HomeMy WebLinkAboutR-4214251i
ri
NOTES
1. SEE SHEET 1C4.00 FOR GENERAL SITE PREPARATION NOTES.
2. SITE PREPARATION SHOWN FOR REFERENCE PURPOSES ONLY. SEE
SITE PREPARATION PLAN SHEETS FOR LIMITS OF WORK.
TESC NOTES
0 INSTALL INLET PROTECTION AT EXISTING OR PROPOSED CATCH
BASINS PER CITY OF RENTON STD PLAN 216.30
0INSTALL SILT FENCE PROTECTION PER CITY OF RENTON STD PLAN
214.00
OINSTALL TEMPORARY SEDIMENT BERM
GINSTALL COMPOST SOCK PER WSDOT STD PLAN 1-30.40-02
SITE PREP AND TESC LEGEND
REMOVE ASPHALT PAVEMENT
REMOVE CEMENT CONCRETE PAVEMENT
REMOVE CEMENT CONCRETE SIDEWALK
CLEARING AND GRUBBING
REMOVAL ITEM
---- RIGHT-OF-WAY(EXISTING)
RIGHT-OF-WAY (PROPOSED)
TEMPORARY CONSTRUCTION EASEMENT
❑ INLET PROTECTION - EXISTING CB
■ INLET PROTECTION - PROPOSED CB
In HIGH VISIBILITY SILT FENCE
- TEMPORARY SEDIMENT BERM
COMPOSTSOCK
Bl 20' 40'
SCALE IN FEET
DESicNED. PSRRONED: DATE:
o METRO TRANSIT CAPITAL DIVISION
60 /o SUBMITTAL 7 SE .w¢, w P.ENG RAPIDRIDE I LINE NOVEMBER2021
Jacobs
'�S O4 WA3y9 DR x King County
y
DREDNED: RRwEDTxD: METRO RENTON SEGMENT DRnwiNDN°.
Q
pOFsecrsr���aE`� XXX E00588E18 TESL PLAN 1EC1.12
No. REvrioN Ev nPDo SATE CHECKED D°"°"`TN°' TAL-21 24+00 TO TAL-21 29+00 DHEETNO OF
METRO PROJECT ENGINEER CXX%%%%%X 251 XXXX
R-4214251