Loading...
HomeMy WebLinkAboutMFP22000199.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22000199 IVR Number: 22000199 Permit Information Permit Name: Puget Sound Energy Gas Permits Address/Location:01/13/2022Application Date:3342101555Parcel Number: 1013 N 32ND ST Permit Type:02/03/2022Issue Date:Franchise Permit Work Class:02/03/2023Expiration Date:Minor Utility Job Number: 108632995Franchise Type:Natural Gas Description: PSE Gas CREW TO RETIRE EXISTING 5/8" PE GAS SERVICE AT MAIN. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 6905 S 228TH St KENT, WA 98032 C: (253) 905-5031ApplicantX Stuart Bennett Infrasource Services LLC 1622 Eastport Plaza Dr Collinsville, IL 62234 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy - Billing 6905 S 228th St Kent, WA 98032 B: (253) 395-6346Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date DEPARTMENT OF PUBLIC WORKS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 1 of 2 | Published: 1ϭ/Ϯϱ/2019 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN (TCP) APPLICATION Published: 1ϭ/Ϯϱ/2019 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. TO THE APPLICANT: Submit the TCP application form and required submittal documents to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address. The following items, electronic copies preferred, are all required for submittal of the TCP Application: 1.܆ A copy of the Traffic Control Plan (TCP) Application form. 2.܆ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall: ܆ Include map(s) showing the location of the project and work area. ܆ Be legible lettering and clear, contrasting, symbols of viewing or printing. ܆ Must indicate street names, and north arrow and scale. ܆ All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. ܆ Types of plans required: ܆ Work hour plan – show all mobility impacts during construction hours. ܆ Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. ܆ Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. ܆ Pedestrian access/detour plan, if applicable. Project Name: ______________________________________________ Permit #: _____________________ Project Address: ____________________________________________________________________________ Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Description of Work, Work Schedule, Equipment Used: _____________________________________________ ___________________________________________________________________________________________ ___________________________________________________________________________________________ Construction Company: ________________________________________ Phone/Cell: (_____) _____-________ Applicant Name: _________________________________ Email: ______________________________________ Business Address: _________________________________ City/State: __________________ Zip: __________ Approved By: _______________________________________________ Date: ________________________ Transportation Operations Engineering Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 2 | Published: 1ϭ/Ϯϱ/2019 APPLICANT AGREES TO ALL THE FOLLOWING: x TCP must be approved prior to commencing the work, and all permit conditions shall be met. x Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. x Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. x The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of traffic. This includes set up within the traveled way or immediately adjacent to the roadway. x Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures. x Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. x TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT) and all traffic regulations of the City of Renton and Revised Code of Washington (RCW). x Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State and City codes. x Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Applicant’s agents and employees. x The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. x In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay for legal counsel chosen by the City to defend against same. x Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. x Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. x Approved Temporary TCP must be at the work site during work hours. x Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. x Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: x Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. x Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. x The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site. x Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street; 425-430-7423). _______________________________ _______________________________ _______________________ Applicant’s Signature Print Name Date 110110351017101510131007100311031107111111171203120910141006101010201024111211161104300512061212100710011013101910251105110111091222310312161212311312061217121512111124112011161115120111191125100210181024103010361112110011061202110110251019101310071009100510031107111111151119120112071213122510221028110011041108111011161122120212081214122012241016100810041002100510071009101312001120112411101116111511131103112111171125112911331205120911081102102810221016101010001004120412081212121633033308122832043302321013071303310831021302PARK AVE NN 31ST STN 32ND STN 33RD ST30'S14'S2" PE IP 14'S 9127582" PE IP 15'S 9205162" MPE IP 15'S 95252742" MPE IP 13'W 96202562 92" MPE IP 