WIRING SCHEDULE
RUN NO.
QCONDUITSIZE
CONDUCTORS
REMARKS
1
3" PVC
WSDOT 1-12SMFO*, SDOT 1-288SMFO**
*REINSTALL, **REINSTALL BY SEATTLE IT
2
2" PVC
WSDOT 1-12SMFO*
*REINSTALL
3
3" PVC
SOOT 1-288SMF0**
**REINSTALL BY SEATTLE IT
\
202305-9007
���
•:
AP
ww
S�
— -
P � T T
— =S —
SS
SS
o .
GS SS sS
� 1s+oo
o
4
i
3 —
G
G
/ G OS
G p5
M
7
60% SUBMITTAL
R-JdK N
BY I APPD I DATE
juuu 01
"V' 1 17Z�.
dH0 0
dH0 RdHd
dHO H
SQ
-..,, anu�
dH0�
I
CONSTRUCTION NOTES
O3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04.
O5 TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES.
O7 INTERCEPT EXISTING CONDUIT AND EXTEND TO NEW JUNCTION BOX.
17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA
DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION.
o
2
—LJ
M M
M w —
Ln
LLJ
+oo
--3
TAL-B•LINE +U — - � o
_ G — G a rN
d G G G m
I
IJ
S
M W
Z
I
-J
O r T
1 dH0 <
Ho
IHO dH0 1 dH0 CIHO �j
., dH0 N d
.Jacobs PO PG M. CRAM S PENGcV
V O4 WA`SHI � MNWN:
m`'Eryo�C�'
CHECKED xxaEcrxD:
^EeIerS.RAHMPN 566E18eoncord (CoNmUYJA
E N G I N E E R I N G METRO PROJECT ENGINEER CX%RRRRRX
—dH0(27
—dH0
�dHO— �dE
dH0 —
d
dNo�'HO � dL,
L9 King County
METRO
0' 20' 40'
SCALE: 1"=20'
DAM
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE NOVEMBER 2021
RENTON SEGMENT
INTERCONNECT PLAN
TAL-B 14+00 TO TAL-B 18+50
11�
sxEE*xD Dr
a10 xxxx
T-4214110
R-4214410