.00 238.00 186.00 260.00 296.00
2022 ~ COST PER TASK
TOTAL $3,000.00
SST $303.00
GRAND TOTAL $3,303.00
SITE: #41: Duvall Boulevards
between NE 4th St and NE 8th St
61
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00 176.00
Herbicide pre-emerge 360.00 360.00
Herbicide post-emerg 120.00 120.00 120.00 120.00
Fertilize
Mulch 2600.00
Leaf removal 132.00 264.00 264.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 22.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 218.00 360.00 600.00 360.00 2840.00 240.00 360.00 600.00 240.00 492.00 504.00 504.00
2022 ~ COST PER TASK
TOTAL $7,318.00
SST $739.12
GRAND TOTAL $8,057.12
SITE: #42: Heritage Park
62
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 44.00
Trim/edge 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Fertilize 90.00 90.00 90.00
Herbicide 75.00 75.00
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 198.00
Bed Weeding 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Herbicide pre-emerge 90.00 90.00 90.00
Herbicide post-emerg 90.00 90.00
Fertilize
Mulch 475.00
Leaf removal 220.00 220.00 220.00
Prune Groundcover 66.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 30.00 30.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 60.00 30.00 30.00
Monthly Costs 30.00 450.00 460.00 355.00 755.00 436.00 460.00 280.00 355.00 680.00 426.00 250.00
2022 ~ COST PER TASK
TOTAL $4,937.00
SST $498.64
GRAND TOTAL $5,435.64
SITE: #43: Harrington Ave NE - South Unit Frontage
(East side of street from NE 8th place, soudht to NE 7th street. Mow and edge turf. Clean sidwalks and curblines. Remove litter, leaves & weeds. Lightly prune
shrubs and groundcovers in swals to keep within beds or to rejuvenate. Add wood chipmulch to tree rings and to swals shrub beds. Keep debris from entering
surrounding streets and private property areas.)
63
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 66.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 132.00 66.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 1600.00
Leaf removal 44.00 88.00 88.00
Prune Groundcover 44.00 44.00 44.00
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 44.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00 88.00
Litter 20.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00 40.00
Monthly Costs 64.00 194.00 260.00 304.00 1860.00 260.00 304.00 260.00 260.00 348.00 282.00 216.00
containing shrubs, grouncovers, perennials and mulch. Remove litter, leaves & weeds. Add wood chip mulch.) Addendum 6 to CAG-16-078.
2022 ~ COST PER TASK
TOTAL $4,612.00
SST $465.81
GRAND TOTAL $5,077.81
SITE: 44: Sunset Lane and NE 10 Street Frontages
(2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Blvd and NE 10 Ave moving counterclockwise: newly created planting strips between
sidewalks and curbs along the North side of NE 10 St from NE Sunset Blvd to Glenwood Ave NE; also both sides of street adjacent to the Renton Highlands Library
on NE 10 Ave; alongthe Southerly and Westerly side of sunset Lane NE from Glenwood ave NE to NE 10th Ave at the library; along
Harrington Ave Ne between NE Sunset Blvd and Sunset Lane NE on both sides of the street; along both sides of the street on glenwood
Ave NE and along both sides of Harrington Ave NE North of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street sidewalks, curblines and shrub beds
64
TURF Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
TREES/SHRUBS Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00 44.00
Herbicide pre-emerge
Herbicide post-emerg
Fertilize
Mulch 200.00
Leaf removal 88.00 176.00 352.00
Prune Groundcover
Ground Cover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
Monthly Costs 64.00 64.00 64.00 64.00 264.00 64.00 64.00 64.00 64.00 152.00 240.00 416.00
2022 ~ COST PER TASK
TOTAL $1,584.00
SST $159.98
GRAND TOTAL $1,743.98
SITE: #45: Sunset Park Phase 2
(2715 block NE 10th St: new park arSouth of new Sunset Park between Sunset Lane NE & NE 10th St; weed rain gardens and beds.
Clean sidwalks, and curblines. Mow turf and edge. Remove litter, leaves & weeds. Add wood chip mulch to rain gardens and beds)
65
SCOPE OF WORK for GROUNDSKEEPING SERVICES
The number in the maintenance schedule is a minimum; HOWEVER, some areas may need to be done more frequently
to assure that the task is maintained to City’s standards.
Work will be performed in accordance with Section 11, Frequency Schedules for all sites (45 locations). The Frequency
Schedules section and Section 2 provide a brief description of the site specifics and work to be performed.
A.Service Locations by Category
Rights-of Way (see Section 2 for a full description of each site)
Site 1 - Park Ave. North FrontageSite 2 - North 3rd Street FrontageSite 3 - Northeast Park Drive FrontageSite 4 - Boeing FrontageSite 5 - Houser Way BypassSite 6 - Sunset Boulevard North FrontageSite 7 - Factory Place FrontageSite 8 - South Cedar AvenueSite 9 - I-405 Wall at Cedar River ParkSite 10 - Cedar River Park FrontageSite 11 - Maple Valley Highway Berm FrontageSite 12 - Northeast Sunset Boulevard TriangleSite 13 - N.E. Sunset Boulevard FrontageSite 14 - Harrington Avevenue Northeast BoulevardSite 15 - Northeast 2nd Street FrontageSite 17 - Northeast 4th Street FrontageSite 18 - Harrington Avenue Northeast FrontageSite 19 - Duvall Avenue Northeast FrontageSite 20 - Coal Creek Parkway FrontageSite 21 - Talbot Road FrontageSite 24 - Shattuck Avenue South FrontageSite 25 - Rainier Avenue South FrontageSite 26 - Southwest Grady Way FrontageSite 27 - Oakesdale Avenue Southwest/Black River FrontageSite 28 - Southwest 27th Street FrontageSite 35 - Lake Washington Boulevard North FrontageSite 37 - Seahawks SignSite 40 - Logan Avenue North FrontageSite 41 - Duvall BoulevardsSite 43 - Harrington Ave NE - South Unit FrontageSite 44 - Sunset Lane and NE 10 Street Frontages
Parks
Site 23 - Talbot Hill Reservoir Park
Site 39 - New Sunset Park Phase 1
Site 42 - Heritage Park
Site 45 - Sunset Park Phase 2
66
Trails
Site 29 - Springbrook Trail
Site 30 - Springbrook Longacres
Site 38 - Ripley Lane Trail
City Facilities
Site 16 - Public Works Shops
Open Space Areas
Site 22 - Lake Ave. Open Space
Site 31 - Edlund Farm Open Space
Site 32 - Cleveland Farm Open Space
Site 33 - 11017 SE 186th Place Open Space
Site 34 - Tiffany-Cascade Connector Open Space
Site 36 - May Creek Trail Open Space
The Contractor, at its sole cost and expense, shall supply all labor, tools, specialized equipment, material,
supplies, supervision and transportation to perform the services.
