Loading...
HomeMy WebLinkAboutR-4214184IIJ If No S6_ S5 a� Q � N r L OC Z D J c S3 22+00 uJLN-J O POINT A LOW SIDE (STA) S7 O POINT B LOW SIDE OT (STA) N ^ (LT) LEFT I S1 I (RT) RIGHT PARALLEL CURB RAMP EXAMPLE NTS 60% SUBMITTAL R-,WK N BY I AFRO I DATE TALBOT RD S (TAL-B-LINE) I1 A Jacobs 23+DO LEGEND HMA FULL DEPTH CEMENT CONCRETE LANDSCAPING DETECTABLE WARNING SURFACE CEMENT CONCRETE CROSSWALK DOWNTOWN CEMENT CONCRETE SIDEWALK ---- RIGHT OF WAY (EXISTING) RIGHT OF WAY (PROPOSED) CURB RETURN SCHEDULE GENERALNOTES 1. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS. 2. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF CURB ARE FLOWLINE ELEVATIONS. 3. FOR MEDIAN DETAILS, SEE CIVIL DETAILS. INTERSECTION NOTES iO PARALLEL CURB RAMP PER WSDOT STD PLAN F40.12-03 (D PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F40.15.04 (D SINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.18.03 0 DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10-02 RETURN PC - STA, OFFSET PT- STA, OFFSET RADIUS LENGTH DELTA PC 1/4 1/2 3/4 PT O TAL-B 22+04.70, 42.57' RT TAL-B 22+49.35, 81.92' RT 45.09 65.02' 82"47'05" 32.14 32.26 32.39 1 32.51 32.64 CURB RAMP TABLE LEFT RIGHT CURB RAMP WING WING LENGTH AT RAMP TYPE RAMP RAMPWIDTH POINTA(STA) POIINTB(STA) S7% S2% S3% S4% S5% S6% S7% S8% S9% WIDTH WIDTH CENTER (MIN (MIN (MIN PARALLEL A 1 8.45 5.00, 6.50, 8.00, TAL-B 22+03.77 TAL-B 21+98.77 0.78 1.50 6.70 6.92 1.00 8.17 6.81 1.50 1.50 PARALLEL A 2 9.22' 5.00, 8.00, 8.00, TAL-B 22+45.43 TAL-B 22+43.05 0.78 1.50 6.22 5.50 0.42 7.52 6.69 1 1.50 1.50 0' 10, 20' SCALE: 1"=10' oe wwe�.o T° "`"'""`" A. VILLPR P. ENG ._ METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE "" - NOVEMBER 2021 DR)km : m m cWILCOXox . L9 King County METRO RENTON SEGMENT INTERSECTION GRADING & CURB RAMP PLAN CHECKED: S. FORMEN566E18 HRQIECTND: DRAWING NO. 106.11 m'�AONAL8�0 TALBOT RD S & S RENTON VILLAGE PL CHECKED CONTRA`TND' SHFEi NO' OF METRO PROJECT ENGINEER CXXXXXXXX 184 XXXX R-4214184