HomeMy WebLinkAboutR-42143370
E
O
O
00
60%D TO BE SUBMITTED AT A LATER DATE
- _ — _ — — — _ — —
I
i 07� 4110-0010
108TH AVE SE (SR 515)
19+00
+ (108TH-LINE)
60% SUBMITTAL
No. I REvrI'A
By 14PPE I --TE
.;acobs
METRO PROJECT ENGINEER
0
22+00
23+00
- +
T _ _
322305-91
0' 20' 40'
SCALE: V = 20'
MPRMD:
P. ENG
King County
PaaE6EDD METRO
E00588E18
�3
GENERALNOTES
1. SEE SHEET 1C8.00 FOR GENERAL SIGNING & STRIPING NOTES.
LEGEND
EXISTING SIGN i PROPOSED SIGN
SIGNING AND STRIPING NOTES
0 YELLOW DOUBLE CENTERLINE PER WSDOT STD PLAN M-20.10-03.
QYELLOW CENTERLINE PER WSDOT STD PLAN M-20.10-03
0WHITE LANE LINE PER WSDOT STD PLAN M-20AD-03
4O YELLOW TWO-WAY LEFT -TURN CENTERLINE PER WSDOT STD PLAN
M-20.10-03
OWHITE WIDE SOLID LANE LINE PER WSDOT STD PLAN M-20.10-03
O6 WHITE WIDE DOTTED LANE LINE PER WSDOT
STD PLAN M-20.10-03
OEDGE LINE AND SOLID LANE LINE PER WSDOT STD PLAN M-20.10-03
(D TRAFFIC ARROW TYPE 2SL PER WSDOT STD PLAN M-24.40-02
(D TRAFFIC ARROW TYPE 2SR PER WSDOT STD PLAN M-24.40-02
10 TRAFFIC ARROW TYPE 1 S PER WSDOT STD PLAN M-24.40-02
0 THERMOPLASTIC CROSSWALK PER CITY OF RENTON STD PLAN 127
12 THERMOPLASTIC PARALLEL CROSSWALK AND STOPBAR MARKING
PER CITY OF RENTON STD PLAN 128
13 TRAFFIC LETTERS PER WSDOT STD PLANS M-80.10-01 AND M-80.30-00
14 TRAFFIC ARROW TYPE 3SR PER WSDOT STD PLAN M-24AD-02
15 PAINT CURB (COLOR AS NOTED)
YIELD LINE SYMBOL PER WSDOT STD PLAN M-24.60-04
17 BUS ZONE PAINTING PER DETAIL 1 ON METRO STANDARD PLAN D108
18 RED BUS LANE PAVEMENT MARKINGS PER DETAIL A ON SHEET
1CD.01
19 RAISED BIKE LANE MARKINGS PER DETAIL ON SHEET iC5.01.
20 BIKE LANE BUFFER PER DETAIL C ON SHEET 1CD.01
(D BIKE LANE DRIVEWAY CROSSINGS PER DETAIL C ON SHEET 1CD.01
22 CROSS BIKE PAVEMENT MARKINGS PER DETAIL D ON SHEET 1CD.01
23 REDUCED BIKE LANE BUFFER PER DETAIL G ON SHEET 1CD.02
24 SHARED BIKE LANE MARKING PER MUTCD FIGURE 9C-9
25 BICYCLE LANE LAYOUT AT INTERSECTIONS PER DETAIL I ON SHEET
1CD.02
26 INSTALL NEW SIGN (AS NOTED)
27 RELOCATESIGN
28 REMOVE SIGN
29 MODIFY SIGN
OWHITE DIAGONAL CROSSHATCH MARKING PER WSDOT STD PLAN
M-24.60-04
(D THERMOPLASTIC CROSSWALK PER WSDOT STD PLAN M-15.10-01
32 STOP LINE MARKING PER WSDOT STD PLAN M-24.60-04
33 SURFACE MOUNTED FLEXIBLE GUIDE POST (TYPE YY) PER WSDOT
STD PLAN M40.10-03
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
SIGNING & STRIPING PLAN
108TH 18+00 TO 108TH 23+00
NOVEMBER 2021
1 C8.21 A
337 XXXX
T-421437
R-4214337