Loading...
HomeMy WebLinkAboutR-42144080 WIRING SCHEDULE RUN NO. QCONDUIT SIZE CONDUCTORS REMARKS 1 3"PVC 1-48SMFO 2 3"PVC 2-12SMF0" "REINSTALL 3 3" PVC SDOT 1-288SMF0" "REINSTALL BY SEATTLE IT 4 EX. 2" SOOT 1-288SMF0"" "REMOVE EX. 1-288CT AND REINSTALL BY SEATTLE IT GENERALNOTES 1. SEE SIGNAL PLANS ITS1.06 FOR ADDITIONAL WORK AT THE INTERSECTION. CONSTRUCTION NOTES OREMOVE EXISTING SMALL CABLE VAULT. O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. 4O INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02. rcTRENCH AND INSTALL x O CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. d o O INSTALL CONDUIT(S) TO EXISTING JUNCTION BOX. rc 13 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER TRUNK. PULL BACK EXISTING LATERALS INTO SIGNAL CABINET FOR X REINSTALLATION. 17 BORE AND INSTALL CONDUIT, ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. �G I '^ Nn ° o� _ 22 SPLICE SLACK FIBERS ERS IN THE TO FIBER OPTIC SPLICE DIAGRAM 112.03-11 IN o COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN i o'e `/ oZ Off THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. r / x N5 G 0 ° d � ssa 915460.0010 P T T T - T O 0� --- ---_-- — - ---- —T-- P P T1 No sa — _ _ — — — So4 �i J 5 - w >I W 4 �' 10+00 ' 11+00 TALBOT RD S 12+00 _ yr e 13+00LLI a I 2 o I 17 (TAL-B-LINE) Q Q _ 3 I (n o 25+27 3 i O o LEI e G G O V rc LL1 G G G G G O.2,rQ G G (n o G G 0 + ^- o s5D SD SD SD SD SD SD fig— GAG A ® m WN-_-W D G G G G G G G �\ a aG LLI Z o W G ' e Q ° W G— / J 13 -RELOCA: FED F�m W G IC SIGNAL A11jBI1�IIINjI1�11IIIT 1N1 T x O O _ P 3 J Q _ x � v I 2oz 1 4 � 11111111 O e -- P ° / g3 0 E>. ZI - -_ = 3 °� /Jz J J% 11 5 / / O oQS/ oe/ 192305-9023 20' 49 01 o S I o0 0 2 �� / SCALE: 1"=20' mi MATCH LINE GRA 24+00 — SEE SHEET 111.07 x 2 aF DESIGNED. WIPIR ID DATE: 60 o METRO TRANSIT CAPITAL DIVISION /o SUBMITTAL NOVEMBER 2021 PN aG M.POWERS P. RAPIDRIDE I LINE sixvmd Saco s°F.,DRAW _ ♦`��..--++�� ° �' LIU L9 King County CHECKED : aawEcrxD: RENTON SEGMENT DBnwmD NO boo.. A ^egece.2 °l{�p S.RJNHMAN EW588E18 METRO INTERCONNECT PLAN 111.08 AONp4 CHECKED: LIXIiMCTNJ'. SHFEi NO' OF w < n R-, WK rA BY aPPG DATE c o n co r '`'° ` GRA 24+00 TO TAL-B 14+00 u E ENGINEERING METRO PROJECT ENGINEER C)ODDGDXX 408 XXXX T-4214108 R-4214408