Loading...
HomeMy WebLinkAboutR-4214141GENERAL STATION NOTES 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE MEASURED TO THE BACK OF CURB. 2. SEE SITE PREP PLANS FOR REMOVAL OR MODIFICATION OF EXISTING METRO ASSETS AT STATIONS. 3. SEE TYPICAL STATION LAYOUTS FOR LAYOUT OF TYPICAL STATION TIER AMENITIES. 4. UNLESS OTHERWISE NOTED, STATION AMENITIES FOLLOW TYPICAL STATION LAYOUTS. 5. SEE ROADWAY TYPICAL SECTIONS AND PAVING PLANS FOR PAVING AND GRADING INFORMATION. 6. SEE DRAINAGE PLANS FOR SHELTER DRAINAGE DETAILS. 7. SEE SIGNING AND STRIPING PLANS FOR STATION SIGN INFORMATION. 8. SEE STRUCTURAL PLANS FOR RETAINING WALL AND FOUNDATION INFORMATION. 9. SEE ELECTRICAL PLANS FOR TECH PYLON AND POWER PEDESTAL DETAILS. 10. SEE ILLUMINATION PLANS FOR STATION LIGHTING INFORMATION. 11. SEE SHEET 1$6.01 FOR BENCH, TRASH CAN, AND BIKE RACK DETAILS. 12. SEE SHEET 1S5.01 FOR PEDESTRIAN GUARDRAIL AND BOLLARD DETAILS. p2 NEW SITE FURNITURE/FIXTURE NOTES 1. BENCHES, LITTER RECEPTACLES AND BIKE LOOPS: METRO TRANSIT WILL FURNISH, TRANSPORT AND INSTALL THE SITE FURNITURE AT EACH BUS ZONE. i 2. PEDESTRIAN LIGHT POLES AND LUMINARIES: CONTRACTOR SHALL BE RESPONSIBLE TO INSTALL FOUNDATIONS FOR PEDESTRIAN LIGHT POLES AND LUMINARIES. TASKS SHALL INCLUDE PROVIDING AND INSTALLING J-BOLTS, CONDUITS, GROUNDING RODS, REBARS, AND OTHER MATERIALS FOR THE FOUNDATIONS. OBTAIN LIGHT POLE BASE BOLT CIRCLE PRIOR TO SETTING FOUNDATIONS. UNLESS STATED OTHERWISE ON THE ELECTRICAL SITE PLANS, METRO TRANSIT WILL SUPPLY PEDESTRIAN LIGHT POLES AND LUMINARIES. CONTRACTOR SHALL PICK UP AND TRANSPORT THE LIGHTING HARDWARE FROM METRO SOUTH FACILITIES TO A EACH PROJECT SITE. METRO'S SOUTH FACILITIES IS LOCATED AT 11911 EAST MARGINAL WAY S, BUILDING C, TUKWILA, WASHINGTON 98168. CONTACT MATT RAWSON AT (206) 263-5681 AT LEAST 72 HOURS IN ADVANCE. CONTRACTOR SHALL PROVIDE ALL HARDWARE AND CONDUCTORS REQUIRED TO CONNECT AND THE PEDESTRIAN LUMINARIES TO THE POWER PEDESTAL OR OTHER POWER SOURCEAS SHOWN ON 0 ELECTRICAL PLANS AND TO MAKE THE LUMINARIES FUNCTIONAL. rc 3. BUS SHELTERS, RAPIDRIDE TECHNOLOGY PYLONS, AND BLADE MARKERS: METRO TRANSIT WILL PROVIDE, TRANSPORT, AND INSTALL THE FIXTURES/FURNITURE UPON COMPLETION OF THE SITE WORK, INCLUDING o THE POWER CONNECTION FROM THE FOUNDATIONS TO THE FIXTURES/FURNITURE. CONTRACTOR SHALL PROVIDE CONDUITS AND PULL CONDUCTORS BETWEEN POWER SOURCE AND THE FOUNDATIONS. x 4. BUS SIGNS, UNLESS OTHERWISE SPECIFICALLY INDICATED ON THE DRAWINGS, METRO TRANSIT WILL FURNISH AND INSTALL BUS SIGNS AT THE ZONES. 3 & 5. OTHER FURNITURE AND HARDWARE NOT MENTIONED IN THIS LIST: FURNISH AND INSTALL OTHER FURNITURE/HARDWARE NOT LISTED BUT SHOWN ON THE DRAWINGS. i z 0 V 0 w a 0 rc A x z 0 h Z� O K 0 O to st ip O 8 O N_ KQ 5 3 `o.y$ S=m >y GESIGXEU'. pPpR04E0: q 60% SUBMITTAL WN Saco s A. VILLAR P. ENG King County C. ECKEDwOx D RQE q METRO �ox it S. FORMAN E00588E18 CHECKED: COMFACTNO'. p w No. RE": ISIGv BY GPPD J:TE METRO PROJECT ENGINEER G)JOCO I METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT STATION GENERAL NOTES NOVEMBER 2021 DR ING NO'. sHE*xoSD1F.00 141 XXXX R-421414