HomeMy WebLinkAboutR-419002NW 1/4 OF THE NW 1/4 AND THE NE 1/4 OF THE NW 1/4 SECTION 9, TOWNSHIP 23 NORTH, RANGE 05 EAST, W.M. a LU I O Cn Q z J CITY OF RENTON EROSION CONTROL NOTES: 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTILSUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. 13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. CONSTRUCTION SEQUENCE: ABBREVIATIONS 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN 1. PRE -CONSTRUCTION MEETING. APPROX APPROXIMATELY INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION BC BOTTOM OF CURB AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A 2. POST SIGN WITH NAME AND PHONE NUMBER OF CSWPP/ESC SUPERVISOR (MAY BE BOTTOM OF EXCAVATION SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY BE CONSOLIDATED WITH THE REQUIRED NOTICE OF CONSTRUCTION). BMP BEST MANAGEMENT PRACTICES INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING BOE BOTTOM OF EXCAVATION CONDITION. 3. FLAG OR FENCE CLEARING LIMITS. BP BOTTOM OF POND BW BACK OF WALL 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF 4. INSTALL CATCH BASIN PROTECTION AND STORMWATER BMP AREA PROTECTION CB CATCH BASIN THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE AS REQUIRED. CCR COORDINATED CIVIL REVIEW CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH 'i CENTERLINE SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). CO CLEAN OUT COMM COMMUNICATIONS 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY COR CITY OF RENTON SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL 6. INSTALL PERIMETER PROTECTION (SILT FENCE, BRUSH BARRIER, ETC.). DI DUCTILE IRON PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO DOE DEPARTMENT OF ECOLOGY ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE 7. CONSTRUCT SEDIMENT PONDS AND TRAPS . DOM DOMESTIC TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES DR DOOR ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 8. GRADE AND STABILIZE CONSTRUCTION ROADS. EL ELEVATION ELEC ELECTRICAL 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES 9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE EX/EXIST EXISTING OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) DRAINS, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING FOR PROJECT FD FRENCH DRAIN SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID DEVELOPMENT. CONSTRUCT SWPPS CONTROLS IN ANTICIPATION OF SCHEDULED FDC FIRE DEPARTMENT CONNECTION SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. CONSTRUCTION ACTIVITY (E.G., CONCRETE -RELATED PH MEASURES FOR UTILITY, FF FINISHED FLOOR VAULT OR ROADWAY CONSTRUCTION). FIG FINISHED GRADE 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED FL FLOW LINE AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH APPENDIX D OF FS FIRE SERVICE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE THE CITY OF RENTON SURFACE WATER DESIGN MANUAL AND MANUFACTURER'S FW FACE OF WALL SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN RECOMMENDATIONS. HP HIGH POINT EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO IE INVERT ELEVATION REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW MEASURES SO THAT LD LF LANDING LINEAL FEET 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL AND LP LOW POINT STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, POLLUTION PREVENTION IS ALWAYS IN ACCORDANCE WITH THE CITY'S EROSION LT LEFT ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, AND SEDIMENT CONTROL STANDARDS. ME MATCH EXISTING FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING MECH MECHANICAL CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS MEP MECHANICAL ELECTRICAL PLUMBING OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE DURING THE DRY SEASON 0 TWO DAYS DURING THE WET SEASON WITH STRAW, MH MANHOLE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL WOOD FIBER MULCH, COMPOST, OR EQUIVALENT. MMA METHYL METHACRYLATE DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE MON MONUMENT FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS. NO. NUMBER NTS NOT TO SCALE 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS. PE POLYETHELYNE EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS PED PEDESTRIAN RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE 15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED AREAS MUST BE PIV POST INDICATOR VALVE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF STABILIZED AND BMPS REMOVED IF APPROPRIATE. POC POINT OF CONNECTION ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PSE PUGET SOUND ENERGY INTERNATIONAL BUILDING CODE. 16. APPLY DUST CONTROL (BMP C140), SAWCUTTING AND SURFACING POLLUTION R RADIUS PREVENTION (BMP 152). ROW RIGHT OF WAY RT RIGHT SD STORM DRAIN 17. COMPLETE MASS GRADING. SQ SQUARE FEET SS SANITARY SEWER SSS SANITARY SIDE SEWER ST SOUND TRANSIT STA STATION STD STANDARD STW STORMWATER TC TOP OF CURB TESC TEMPORARY EROSION AND SEDIMENTATION CONTROL TP TOP OF POND TW TOP OF WALL TYP TYPICAL W WATER WQ WATER QUALITY WSDOT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION • Call 811 • ® two business days before you dig 1 CLEAR AND GRADE PERMIT 2 CLEAR AND GRADE PERMIT RESUBMITTAL 3 CLEAR AND GRADE PERMIT RESUBMITTAL wil REVISION TJP 08/10/21 JSF SURVEYED: ZLN TJP 08/11/21 JSF DESIGNED: TJP/JRN TJP 09/10/21 JSF DRAWN: TAD/KSA CHECKED: MNF BY DATE APPR APPROVED: JSF 1q)ff 1601 5th Avenue, Suite 1600 Seattle, WA 98101 206.622.5822 www_knff_cnm 09/10/2021 SCALE: VERTICAL: NAVD 1988 AS NOTED HORIZONTAL: NAD 1983/1991 It* CITY OF RENTON ONE INCH DATU M AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH SCALE ACCORDINGLY R-419002 IN COMPLIANCE WITH CITY OF RENTON STANDARDS LMDEVIELOPMENT ENGINEERING SURFACE WATER UTILITY , ,sippo 09/27/2021 krevans 09/27/2021 Fjhobs WATER UTILITY on 09/28/2021 DATE: SOLERA 2842 NE SUNSET B LV D FIELDBOOK: PAGE: RENTON WA 98056 7 DRAWING N0: C0.1 1 NOTES SHEET: 2 OF:9 T N C N Q J