Loading...
HomeMy WebLinkAboutR-4214230BACK OF PLATFORM- CONCRETE OR LANDSCAPE AREA 0- 8 FRONT OF SHELTER PLATFORM - BACK OF SIDEWALK STEELCANOPY ST OTHERS, SEE SHEI SPECIFICATIONS SHELTER PLATFORM - DRAINAGE PLAN - RIGHT CONFIGURATION DETAIL �1 SCALE: 1" = 1' - rn N I Ur anMu MR ry I rvnln r o,UevvnLn 4 HOLE 60% SUBMITTAL No I R7,ISMA SHELTER PLATFORM - DRAINAGE PLAN - LEFT CONFIGURATION DETAIL SCALE: V' = 1' - By 1 APP'D I -ATE .;acobs SEA. WI(q y Q pO FRFCSTEhE002�W SSEN J. GREEN DRNM H. JOHNSON CHECKED J.ETOLAIN JONAL CHECKED' METRO PROJECT ENGINEER GL HOLE 1 4 HOLE HOLE HOLE GENERAL NOTES: 1. SHELTERS AND TECH PYLONS TO BE OWNER FURNISHEDICONTRACTOR INSTALLED. DETAIL INFORMATION SHOWN HERE IS FOR REFERENCE AND COORDINATION PURPOSES ONLY. 2. SEE STRUCTURAL DRAWINGS FOR FOUNDATION LIMITS AND REBAR SPACING. 3. ALL UTILITIES ARE NOT SHOWN. SEE OTHER DISCIPLINE DRAWINGS FOR UTILITY INFORMATION. 4. SEE CIVIL PLANS FOR SIDEWALK CONSTRUCTION. 5. REFER TO STATION PLANS TO DETERMINE LEFT OR RIGHT CONFIGURATION. ALTERNATIVE - 2: STORM DRAIN ROUTED ABOVE SLAB TO BACK OF PLATFORM TO LANDSCAPE AREA. SEE DRAINAGE PLANS HOLE FOR ELECTRICAL, BY OTHERS HOLE FOR DOWNSPOUT BASE PLATE BY OTHERS COL BY OTHERS ALTERNATIVE-1: STORM DRAIN ROUTED IN SLAB THROUGH SIDEWALK TO FACE OF CURB AND GUTTER. SEE DRAINAGE PLANS SHELTER COLUMN - DRAINAGE CONFIGURATION P. ENG King County METRO PHa E00566E18 8E18 �R METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SHELTER DRAINAGE DETAILS 1 OF 8 NOVEMBER 2021 1 DRD.01 rxv>_:eec.1 R-4214230