B.Pesticide Certification
State of Washington, Department of Agriculture, Pesticide Certification License. Provide a copy of each
individual license for company staff who will apply pesticides (upon award of contract).
C.Time Performance
The Contractor shall follow a weekly work schedule as set forth in an annual maintenance schedule,
(Section 11, Attachment A, Sites 1 thru 45). Work shall, to the extent possible, be performed on the same day
each week. In no case shall work be performed more than 24 hours after the regularly scheduled day without
notification and consent of the Project Manager. The Contractor shall provide a daily location of work schedule
prior to beginning work and updated as the schedule may change.
D.Invoice
The Contractor will submit a detailed monthly invoice, together with maintenance and chemical log. All
invoices shall describe the task completed (e.g. mowing) and the corresponding amount for that task. All
invoices submitted in less detailed forms will be returned for correction. Payments may be delayed until the
invoice has been submitted in the proper form. No interest on the payment will be due by the City for invoices
not in the proper form.
E.General Turf Maintenance
1.Mowing: Generally, grass shall be mowed once a week during the mowing seasons from March -
October and once every other week in February and November. Mowing height shall leave grass
67
blades that stand about 1.5 inches above soil grade for park-like locations and streets and 3 to 5
inches for field mowing locations. Sweeping, blowing and cleaning debris from mowing operations
are included in this description. See Frequency Schedules for deviations.
2.Trim/edge: All hard surfaces and tree well edges will be edged every other week during the mowing
season and the surface either swept or blown clean. Method of edging will be mechanical edger for
all hard edge surfaces and monofiliment line for all soft edges. All debris shall be swept clean and
removed, not left in streets or on adjacent property. See Frequency Schedules for deviations.
3.Aerate/overseed: Aerate and overseed once per year with a three way mix (Kentucky Blue,
Creeping Fescue, Rye). The Contractor will submit a list of recommended seed to the Project
Manager before applications. This activity should be included as part of number 1. Mowing above.
See Frequency Schedules for deviations.
4.Fertilize: All turf will be fertilized two times a year (see Maintenance Schedule) with a minimum
28-7-14 fertilizer, or an approved equal. See Frequency Schedules for deviations.
5.Herbicide: All turf will receive no more than two applications per year. See Frequency Schedules
for deviations.
The Contractor will provide twenty-four (24) hours advance notice to the Project Manager before
making any applications. Authorization to proceed will be given by the Project Manager once the site
has been inspected. The Contractor should also inspect the lawn areas on a regular basis for insect
or pest problems. If, in the opinion of the Contractor, additional treatments are necessary, the
Contractor shall notify the Project Manager. After each application the Contractor will turn in a
“Pesticide Application Record” form (Section 11-E) to the Project Manager. The “Pesticide
Application Record” form will be submitted with the monthly invoice. The Contractor will provide
posting in conformance to State of Washington Department of Agriculture regulations after
application of chemicals. Signs will be removed twenty-four hours following application. The
Contractor will submit a list of recommended chemicals for approval by the Project Manager before
each application.
6.Litter: Empty trash containers at each site visit; replacing plastic bags. Pick up loose litter in all
areas upon each site visit.
F. Shrub Maintenance
1.Pruning: Ornamental shrubs shall not be pruned except:
1.) to remove singular broken branches,
2.) to perform clearance pruning,
3.) to provide a clear line of sight, or
4.) to rejuvenate individual shrubs.
Singular branches which are over-hanging onto and are impediments to pedestrian or vehicular
traffic may be pruned back. Boxing or rounding-over shrubs into a formal shape or hedge should not
occur without prior approval from the Project Manager. Any damage to plant material due to
Contractor negligence shall be the responsibility of the Contractor to replace.
Shrubs shall be hand pruned to maintain the integrity of the plant and its location in the landscape.
Gas powered hedge trimmers shall not be used to prune shrubs. The Contractor may be required to
replace plants at their expense damaged as a result of poor pruning practices including damage by
use of gas-powered hedge trimmers.
68
2.Bedwork/weeding: Bed areas will be kept in a weed-free condition. Hand weeding is encouraged.
In addition, beds will receive an approved pre-emergent and/or post-emergent herbicide as
prescribed in the Frequency Schedule and in accordance with the manufacturer’s
recommendations.
3.Site Issues and Pest Control: The Contractor should inspect the plant area on a regular basis for
site issues such as broken trees and pest problems. If any site or pest problems are found the
Contractor shall notify the Project Manager immediately.
4.Fertilize: All plant materials will receive the required application of fertilizer identified in the
Frequency Schedule and in accordance with the manufacturer’s recommendations. See Frequency
Schedules for deviations.
5.Wood and Bark Mulch: Additional wood or bark mulch will be provided annually to maintain a
maximum depth of two inches, when measured in May. The Contractor will hand weed each site
prior to installing mulch. The Contractor will provide a sample of the new mulch to the Project
Manager before placing. See Sections 2, or 11 regarding which sites receive wood mulch and
which to receive bark mulch. See Frequency Schedules for deviations.
6.Leaf removal: All areas will be kept free of leaves during the fall. The leaves will be picked up
weekly and removed from the site as per the Frequency Schedule. See Frequency Schedules for
deviations.
G.Ground Cover Maintenance
All ground cover in beds will be weeded per the Frequency Schedule. Ground cover will be trimmed or
sheared at the edge of hard surfaces and beds will be trimmed to prevent encroachment into lawn, shrubs or
trees.
