Loading...
HomeMy WebLinkAboutR-4214225GENERAL NOTES 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. ALL PROPOSED CATCH BASINS SHALL HAVE VANED GRATES, PER CITY OF RENTON PAD STD PLAN 204.20 STORM DRAINAGE NOTES OADJUST INLET OR CATCH BASIN TO GRADE OADJUST MANHOLE TO GRADE na 3 e�� ADJUST STORM DRAIN MANHOLE WITH V RISER Nu O N ° O4 REMOVE INLET OR CATCH BASIN o Cn m ^' O REMOVE STORM DRAIN PIPE ° 3 CV �� < �I =� 8 : p m a O6 REPLACE GRATE WITH SOLID LOCKING METAL COVER PER $me� imw CITY OF RENTON PWD STD PLAN 204.10 NvN _ _ 1 SDCB (1-E28) N O W m ii a �. o O7 CONNECTION TO EXISTING DRAINAGE STRUCTURE 108TH 53+41.32, 41.32 LT "" P� o Cn ^ s �_ p e m ° RIM EL=461.10 0 'n^ II ---'^ -�c, (DINSTALL CATCH BASIN TYPE PER $en sm IE - 458.30 1 E) IN p N n ^'u a' n z x ° n CITY OF RENTON PWD STD PLAN 200.00 W_Q5` xo kn IE=457.50 W OUT N° m'�%,o cow oP 9Eoo ( ) em wU W \ w pm - NN NaN WOW a 3 m --'" p��pwww O9 INSTALL CATCH BASIN TYPE 2 PER N a m n a j t a w W 3 i o o CITY OF RENTON PWD STD PLAN 201.00 h „0 _'"N mm �'3 - ps ?am 3 a0 SOFZ 10 INSTALL 4'x4'FILTERRA WATER QUALITY UNIT rco \ WN - " x!'In a od s 11 INSTALL 4'x6'FILTERRA WATER QUALITY UNIT \ n°. m3 5 w wm — ° — a r Wp min i Resv 7 5 �-�, � -' -P � �� \� oS w 8 12 INSTALL 4x8'FILTERRA WATER QUALITY UNIT J° o Gds SDCB (1-E30), TYPE 1 0mm ssva° os 12 LF 8" SO I108TH 54+29.70, 28.04 LT - - _ -_ - _ - _ _ - _ _ _ 13 INSTALL 4N4' MODULAR WETLAND WATER QUALITY UNIT -- - - -- - - v,a ®� _ II II RIM EL=456.12 - -- d �, ...) 1' _ ` It. (J LJ IE=455.40 11 INU Mo _ 14 INSTALL 4'x6'MODULAR WETLAND WATER QUALITY UNIT IE=454.90 (12"W)OUT x d 15 INSTALL 4'x8' MODULAR WETLAND WATER QUALITY UNIT 86 LF 8"SD 3 O M M M M M 0 M M IS — „ a sI°aaaauv SEE VOLUME � (6 INSTALL FLOW CONTROL STRUCTURE PER FOR CITY OF KENT / oNp o CITY OF RENTON PWD STD 237.00 18 0 3UC I IMPROVEMENT + + + a 55+0 0 57+00 17 CONNECTION TO EXISTING PIPE INSTALL STATION SHELTER DOWNSPOUT THROUGH CURB 1 TH-LINE SDCB (1-35) TYPE 1 c DRAIN, PER DETAIL 1/1 DRD.02 8 108TH 53+41.32, 28.14 LT oo e m m °�' o ✓� 1 _ �_ y_ _ 1 �T _ 19 INSTALL STATION SHELTER DOWNSPOUT TO LANDSCAPING, a° -RIM EL = 460.90 z� 1 1 1 1 C PER DETAIL 1/1 DRD.03 IE = 457.44 IS" E) IN IE = 455.83 IS" S) OUT z -r-� DHc d d d d as a5 as - s as as as o cK / cD v 20 INSTALL I2'X6'OIL WATER SEPARATOR UNIT PER CITY OF TD;H OWN MO vda OWN > mD RENTON PWDSTD240.10 — — — naGN° — -•^ rHo- LEGEND a n oa O N ; etl �ssva°— NI'h) b o (w,.+ o +enm MS ON00 m ` EXISTING CATCH BASIN \ p. O EXISTING MANHOLE -- ".pa8NIK m mO�D'� o sD dddd EXISTING STORM DRAIN PIPE Nnw �Nh� F jo U' ' N a�N m J Zwa 11 �mwO W' Emg.ea p° I w ■ CATCH BASIN TYPE a«o� WNW W " Wmm °a ° �I o e W o x Fm I I 0 w O m o -- I O CATCH BASIN TYPE 2 Qz_—SD— STORM DRAIN PIPE WNW I n� nsww o I 1 om i I y �( z 0' 20' 40' SCALE: 1"=40' DESIGNED'. pPpRWEO: DATE: o METRO TRANSIT CAPITAL DIVISION 60 /o SUBMITTAL 7 �Sso g13 9� ,JGREEN P.ENG RAPIDRIDE I LINE NOVEMBER2021 Jacobs yA r " H /�o JOHNSON King County ff��;y�✓� CHECKED: RNaEI METRO RENTON SEGMENT DR<wiNG NO p°FSF°STEpEN°2��p J.ETNLA588E18 IN E00DRAINAGE PLAN 1C7.23 No REvrioN Ev APDo ��TE CHECKED. D°"D"`TN°' 108TH 52+00 TO 108TH 57+00 GNEET"° DE METRO PROJECT ENGINEER CXX%RRRRX 225 XXXX R-4214225