15'W 96202562" MPE IP 12'W 95252742" MPE IP 25'S 107010634-20012" PE IP 14'S 9201062" PE 14'W2" PE IP 14'S 9126282" PE IP 14'W 9126282" MPE IP 15'S 107008154-19992" MPE IP 14'W 93243722" PE IP 14'S 93243722" MPE IP 14'W 93243722" MPE IP 18'S 107013779-20021 1/8" MPEI2012-E1 1/8" MPE2013-E1 1/8" MPEI2012-E1 1/8" MPEI2012-E5/771 1/8" MPEI2015-E1 1/8" MPE2012-E1 1/8" MPEI2017-E1 1/8" MPE2017-E1 1/8" MPEI2018-E1 1/8" MPE2018-E1 1/8" MPE2017-E1 1/8" MPEI2018-E1 1/8" MPE20181 1/8" MPE2018-E1 1/8" MPE2019-E1 1/8" MPE2019-E1 1/8" MPE2013-E5/8"373'W1 1/8" MPEI2013-E1 1/8" MPEI2013-E1 1/8" MPE2014-E1 1/8" MPE2014-E1 1/8" MPEI2012-E1 1/8" MPE2013-E5/8" PE19925/8" PE19925/8" PE19935/8" MPEI2010-E5/8" PE19915/8" MPE19965/8" MPE19955/8" MPE19955/8" MPE20045/8" PE19945/8" PE19915/8" MPE20025/8" MPE19965/8" PE19915/8" PE19905/8" PE19925/8" MPE19955/8" MPEI20045/8" MPEI20035/8" PE19915/8" MPE20045/8" MPE20035/8" PE19925/8" MPE20065/8" MPEI20035/8" MPEI20045/8" PE19935/8" MPE20015/8" MPE20005/8" MPEI20055/8" MPEI20055/8" PE19945/8"259'W5/8" MPE19995/8" MPE19965/8" MPE20085/8" PE19945/8" PE19945/8" PE19925/8" MPE20071 1/8" MPE2009-E5/8" MPEI20045/8" MPEI20025/8" MPE20025/8" PE19935/8" MPE19995/8"507'E5/8" MPE20021 1/8" MPEI2008-E5/8" MPE19995/8" PEI19915/8"381'E5/8" PE19925/8" MPE19965/8" MPE19995/8" PE19925/8" MPE19995/8" PE19945/8" PE19925/8" PE19925/8" PE19925/8" PE19905/8" PE19905/8" PE1992 1 1/8" MPE-92021-E 1 1/8 MPE-92021-E028'W381'W579'W330'W680'W477'W376'E339'E774'W480'E505'E381'E830'W650'E625'E632'W672'E744'W87'N219'W96'W106'W34'N87'S161'W211'W171'W275'W269'W259'W373'E328'E372'E274'W192'W507'E690'E487'E270'W829'E778'E627'E573'W519'W484'W634'W523'E454'W429'W387'W321'W323'W-CM170'W79'W58'W109'N843'E830'E738'E42 4'W 484'W373'W582'W546'W519'W313'W359'W621'W367'W197'W34'N40'N90'S152'N18'S11'S480'W344'E834'W407'E781'E576'W39'N1202'E111911201116111611101100112013'S13'S27'N18'S377'E380'E1002991997 D2405E136, R2405E127, A2405E127S200080, Q203082The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“12-28-2021Scale 1:1312Lat\Long=47.5199, -122.2034 1007101310191025110511011109112411201116111512011119112510241030103611121100110612021101102510191013100710091107111111151119120110221028110011041108111011161122120210161008N 32ND ST2" MPE IP 15'S 107008154-19991 1/8" MPE2013-E1 1/8" MPE2012-E1 1/8" MPE20181 1/8" MPE2013-E5/8"373'W1 1/8" MPEI2013-E1 1/8" MPEI2013-E1 1/8" MPEI2012-E1 1/8" MPE2013-E5/8" PE19935/8" PE19915/8" MPE20045/8" PE19925/8" MPE20065/8" MPEI20045/8" PE19935/8" MPE20015/8" MPE20005/8" MPEI20055/8" MPEI20055/8" PE19945/8" MPE19995/8" MPEI20045/8" PE19935/8" MPE19995/8" MPE20021 1/8" MPEI2008-E5/8" MPE19995/8" MPE19995/8" PE19925/8" MPE19995/8" PE1994381'W579'W680'W477'W774'W830'W632'W744'W275'W4 2 4 'W 484'W373'W582'W313'W359'W480'W834'W11191120110013'S D2405E136, R2405E127, A2405E127S200080, Q203082The information on the attached maps is subject to change without notice. Puget Sound Energy makes no warranty, expressed or implied, concerningthe suitability of this information for any purpose. Recipient agrees to not disclose this confidential information to any other person or entity,unless authorized in writing by Puget Sound Energy. This map is not to be used for determining the actual location of any PSE facilities (call 811).“12-28-2021Scale 1:654Lat\Long=47.5199, -122.2041 Est. Start Date: & & & & & KNT FLT - Kent of CL of CL 0 Route #'s:Bollards:2.5" #4" #ADA Ramps #: Del Press:6" W.C.Traffic Signal:Bus Stop:No 0 No Parks #:0 Meter Loc:0 Trolley Lines:No Mtr Hoods #:0 Meter:Speed Limit: Cut & Cap EFV:0 Police #:0 TCP:Yes Diameter:0 Flaggers #:0 Arterial:No Tie-In Fitting of CL Service Information Street Information Job Type of CL of CL of CL of CL of CL PARK AVE N 3 X 5 X 2 A of CL 18'South of CL N 32ND STREET 774'West ROW Permit:Yes Customer:PATRICIA TINKER 206-679-4541 Work Location Size of Cut Surface Type Job Description New Construction: No Construction Method 0 PLAT Map:203.082 N Project Scope: RETIRE (CUT AND CAP) 5/8" PE SVC (1999) AT MAIN (107013779-2002); REMOVE A250 MTR Job #:108632995 Date:11/24/21 Address:1013 N 32ND ST, RENTON Puget Sound Energy Gas Pre-Inspect Form 1/17/21 PM / Inspector:Sara Hyacinthe 206-637-3169 Est. Duration:1 Day (8 Hours) Jurisdiction:RENTON City / Zip:RENTON, 98056 SIDEWALK SIDEWALK PLANTERS STRIP PLANTERS STRIP PARKING STRIP PARKING STRIP 2" MPE IP 18' S 107013779-2002 P/L P/L C/LROW PARK AVE NN 32ND STREET A250 MSA 5/8" PE 1013 NOTE: EXISTING PE SVC COULD POSSIBLY BE TIED-INTO 107008154-1999 INSTEAD OF 107013779-2002 SEWER AND WATER LOCATION UNKNOWN 1013 N 32nd St Renton WA 98056 USA1010N 32ND STW20-7AW20-4ONE LANEROAD AHEAD100'100'100'ROAD WORK AHEAD W20-1W20-7AW20-4ONE LANEROADAHEAD100'100'100'ROADWORKAHEADW20-1STOPFLAGGER PLACE SIGNSBOTH SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK PARK AVE N TEMPORARY TRAFFIC CONTROL PLANWORK PITLEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Notes:1. All signs and spacing to conform to theMUTCD and City of King County standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 774' WCL of Park Ave N @ 18'SCL of N 22nd St.NProject Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REV12/28/2021 10863299501013 N 32nd St, Renton, WA Kaitlynn Davis 209-456-0264 kaitlynn.davis@pse.com1 OF 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 012238Card Exp. 09/30/2023gregory.harwood@pse.com(425)424-6425