H.Hard Surfaces
The entrance drives, sidewalks, curbs, trails and other hard surfaces will be kept free of leaves, moss, litter,
trash and/or garbage. The use of power blowers is acceptable; however, the debris will be removed and not
blown onto adjacent property, street surfaces, or planting beds. Undesirable vegetation in sidewalks, curbs,
and other hard surfaces shall receive an approved herbicide application, mechanically removed (e.g. pulled),
treated with vinegar or moss control products and removed. In no case will any pre-or-post emergent
herbicides with residual characteristic (i.e. Casoron) be used in these areas.
I.Irrigation
Irrigation operations, maintenance, and repair will be performed by the Community Services Department at all
locations except one:
At Site #10, Cedar River Park Frontage, irrigation operations and maintenance will be performed by the
Contractor. The Contractor shall notify the Project Manager in advance for repairs or other issues with the
irrigation system.
J.Traffic Control
When working on street median, traffic circles and/or on street edges, the Contractor shall be responsible for
approved traffic control at all times. At minimum, Contractor’s employees shall wear bright-colored personal
protective equipment including safety vests, hard hats, gloves and protective hearing and eye equipment and;
provide and use safety cones and “work ahead” signs appropriate for the location and to adequately protect
the public and Contractor’s employees.
69
K.Notification
Notify the Community Services Department at 425-430-6600 immediately upon discovery of any unsafe or
hazardous conditions. Notify Project Manager immediately upon discovery of broken, damaged or stolen
equipment, supplies, materials, trees, shrubs, irrigation, facilities, trash containers, and the like or any
vandalism and graffiti. In addition, notify the Project Manager of any additional tasks required beyond the
Frequency Schedules in Section 11; provide cost estimates consistent with the amounts shown in the Cost
per Task sheets in Section 9, prevailing wage rates, and obtain written approval from the Project Manager
prior to scheduling such work.
70
Site 1: Park Ave. N. Frontage
(From North 1st Street to North 6th Street, both sides of street. Clean sidewalks, curblines and tree grates. Remove litter, leaves,
and weeds. Keep debris from entering private property.)
Frequency Schedule
Tree Wells Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Trunk Sprouts 1
Weeding
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - wood chip 1
Leaf Removal 1 2 4
Clean out wells 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 2 2 2 2 2 2 2 2 2 2 2
Litter 4 4 4 4 4 4 4 4 4 4 4
71
Site 1: Park Ave. N. Frontage
(From N. 1st St. to N. 6th St., both sides of street.)
Site Map
72
Site 2: North 3rd Street Frontage
(From Burnett Avenue North to Factory Avenue North, both sides of street. Clean sidewalks and curblines. Mow turf
and edge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from entering private
property. Protect homeowner flower plantings.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1 1
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 2 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge avoid applying to planted plants 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow Section 9, Trim/Edge Applies Here
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
73
Site 2: North 3rd Street Frontage
(from Burnett Avenue North to Factory Avenue North, both sides of street.)
Site Map
74
Site 3: Northeast Park Drive Frontage
(From Logan Avenue North to 400 feet east of I-405, north side of street only. Clean sidewalks and curblines. Remove
litter, leaves and weeds. Mow turf north of sidewalk. Lightly prune shrubs and groundcovers to keep within planting
strips. Add wood chip mulch. Keep debris from entering streets.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1 1
Litter 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
75
Site 3: Northeast Park Drive Frontage
(from Logan Avenue North to 400 feet east of I -405, north side of street only )
Site Map
76
Site 4: Boeing Frontage
(Park Avenue North from North 6th Street to North 7th, only boulevards on north and south side of Boeing pedestrian bridge.
From North 7th Street to North 8th Street, both sides of street and boulevards. North 8th Street, south side only, from Garden
Avenue North to Logan Avenue North. Logan Avenue North, east side only, from North 6th Street to North 8th Street. Mow and
edge planting strips, clean sidewalks and curblines, remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to
keep within boulevards or to rejuvenate. Add fine pine bark mulch to shrub beds and tree rings. Keep debris from entering private
property.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 4 2 2
Trim/edge 1 1 2 2 2 1 1 2 1 1
Fertilize 1 1
Herbicide 1 1
Aerate/Overseed
Shrub Beds/Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 2 1 2 1 2 1 2 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 2 4 4 4 2 2 4 2 2 2
Litter 1 1 2 4 4 4 2 2 4 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
77
Site 4: Boeing Frontage
(On Park Ave. from N. 6th St. to N. 7th St., from N. 7th Street to N. 8th Street; south half of N. 8th St. between Garden
Ave. N. to Logan Ave. N.; east half of Logan Ave. N. from N. 8th Street & N. 6th Street)
Site Map
78
Site 5: Houser Way Bypass Boulevard
(Shrub bed north of 430 Sunset Boulevard Northeast (on Sunset), at end of I-405 exit ramp. Clean curblines. Remove litter,
leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch.
Keep debris from entering surrounding street areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1
Fertilize
Mulch - wood chips 1
Leaf Removal 4
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
79
Site 5: Houser Way Bypass Boulevard
(north of 420 Sunset Boulevard North, between north and south bound lanes at end of exit ramp)
Site Map
80
Site 6: Sunset Boulevard North Frontage
(East side of Sunset Boulevard North from Bronson Way North (SR 169) to Northeast 3rd Street, including beneath south
side of I-405 overpass. Clean sidewalks and curblines. Remove litter, leaves, and weeds. Lightly prune groundcovers to
keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street
areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 1
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
81
Site 6: Sunset Boulevard North Frontage
[East side of Sunset from Bronson Way North (SR 169) to Northeast 3rd Street (including beneath ov erpasses).]
Site Map
82
Site 7: Factory Place North Triangle
(Vacant lot east of 1526 N. 3rd Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves
and weeds. Keep debris from entering private property.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 2 2
Trim/edge 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
83
Site 7: Factory Place North Triangle
(vacant lot east of 1526 N. 3rd Street, mow turf, clean sidewalks and curblines, remove litter, leaves and weeds. Keep
debris from entering private property )
Site Map
84
Site 8: South Cedar Avenue
(Between South 4th Street and Houser Way South, including beneath the south side of I-405 overpass. Includes seating area, all
shrub beds, and stairway. Clean staircase, curblines and parking lots. Remove litter, leaves, and weeds. Lightly prune shrubs and
groundcovers to keep within planting bed or to rejuvenate. Add wood chip mulch. Keep debris from entering surrounding street
areas and private properties.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
85
Site 8: South Cedar Avenue
(between South 4th Street and Houser Way South, along and under I-405 overpass. Includes seating area, all shrub beds, and stairway.)
