HomeMy WebLinkAboutR-42141951
E3
0
02
2
108TH AVE SE (SR 515)
54+00
7/-' (108TH-LINE)
n
O
POINT A
LOW SIDE
(STA)
S7
POINT B
LOW SIDE
(STA)
^ oil
(LT) LEFT I Si I (RT) RIGHT
PARALLEL CURB RAMP EXAMPLE
NTS
4
LEGEND
HMA FULL DEPTH
CEMENT CONCRETE
LANDSCAPING
DETECTABLE WARNING SURFACE
CEMENT CONCRETE CROSSWALK
DOWNTOWN CEMENT CONCRETE SIDEWALK
RIGHT OF WAY (EXISTING)
RIGHT OF WAY (PROPOSED)
GENERALNOTES
1. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS.
2. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF
CURB ARE FLOWLINE ELEVATIONS.
3. FOR MEDIAN DETAILS, SEE CIVIL DETAILS.
INTERSECTION NOTES
iO PARALLEL CURB RAMP PER WSDOT STD PLAN F40.12-03
(D PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F40.15.04
(D SINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.16.03
0 DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10-02
CURB RETURN SCHEDULE
RETURN
PC -STA, OFFSET
PT-STA,OFFSET
RADIUS
LENGTH
DELTA
PC
1/4
1/2
1 3/4
1 PT
O
108TH 54+27.44, 29.43' LT
I 108TH 54+62.44, 64.86' LT
35.00'
55.40'
90"41'45"
457.10
1 456.67
1 456.49
1 456.31
1 456.41
CURB RAMP TABLE
LEFT
RIGHT
CURB RAMP
WING
WING
LENGTH AT
RAMP TYPE
RAMP
WIDTH
RAMPWIDTH
WIDTH
CENTER
POINTA(STA)
POINTB(STA)
S1%
S2%
S3%
S4%
S5%
S6%
S7%
S8%
S9%
MI
MI
MI
PARALLEL A
1
9.50,
5.93,
5.94'
5.00'
108TH 54+48.92
108TH 54+53.28
1.30
1.50
6.56
7.12
1.40
T60
8.10
1.50
1.50
T
0' 10, 20'
SCALE: 1"=10'
o "` METRO TRANSIT CAPITAL DIVISION
60 /D SUBMITTAL DRAM
Jacobs AVILUR P. ENG RAPIDRIDE I LINE NOVEMBER 2021
``�, King County
C. WILCOX
CHECKED. PROUECTNO, RENTON SEGMENT DRAWING NO.
it
S. FORMPN EW566E18 METRO INTERSECTION GRADING & CURB RAMP PLAN 106.22
n a rr:N Rr aPPG DATE CHECKED COmmCTNO 108TH AVE SE & SE 192ND ST GHEERNO' OF
METRO PROJECT ENGINEER CXXXXXXXX 195 XXXX
R-4214195