Loading...
HomeMy WebLinkAboutR-42141951 E3 0 02 2 108TH AVE SE (SR 515) 54+00 7/-' (108TH-LINE) n O POINT A LOW SIDE (STA) S7 POINT B LOW SIDE (STA) ^ oil (LT) LEFT I Si I (RT) RIGHT PARALLEL CURB RAMP EXAMPLE NTS 4 LEGEND HMA FULL DEPTH CEMENT CONCRETE LANDSCAPING DETECTABLE WARNING SURFACE CEMENT CONCRETE CROSSWALK DOWNTOWN CEMENT CONCRETE SIDEWALK RIGHT OF WAY (EXISTING) RIGHT OF WAY (PROPOSED) GENERALNOTES 1. ALL ELEVATIONS SHOWN ARE FINISHED GRADE ELEVATIONS. 2. UNLESS OTHERWISE NOTED, SPOT ELEVATIONS LOCATED AT FACE OF CURB ARE FLOWLINE ELEVATIONS. 3. FOR MEDIAN DETAILS, SEE CIVIL DETAILS. INTERSECTION NOTES iO PARALLEL CURB RAMP PER WSDOT STD PLAN F40.12-03 (D PERPENDICULAR CURB RAMP PER WSDOT STD PLAN F40.15.04 (D SINGLE DIRECTION CURB RAMP PER WSDOT STD PLAN F-40.16.03 0 DETECTABLE WARNING SURFACE PER WSDOT STD PLAN F-45.10-02 CURB RETURN SCHEDULE RETURN PC -STA, OFFSET PT-STA,OFFSET RADIUS LENGTH DELTA PC 1/4 1/2 1 3/4 1 PT O 108TH 54+27.44, 29.43' LT I 108TH 54+62.44, 64.86' LT 35.00' 55.40' 90"41'45" 457.10 1 456.67 1 456.49 1 456.31 1 456.41 CURB RAMP TABLE LEFT RIGHT CURB RAMP WING WING LENGTH AT RAMP TYPE RAMP WIDTH RAMPWIDTH WIDTH CENTER POINTA(STA) POINTB(STA) S1% S2% S3% S4% S5% S6% S7% S8% S9% MI MI MI PARALLEL A 1 9.50, 5.93, 5.94' 5.00' 108TH 54+48.92 108TH 54+53.28 1.30 1.50 6.56 7.12 1.40 T60 8.10 1.50 1.50 T 0' 10, 20' SCALE: 1"=10' o "` METRO TRANSIT CAPITAL DIVISION 60 /D SUBMITTAL DRAM Jacobs AVILUR P. ENG RAPIDRIDE I LINE NOVEMBER 2021 ``�, King County C. WILCOX CHECKED. PROUECTNO, RENTON SEGMENT DRAWING NO. it S. FORMPN EW566E18 METRO INTERSECTION GRADING & CURB RAMP PLAN 106.22 n a rr:N Rr aPPG DATE CHECKED COmmCTNO 108TH AVE SE & SE 192ND ST GHEERNO' OF METRO PROJECT ENGINEER CXXXXXXXX 195 XXXX R-4214195