Site Map
86
Site 9: I-405 Wall at Cedar River Park
(From Houser Way underpass to Maple Valley Highway (SR 169 off ramp). Clean sidewalks and curblines. Remove litter, leaves,
and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to rejuvenate. Add fine pine bark mulch. Keep
debris from entering surrounding park areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 4 4 4 4 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
87
Site 9: I-405 Wall at Cedar River Park
(1715 Maple Valley Highway. From Houser Way North underpass north to SR 169, along I-405 off-ramp.)
Site Map
88
Site 10: Cedar River Park Frontage
(South side of SR 169 from I-405 to park’s east property line, including the center boulevard and 180’ south along park
entrance both sides of road. Operate and maintain irrigation system. Mow and edge turf. Clean sidewalks and
curblines. Remove litter, leaves, and weeds. Lightly prune shrubs and groundcovers to keep within planting bed or to
rejuvenate. Add fine pine bark mulch. Keep debris from entering surrounding street and park areas.
Operate and Maintain Irrigation System at this Site Only
Frequency Schedule
Irrigation System Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Start-up 1
Winterize 1
Monitor/Adjust 1 1 1 1 1 1
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 4 2 2 4 2 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 2 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 1 1 1 1 1 1 1 1 1 1 1
Litter 2 2 2 2 2 2 2 2 2 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
89
Site 10: Cedar River Park Frontage
(1715 Maple Valley Highway. South side of SR 169, from I-405 overpass, including boulevard, east to park entrance,
including 180 feet south into entrance on both sides of park road.)
Operate and Maintain Irrigation System at this Site Only
Site Map
90
Site 11: Maple Valley Highway Berm/Frontage
(North side of SR 169 from 140th Place Southeast to 149th Avenue Southeast. Mow turf. Clean pathway. Remove litter,
leaves, and weeds. Add wood chip mulch to tree rings. Keep debris from entering street, pathway and park areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
91
Site 11: Maple Valley Highway Berm/Frontage
(north side of SR 169 from 140th Place Southeast to 149 Avenue Southeast.)
Site Map
92
Site 12: Northeast Sunset Boulevard Triangle
(Sunset Boulevard Northeast and Northeast Park Drive, north of 1170 Sunset Boulevard Northeast. Mow and edge turf.
Clean sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep debris from
entering surrounding streets and private property.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 1 1 2 2 1
Trim/edge 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 2 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 4 4 4 4 4 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
93
Site 12: Northeast Sunset Boulevard Triangle
(Sunset Boulevard Northeast and Northeast Park Drive, northwest of 1170 Sunset Boulevard Northeast)
Site Map
94
Site 13: Northeast Sunset Boulevard Frontage
Edmonds Avenue Northeast to 2502 Northeast Sunset Boulevard, first driveway on north side of Sunset; sidewalks only,
both sides of street. From 2502 NE Sunset Boulevard to Harrington Ave. NE; sidewalks both sides of street and turf
areas (north side of street, north of sidewalk to fence). From Harrington AvenueNortheast to Northeast 12th Street,
south side only up to but not including Walgreens, sidewalk and planting strips. Mow and edge turf. Clean sidewalks
and curblines. Remove litter, leaves, and weeds. Keep debris from entering streets and pivate property areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 2 4 4 4 2 2 2 2 2
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize 1
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 4 4 4 4 4 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
95
Site 13: Northeast Sunset Boulevard Frontage
[from Edmonds Ave NE to NE 12 Street:
•Edmonds Ave. NE to 2502 NE Sunset Blvd. (first driveway on north side of Sunset; sidewalks only, on both sides).
•From 2502 NE Sunset Blvd. to Harrington Ave. NE; sidewalks (both sides) & turf areas (north of sidewalk to fence).
•From Harrington Ave. NE to NE12th Street – south side only up to but not including Walgreens; sidewalk & turf areas.]
Site Map
96
Site 14: Harrington Avenue Northeast Boulevard
[Harrington Avenue Northeast and Northeast 5th Street (north of 2721 Harrington Avenue NE). Mow turf. Remove litter, leaves,
and weeds. Keep debris from entering surrounding streets and private property areas.]
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
97
Site 14: Harrington Avenue Northeast Boulevard
(Harrington Avenue Northeast and Northeast 5th Street; north of 2721 Harrington Avenue Northeast.)
Site Map
98
Site 15: Northeast 2nd Street Frontage
(North side of Northeast 2nd Street from Monroe Avenue Northeast to Public Works gate at 3555 Northeast 2nd Street. Clean
curblines. Remove litter, leaves, and weeds. Lightly prune shrubs to keep within planting bed or to rejuvenate. Add wood chip
mulch. Keep debris from entering street.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
99
Site 15: Northeast 2nd Street Frontage
(North side of Northeast 2nd Street from Monroe Ave NE to Public Works Shop gate at 3555 NE 2nd St.)
Site Map
100
Site 16: Public Works Shops (Saturday Only Site)
(3555 Northeast 2nd Street. Mow turf and edge. Clean employee parking lots, sidewalks and curblines. Remove litter, leaves and
weeds. Lightly prune shrubs and groundcovers to keep within planting beds, clear building walls or to rejuvenate. Add fine pine
bark mulch to tree wells and shrub beds.)
Maintenance work can only occur on Saturday at this location
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 3 4 4 4 4 3 4 4 2
Trim/edge 1 2 2 2 2 2 2 2 2 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
101
Site 16: Public Works Shops (Saturday Only Site)
(3555 Northeast 2nd Street)
Maintenance work can only occur on Saturday at this location
Site Map
102
Site 17: Northeast 4th Street Frontage
(North side of street from Union Avenue Northeast to 4350 Northeast 4th Street and; south side of street from
4301 to 4405 Northeast 4th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and
weeds. Add fine pine bark mulch to tree wells. Keep debris from entering surrounding street and private property
areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch Tree Rings - fine pine bark 1
Leaf Removal 4 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
103
Site 17: Northeast 4th Street Frontage
(North side of street from Union Ave. NE to 4350 NE 4th St; south side of street from 4301 to 4405 NE 4th St.)
