Loading...
HomeMy WebLinkAboutR-4214353I No E 60% SUBMITTAL REVI;Iov By 14PPD I BATE .;acobs NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.03C. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.05B AND 1TS1.05D. 4. FOR CONSTRUCTION NOTES SEE 1TS1.03B. 5. FOR ILLUMINATION PLANS AND DETAILS SEE XXXXX. 6. FOR ITS PLANS AND DETAILS SEE XXXXX. 7. NEW VEHICLE SIGNAL HEAD 24 AND NEW BICYCLE SIGNAL HEAD 11 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "H" ON EXISTING LIGHT POLE PER WSDOT STANDARD PLAN J-75.10. 8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 29 AND 48 SHALL BE INSTALLED WITH NEW MOUNTING TYPE 'W ON NEW TYPE I POLE PER WSDOT STANDARD PLAN J-75.10. 9. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28 AND 49 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "C" ON NEW TYPE I POLES PER WSDOT STANDARD PLAN J-75.10. J. DAMS DRAWN J. DANS cxEcxeo T 90�RFC,i� M.WEGENER `isYpA,Ay ECG CHECKED METRO PROJECT ENGINEER PHASE DIAGRAM 5 NOT BIKE USED 2 6 NOT USED 3 7 NOT NOT USED USED 4 8 NOT USED D PROTECTED VEHICLE MOVEMENT C—PC—> PEDESTRIAN MOVEMENT �> BIKE MOVEMENT PRE-EMPTION SCHEDULE CHANNEL PHASES A&B 2 C 4 P. ENG King County METRO PxH,E6Exo E00558E18 �� SIGNAL HEADS EXISTING NEW O12" 1T R 17 w120 1r v 1r OG 12" 12" G 12" 21,22,23, 11 24 41,42 28, 29, 48, 49 APS PUSH BUTTON MESSAGES PHASE AUDIBLE MESSAGE 1 "WAIT" "WAIT" "WAIT TO CROSS SECOND 2 AT SHATTUCK" 'WAIT" "WAIT TO CROSS SHATTUCK 4 AT SECOND" CQIWK ONE WAY No TURN ON RED s1 ONLY Sa R6-1 (L) SPECIAL pB'WX24"H) R10-11b (36" W x 36" H) S2 METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN S 2ND ST & SHATTUCK AVE S N 0' 10, 20' SCALE: 1" = 20' NOVEMBER 2021 1 TS 1.03A I 353 XXXX T-421453 R-4214353