HomeMy WebLinkAboutR-4214445e3
0
x
WIRING SCHEDULE
CONDUIT
WIRE
SPAN OR
EXISTING
STREET
PEDESTRIAN
CONDUIT SIZE
CONDUCTORS
LIGHTING
LIGHTING
GROUND
NOTES
2" PVC
2/C#10
146
1
STUBOUT V FROM EDGE OF CONCRETE
2" PVC
FOUNDATION, CAP FOR FUTURE USE
2" PVC
246
146
2
2"PVC
SPARE
2" PVC
446
1-46
3
2"PVC
SPARE
W
LJ
2
(n
NOTES
1. SEE SHEET 11-1.141 FOR STREET LIGHTING GENERAL NOTES.
2. SEE SIGNAL DRAWINGS FOR ADDITIONAL CONDUIT, AND WIRING AT THE INTERSECTIONS.
3. SEE SHEET 11-2.01 FOR WIRING SCHEMATICS.
4. SEE SHEET 112.05 FOR POLE SCHEDULES.
CONSTRUCTION NOTES
iO INSTALL NEW STREET LIGHT POLE AND FOUNDATION WITH NEW LED FIXTURE PER
Q
CITY OF RENTON STANDARD PLAN 117.1.
s
O INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-00.10-04,
O
O REPLACE EXISTING LUMINAIRE ON EXISTING POLE.
C/)
DISTRIBUTION JUNCTION BOX. SEE SIGNAL DRAWINGS FOR DETAILS.
0' 20' 40'
SCALE: 1"=20'
' METRO TRANSIT CAPITAL DIVISION W 60% SUBMITTAL
Jacobs XCHEN PEND RAPIDRIDE I LINE NovEMBERzoz1
�c�� oRowN:
q g W. DING kla King County
NECKED PRWECTN°, RENTON SEGMENT DRAWING NO
p METRO
�.�aEq,°E�o td4` X. ZHANG E00558E18 LIGHTING PLAN 1L1.10
N°. Re ls;l BY APPD DATE ° CHECKED
`°"°"`T"° TAL-B 18+50 TO TAL-B 23+50 NHEE'"°OF
METRO PROJECT ENGINEER C)JOOD)0( 445 XXXX
T-4214145
R-4214445