Site Map
104
Site 18: Harrington Avenue Northeast Frontage
(West side of street from Northeast 16th Street, south to Northeast 12th Street. East side of street, from Northeast 16th
Street to Northeast 10th Street. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds.
Lightly prune shrubs and groundcovers in swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings
and to swale shrub beds. Keep debris from entering surrounding streets and private property areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2 1
Prune Groundcover 1
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 4 4 4 4 4 4 4 4 2 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 105
Site 18: Harrington Avenue Northeast Frontage
(West side of street from NE 16th St. to NE 12th St; East side of street from NE 16th St. to NE 10th St.)
Site Map
106
Site 19: Duvall Avenue Northeast Frontage
(West side of street from 1827 Duvall Avenue Northeast to 4626 Northeast 24th Street, then from 2501 Duvall Avenue Northeast
at wall to Renton city limits. East side of street from 1702 Duvall Avenue Northeast to 2322 Duvall Avenue Northeast, then from
driveway at 4702 Northeast 25th Street to Southeast 95th Way intersection. Clean sidewalks and curbline. Remove litter, leaves
and weeds. Lightly prune shrubs and groundcovers to keep within beds, at or below 3 feet in height for visual clearance at
intersections or to rejuvenate. Add wood chip mulch to tree and shrub beds. Keep debris from entering surrounding streets and
private property areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 2 2 2 2 2 2 2 2 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
107
Site 19: Duvall Avenue Northeast Frontage
(West side of street from 1827 Duvall Ave. NE to 4626 NE 24th St, then from 2501 Duvall Ave. NE, at wall, to Renton
city limits; East side of street from 1702 Duvall Ave. NE to 2322 Duvall Ave. NE, then from driveway at 4702 NE
25th St. to SE 95th Way intersection)
Site Map
108
Site 20: Coal Creek Parkway Frontage
(East side of street from NE 95th Way to Southeast May Valley Road. Clean sidewalks and curblines. Remove litter, leaves and
weeds. Lightly prune trees and shrubs to keep within beds. Add wood chip mulch to tree and shrub beds.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1
Bed Weeding 1 1 1 1 2 2 2 2 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
109
Site 20: Coal Creek Parkway Frontage
(East side of street from SE 95th Way to SE May Valley Rd.)
Site Map
110
Site 21: Talbot Road Frontage
(South of I-405 overpass to South Puget Drive, including beneath overpass. Mow and edge turf. Remove litter, leaves and weeds.
Add fine pine bark mulch to tree rings. Keep debris from entering surrounding private property.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
111
Site 21: Talbot Road Frontage
(South of I-405 overpass to Puget Drive, both sides of street including beneath overpass)
Site Map
112
Site 22: Lake Avenue Open Space
(Vacant lot at 1511 Lake Avenue South. Mow turf. Remove litter, leaves and weeds. Add wood chip mulch to tree
rings. Keep debris from entering surrounding private property.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 2 2 2 2 2 2 2 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
113
Site 22: Lake Avenue Open Space
(vacant lot at 1511 Lake Avenue South.)
Site Map
114
Site 23: Talbot Hill Reservoir Park
(1900 Talbot Road South. Mow and edge turf, including along streets. Clean parking lot. Remove litter, leaves and weeds. Empty
trash cans and replace with new liners. Lightly prune groundcover and shrubs to keep within beds, clearance along walls, or to
rejuvenate. Add wood chip mulch to tree rings and shrub beds.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 2 2 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
115
Site 23: Talbot Hill Reservoir Park
(1900 Talbot Road South)
Site Map
116
Site 24: Shattuck Avenue South Frontage
(Between Houser Way South and South 4th Place, both sides of street and beneath railroad overpass. Remove litter, leaves and
weeds. Lightly prune shrubs and groundcovers to keep within beds or to rejuvenate. Add wood chip mulch to beds. Keep debris
from entering surrounding streets and private property areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 2 2 2 2 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 2 2 2 2 1 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
117
Site 24: Shattuck Avenue South Frontage
(between South 4th Place and Houser Way South, both sides of street, small boulevard and underpass)
Site Map
118
Site 25: Rainier Avenue South
(Between South Grady Way and 250 Rainier Avenue South, both sides of street and boulevards. Clean sidewalks and
curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers to keep within beds, to rejuvenate,
or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds; add fine pine bark mulch to planting
strips. Keep debris from entering surrounding private property. See detailed plan for specific maintenance
boundaries.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1 1 1
Bed Weeding 1 1 4 4 4 4 4 4 4 4 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal
Prune Groundcover 1 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4
Litter 8 8 8 8 8 8 8 8 8 8 8 8
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
119
Site 25: Rainier Avenue South
(between South Grady Way and 250 Rainier Avenue South, both sides of street and boulevards.)
See detailed site plan of areas for specific maintenance boundaries
Site Map
120
Site 26: Southwest Grady Way Frontage
(North side of Southwest Grady Way from Oakesdale Avenue Southwest to Longacres Avenue Southwest at King County
Metro driveway, 1520 Southwest Grady Way. Mow and edge turf. Clean sidewalks and curblines. Remove litter, leaves
and weeds between street and fence, including gateway sign area. Lightly prune shrubs and groundcovers to keep
within beds, to rejuvenate, or for visual clearance. Add wood chip mulch to boulevard tree and shrub beds. Keep debris
from entering surrounding streets.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 2 2 1
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 2 4 4 2 2 2 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
121
Site 26: Southwest Grady Way Frontage
(North side of SW Grady Way from Oakesdale Ave. SW to Longacres Ave. SW up to King County Metro driveway at
1520 SW Grady Way.)
Site Maps
122
Site 27: Oakesdale Ave. S.W./Black River Frontage
(Between 602 Oakesdale Avenue Southwest and 1,060 feet north to end of sidewalk on Monster Road Southwest,
north side of street, including the center boulevard. Mow turf and edge. Clean parking lot, sidewalks (including
bridge) and curblines. Remove litter, leaves and weeds. Empty trash containers and replace liners. Keep debris
from entering street.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 4 2 1
Trim/edge 1 1 2 2 2 1 1 2 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
123
Site 27: Oakesdale Ave. S.W./Black River Frontage
(North of 602 Oakesdale Ave. SW to 1,060 feet north at end of sidewalk.)
