Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_220119_v1 LARS ANDERSEN & ASSOCIATES, INC. CIVIL ENGINEERS • LAND SURVEYORS • PLANNERS ADA COMPLIANCE • LEED ACCREDITED • STORM WATER QUALITY 4694 W JACQUELYN AVENUE FRESNO, CA 93722 PH (559) 276-2790 FX (559) 276-0850 TEXAS REGISTERED ENGINEERING FIRM F-18450 SCOTT A. MOMMER, PE, QSD PRESIDENT _______________________________ DANIEL J. ZOLDAK, PE, PLS CASp, LEED AP, QSD/P VICE PRESIDENT Wednesday, January 19, 2022 Re : HOME DEPOT RENTON Construction Mitigation Plan I. Proposed Construction Dates Demo February 2022 Interior Slab and Interior Foundation Work March 2022 – April 2022 Building and site work May 2022 – February 2023 II. Hours and Days of Operation (Construction) Hours of Construction Operation would be 7 am to 7pm Mon – Friday. Occasional Saturday upon approval of the City waiver approval which will be requested per week basis. III. Proposed Hauling routes The project would use west on S. Grady Way to access the 405/167 interchange IV. Measure Implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise and other noxious characteristics The project construction will primary be located within the existing building limits and therefore minimizing dust, erosion, mud, noise and other noxious characteristics to the surrounding area. The project will also implement and erosion control and dust control plan to minimize and exterior disturbance. Construction parking and traffic will be directed to minimize disturbance and noise to neighboring properties. Hauling of spoils will be limited to day hours. V. Any special hours proposed for construction or hauling (i.e. weekends, late nights) Hauling of spoils will be limited to day hours. VI. Preliminary Traffic Control Plan No offsite improvement are proposed at this time