Construction Mitigation Description
Chick-fil-A Restaurant
375 Rainier Ave S
Renton WA 98055
11/21/21
Planning Division
City of Renton
1055 South Grady Way, Renton, WA 98057
Proposed Construction Start Date:
• Fourth Quarter, 2022
Hours of Operation:
• Per City Restrictions
“Commercial, multi-family, new single family and other non-residential construction activities shall be
restricted to the hours between 7:00 a.m. and 8:00 p.m., Monday through Friday. Work on Saturdays
shall be restricted to the hours between 9:00 a.m. and 8:00 p.m. No work shall be permitted on
Sundays”.
• Majority of the work will be performed Monday through Friday from 7am to 5pm.
Proposed Hauling/Transportation Routes:
• Access from Rainier Ave and Renton.
Measures to be implemented to minimize dust/traffic/erosion/mud/noise:
• Temporary fencing will be provided around the perimeter of the subject site
• Erosion control measures will be provided as required by the City.
• Construction noise will be limited to the allowed hours of construction established in the City code. No special
hours of operation are anticipated.
Estefania Escamilla
4G Development & Consulting, Inc.
Phone: 619-654-4431
Email: eescamilla@4gdev.com
Address: PO BOX 270571, San Diego, CA 92198
Phasing:
The goal is to always have the DT open in some form. Because
we have the ability to demo curbs and pour new DT on
the northern part of the site, we should be able to make
all transitions on Saturday evening/Sunday for Monday
green light. We will make sure we have clear signage,
striping, and delineation to keep traffic flow moving.
All vehicles will have the same access as they currently do.
Once we are ready to transfer from current DT to new DT
the access point on Rainier will change. The access point
will be a little more north, and then we will close off the
current access point to finish Phase 4.
and delineators to keep the traffic flow
moving.
·
How will circulation through the site work
during construction? Once the driveway on
Rainier is closed, will vehicles be forced to
access the site to/from the signal at S 3rd
Place?All vehicles will have the same access
as they currently do. Once we are ready to
transfer from current DT to new DT the ac-
cess point on Rainier will change. The ac-
cess point will be a little more north, and
then we will close off the current access
point to finish Phase 4. I can hope on a call
with yourself or TENW to explain. To reiter-
ate, it is our goal to always have the DT
open and street access open.
How will circulation through the site work
during construction? Once the driveway on
Rainier is closed, will vehicles be forced to
access the site to/from the signal at S 3rd
Place?All vehicles will have the same access
as they currently do. Once we are ready to
transfer from current DT to new DT the ac-
cess point on Rainier will change. The ac-
cess point will be a little more north, and
then we will close off the current access
point to finish Phase 4. I can hope on a call
with yourself or TENW to explain. To reiter-
ate, it is our goal to always have the DT
open and street access open.