Site Maps
124
Site 28: Southwest 27th Street Frontage
(From Oakesdale Avenue Southwest to Naches Avenue Southwest, both sides of street, including center boulevard. Mow and
edge turf. Clean bike path, sidewalks and curblines. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Keep
debris from entering surrounding streets and private property areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 4 4 4 2 2 2 2 1
Trim/edge 1 1 2 2 2 1 1 1 1 1
Fertilize
Herbicide 1 1
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 4 4 4 2 2 2 2 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
125
Site 28: Southwest 27th Street Frontage
(between Oakesdale Avenue Southwest and Naches Avenue Southwest.)
Site Map
126
Site 29: Springbrook Trail
(Segment 1: From Black River Riparian Forest trailhead along Oakesdale Avenue Southwest to Southwest 16th Street.
Mow turf. Clean trail, sidewalks and curblines. Remove litter, leaves, moss and weeds. Lightly prune trees/shrubs to
keep out of trail shoulders. Empty trash containers and replace liners. Segment 2: At 800 Southwest 27th Street
beginning 1,055 feet north of Southwest 27th Street to Southwest 43rd Street. Mow turf. Clean trail, sidewalks and
curblines. Remove litter, moss, leaves and weeds. Lightly prune shrubs to keep out of trail shoulders Empty trash
containers and replace liners.)
Pressure wash trail boardwalk segment south of Southwest 27th Street
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 2 2 2 2 2 2 2 1
Trim/edge 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Tree/Shrub Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Blackberry 1 1
Prune Tree Branches 1 1
Herbicide - pre-emerge
Herbicide - post-emerge 1
Moss Removal 1
Mulch
Leaf Removal 2 4 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Pressure wash boardwalk 1
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
127
Site 29: Springbrook Trail
(from Black River Riparian Forest trailhead south to SW 16th St.; from 1,055 feet north of SW 27th St. to SW 43rd St.)
Site Map
128
Site 30: Springbrook Trail – Boeing-Longacres Segment
(From SW 16th Street to the north property line and parking lot at 1905 Raymond Avenue SW, a total distance of
approximately 1,460 feet. Clean trail, remove litter, control moss, and clean 2 interpretative signs.)
Frequency Schedule
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Clean pathway & signs 2 2 2 2 2 2 2 2 2 2 2 2
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site Map
129
Site 31: Edlund Farm Open Space
(17611 Southeast 103rd Avenue. Mow field, planting strip and edge along street. Clean sidewalks and curblines. Remove litter.
Exclude immediate areas around houses maintained by residents.
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1
Trim/edge 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
130
Site 31: Edlund Farm Open Space
(17611 Southeast 103rd Avenue. Mow and edge turf, clean sidewalks and curblines; remove litter, leaves, and weeds; keep debris
from entering surrounding streets and private property areas. Exclude immediate area around houses that are maintained by the
residents.)
Site Map
131
Site 32: Cleveland Farm Open Space
(19415 Talbot Road South. Mow fields. Remove litter. Control blackberry shrubs at Southwest entrance. Exclude area around
house maintained by residents. Schedule field mowing during periods of dry soil conditions.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
132
Site 32: Cleveland Farm Open Space
(19415 Talbot Road South)
Site Map
133
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1
Trim/edge 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Blackberry Shrubs Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
Site 33: 11017 Southeast 186th Place Open Space
(Vacant lot. Mow field. Clean sidewalk and curbline. Remove litter.)
134
Site 33: 11017 Southeast 186th Place Open Space
(Vacant lot south of 11018 SE 186th Place)
Site Map
135
Site 34: Tiffany-Cascade Connector Trail and Frontage
(East of 12130 Southeast 160th Street. Mow grass north of sidewalk/street and two passes on trail from Southeast 160th Street to
pipeline. Clean sidewalks and curblines. Remove litter. Keep debris from entering surrounding streets.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 1 1 1 1 1 1 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 2 2 2 2 2 2 2 2 2 2
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
136
Site 34: Tiffany-Cascade Connector Frontage
(east of 12130 Southeast 160th Street)
Site Map
137
Site 35: Lake Washington Boulevard North Frontage
(4350 Lake Washington Boulevard North. Mow and edge turf. Clean sidewalks and curblines, including east side of
bridge. Remove litter, leaves and weeds. Add wood chip mulch to tree rings. Empty trash container and replace liner.
Keep debris from entering street.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 1 1 1 1 1 1 1 1 1 1
Fertilize
Herbicide
Aerate/Overseed
Tree Rings Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1 1 1 1 1
Herbicide - pre-emerge 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 1
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
138
Site 35: Lake Washington Boulevard North Frontage
(4350 Lake Washington Boulevard North)
Site Map
139
Site 36: May Creek Trail
(4350 Lake Washington Boulevard North. Control invasive knotweed in natural area. Prune vegetation encroaching to edge of
pathway. Clean area of litter.)
Frequency Schedule
Knotweed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Herbicide - post emerg.1
Pathway Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1 1 1
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
140
Site 36: May Creek Trail
(4350 Lake Washington Boulevard North)
Site Map
141
Site 37: Seahawks Sign Frontage
(Southwest corner of Seahawks Way and Lake Washington Boulevard North. Clean sidewalk and curblines. Lightly prune shrubs
and groundcover to keep within beds, maintain sign visibility or to rejuvenate. Remove litter, leaves and weeds. Add fine pine
bark mulch.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs
Bed Weeding 1 1 1 1 1
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - fine pine bark 1
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 2 2 2 2 2 2 2 2 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
142
Site 37: Seahawks Sign Frontage
(at the soutwest corner of Lake Washington Blvd. N. and Seahawks Way)
Site Map
143
Site 38: Ripley Lane Trail and Frontage
(East of 5031 Ripley Lane North at trailhead, then 875 feet north to Renton city limits. Mow and edge turf,
including street frontage. Clean pathway and street of litter, stones/debris, leaves and weeds. Prune vegetation
away from fence or to keep trail open to both sides. Empty trash can and replace with new liner.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 1 2 2 2 2 2 2 2 2 1
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Blackberry/invasives Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1 1 1 1
Bed Weeding
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch
Leaf Removal
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter, stones, debris 1 1 2 2 2 2 2 2 2 2 1 1
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
144
Site 38: Ripley Lane Trail and Frontage
(east of 5031 Ripley Lane North at trailhead, then 875 feet north to city limits)
Site Map
2022-2024 CONTRACT LANDSCAPE MAINTENANCE
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
145
Site 39: New Sunset Park
(2715 Block NE 10 Street: Two open fields between Sunset Lane NE and NE 10 Street; weed two detention ponds.
Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to
detention pond.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow Fields
Mow Planting Strips
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
2 Detention Ponds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 4 4 4 4 4 4 4 4 2 2
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 1 4 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow Section 9, Trim/Edge Applies Here
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 2019-2021 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
2022-2024 CONTRACT LANDSCAPE MAINTENANCE/Frequency Schedules
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
146
33 339911i’It--t‘+)3*+9+333*4++343*3\+3÷33444*33394r..N:;J433,14**+3 3 3*33.4+.4.4 .44**9343493i* *4*+3333*11913343 9**33+333 9**933+334**3*+-t33**TI‘I*-•*++9**4---33 33*43333333*+331++.4*3333 33 43*43*3•3333.4*3++3 33 34*3—I+•339*431333-33**334tjt+3333*333333*93339**+33 33 3*+343433*43 33 3*33334337t43**3*+9*+37343-*3C33 3+3*1+33.433333 33**‘4‘44%‘4IEpIFI?L--’S.SSite 39 Sunset Neighborhood ParkShrub Bed Areas: weed 2 detention ponds, clean sidewalks and curblines, mow turf and edge, remove litter/leaves/weeds, add wood chip mulch to beds/pondSite 392022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 147
Site 40: Logan Avenue North Frontage
(The east side of Logan Avenue North, including boulevards and east side of sidewalks, from the Cedar River, north to
North 6th Street. Boulevards, sidewalks, curblines, and shrub beds.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow Turf
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub and G.C. Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 4 4 4 4 4 4 4 4 4 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1 1
Fertilize
Mulch - fine bark 1
Leaf Removal 1 4 2
Prune Groundcover 1 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding See Shrub and G.C. Beds Above
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 4 4 4 4 4 4 4 4 4 4 4 4
Litter 4 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right-
of-Way, Facilities, Parks, Trails and Open Space Landscaping
148
Site 40 Logan Avenue North
Notes
From Cedar River lo N 6 Street. eallt side of street
and two boulCl\lards only
0
512 Q 256 512 Fftll
GS_ 1984_ Web_Mercator_Auxihary _Sphere
Legend
Weed shrub beds, remove litter and leaves, add fine bark mulch along
east side of Logan Avenue North, two boulevards, and short sections
along North 3rd and 4th Streets.
2022-2024 CONTRACT GROUNDSKEEPINGRight-of-Way, Facilities, Parks, Trails and Open Space Landscaping
149
Site 41: Duvall Avenue Northeast Boulevard
(Two boulevards north and south of NE 8th Street. Clean curbline. Remove litter, leaves and weeds. Lightly prune shrubs and
groundcovers to keep within beds, at or below 3 feet in height for visual clearance at intersections or to rejuvenate. Add wood
chip mulch to tree and shrub beds. Keep debris from entering surrounding streets.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 1 2 2 2 2 2 2 2 2 1 1
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - fine pine bark 1
Leaf Removal 1 2 2
Prune Groundcover 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right-
of-Way, Facilities, Parks, Trails and Open Space Landscaping
150
Clean curb line. Remove litter, leaves and weeds. Lightly prune
shrubs and ground cover plants to keep within beds, at or below 3
feet in height for visual clearance at intersections or to rejuvenate.
Add wood chip mulch to tree and shrub beds. Keep debris from
entering surrounding streets.
2022-2024 CONTRACT GROUNDSKEEPING
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
151
Site 42: Heritage Park Shrub Bed
Frequency Schedule
Shrub Bed Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 2 2 2 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1
Herbicide - post-emerge 1 1 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 1 2 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding Included as part of above Bed Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 1 2 2 2 2 2 2 2 2 2 2 1
Litter 1 1 1 1 1 1 1 1 1 1 1 1
2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right-
of-Way, Facilities, Parks, Trails and Open Space Landscaping
(233 Union Avenue NE: Large shrub bed between turf and asphalt pathway. Remove litter, leaves and weeds.
Add wood chip mulch. Added shrub bed area.)
152
HeritageParkShrubBedLegendPontsofInterestParksWaterbQdiesNotesNone0—-—--J128064128FeiGS19$4WeSMercatorAuxarySphereStreets2015sidRdDdni1Gee.Sar,12CatheExtentl44kInformationTechnologyGISRononMapSupprlRntvnwa11)6/201BIinanuc&ITDivisionene*edMcOqVlETc.riirrenwTHISMAPISNOTTOBEUSEDFORNAVIGATIONRemove litter, leaves and weeds. Add wood chip mulch.Site 422022-2024 CONTRACT GROUNDSKEEPING Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping 153
Site 43: Harrington Avenue Northeast- South
Unit Frontage
(East side of street from Northeast 8th Place, south to Northeast 7th Street. Mow and edge turf. Clean sidewalks and
curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in swales to keep within beds or to
rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris from entering surrounding streets
and private property areas.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Mow 2 4 4 4 4 4 4 4 4 2
Trim/edge 2 2 2 2 2 2 2 2 2 2
Fertilize 1 1 1
Herbicide 1 1
Aerate/Overseed
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Prune Shrubs 1
Bed Weeding 1 2 2 2 2 2 2 2 2 2
Herbicide - pre-emerge 1 1 1
Herbicide - post-emerge 1 1
Fertilize
Mulch - wood chips 1
Leaf Removal 2 2 1
Prune Groundcover 1
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow
Litter 2 2 4 4 4 4 4 4 4 4 2 2
2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right-
of-Way, Facilities, Parks, Trails and Open Space Landscaping
154
Site 43: Harrington Avenue Northeast- South
Unit Frontage
(Reference Point: 820 Harrington Ave. NE: East side of street from Northeast 8th Place, south to Northeast 7th Street. Mow
and edge turf. Clean sidewalks and curblines. Remove litter, leaves and weeds. Lightly prune shrubs and groundcovers in
swales to keep within beds or to rejuvenate. Add wood chip mulch to tree rings and to swale shrub beds. Keep debris
from entering surrounding streets and private property areas.)
. .., .,,. rr...::,.1 W1'J ·,�
rt��::·
oJ..u;
��•kHT•,--.:-,(•,o..,..,.._-,.,
_""'],:, .. 1,, .... -:� t3G ;-w:."?.��/�w.
;�:�.""� �- '?�.
� �"P::;,.1;�:1:".'i�"•-.e �!-� iff'� it�.:. .,. tr:�: ... ·:,. u v-t.:.n • :�.?� c.�t'J,�:�/'.i"" ,o., ... r-::J •""ll: �'°' V .... to.-1 •• :,,:,: IIX&.-i
-•-•• .,,.....r,: "IA""C l -• r,e,� fifij
��=�,-,,·,1 :-::���',._U1Cllt:-•'lt'ftv --�-=-w.'"l' - . l <
HBB
·,_,,'
l\,Ulll'Njf:,,l.:.,'E•.Llll!'-lfllt .... S.C� !.Ntnc;."lf�.1'>1rr lill([/11CO'Ml'UN
Site Map
2022-2024 CONTRACT GROUNDSKEEPING
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
155
Site 44: Sunset Lane and NE 10 Street Frontages
(2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Boulevard and NE 10 Avenue moving
counterclockwise: Newly created planting strips between sidewalks and curbs along the north side of NE 10 Street
from NE Sunset Boulevard to Glenwood Avenue NE; also both sides of street adjacent to the Renton Highlands Library
on NE 10 Avenue; along the southerly and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th
Avenue at the library; along Harrington Avenue NE between NE Sunset Boulevard and Sunset Lane NE on both sides
of the street; along both sides of the street on Glenwood Avenue NE and along both sides of Harrington Avenue NE
north of NE 10 Street and; along both sides of Sunset Lane NE northeasterly of NE 10 Street. Sidewalks, curblines, and
shrub beds containing shrubs, groundcovers, perennials and mulch. Remove litter, leaves and weeds. Add wood chip
mulch.)
Frequency Schedule
Shrub Beds Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Bed Weeding 1 2 2 2 2 2 2 2 2 1 0
Herbicide - pre-emerge
Herbicide - post-emerge
Fertilize
Mulch - wood chips 1
Leaf Removal 1 2 2
Prune Groundcover 1 1 1
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Weeding Included as part of above Bed Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
Sweep/blow 2 4 4 4 4 4 4 4 4 4 4 4
Litter 2 4 4 4 4 4 4 4 4 4 4 4
2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right-
of-Way, Facilities, Parks, Trails and Open Space Landscaping
156
Site 44: Sunset Lane and NE 10 Street Frontages
(2680 Sunset Lane NE: Beginning at the intersection of NE Sunset Boulevard and NE 10 Avenue moving counterclockwise: Newly
created planting strips between sidewalks and curbs along the north side of NE 10 Street from NE Sunset Boulevard to
Glenwood Avenue NE; also both sides of street adjacent to the Renton Highlands Library on NE 10 Avenue; along the southerly
and westerly side of Sunset Lane NE from Glenwood Avenue NE to NE 10th Avenue at the library; along Harrington Avenue NE
between NE Sunset Boulevard and Sunset Lane NE on both sides of the street; along both sides of the street on Glenwood
Avenue NE and along both sides of Harrington Avenue NE north of NE 10 Street and; along both sides of Sunset Lane NE
northeasterly of NE 10 Street. Sidewalks, curblines, and shrub beds containing shrubs, groundcovers, perennials and mulch.
Remove litter, leaves and weeds. Add wood chip mulch.) Addendum 6 to CAG-16-078. Above descriptions depicted as areas
that are in color on the map.
Sunset
Neighborhood
Park
Site Map
2022-2024 CONTRACT GROUNDSKEEPING
Right-of-Way, Facilities, Parks, Trails and Open Space Landscaping
157
Site 45: Sunset Park Phase 2
(2715 Block NE 10 Street: new park area south of New Sunset Park between Sunset Lane NE and NE 10 Street;
weed rain gardens. Clean sidewalks and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add
wood chip mulch to beds and gardens.)
Frequency Schedule
Turf Jan Feb Mar Apr May June July Aug Sept Oct Nov
Mow Fields
Mow PlantinQ Strips
Trim/edge
Fertilize
Herbicide
Aerate/Overseed
2 Detention Ponds June July Aug Sept Oct Nov
Bed Weeding
Jan Feb Mar Apr May
2 2 2 4 4 4 4 4 4 2 2
Herbicide -pre-emerge
Herbicide -post-emerge
Fertilize
Mulch -wood chips 1
Leaf Removal 1 2
Prune Groundcover
Groundcover Jan Feb Mar Apr May June July Aug Sept Oct Nov
Weeding
Hard Surfaces Jan Feb Mar Apr May June July Aug Sept Oct Nov
Sweep/blow Section 9, Trim/Edge Applies Here
Litter 4 4 4 4 4 4 4 4 4 4 4
Dec
Dec
2
2
Dec
Dec
4
2022-2024 CONTRACT GROUNDSKEEPING/Frequency Schedules Right-
of-Way, Facilities, Parks, Trails and Open Space Landscaping 158
)::PDWeed rain gardens and beds. Clean sidewalks, and curblines. Mow turf and edge. Remove litter, leaves and weeds. Add wood chip mulch to rain gardens and bedsSite 45Site Map2022-2024 CONTRACT GROUNDSKEEPINGRight-of-Way, Facilities, Parks, Trails and Open Space Landscaping 159